7/26/2019 Weld Summary Performance
1/11
Page 1 of 10
Power Italia Document Number
ABSORBER ERECTION: DIMENSIONAL INSPECTION: With Client Completed till ring 8
ABSORBER WELDING:
TYPE Q.ty m. Completed REPAIR REPAIR II
VERTICAL Welds: 10 1
HORIZONTAL Welds
TOTAL 7 1
WELDERTOTAL
20
Horizontal
Weld
6
Combined
Process
4CC/SS
Vertical
Weld
5 5
181
64
10
74
115
66
QUALITY DATA
Public Power Corporation
SUMMARYRevised the procedure applicable and issued some Work Instruction, send for revised and approval.
- All drawing are put in Plone and revised daily basis from H.O.
- Agreed with Document Controller received on monthly basis one DVD updated.
Raised NCR N 3 and closed (starded the seal weld on the stiffners)Open varance log on the:
- Civil Scaffolding on the limestone area, could raised problem.
- Open variance log on the Absorber scaffold in order to be comply with the local law/regulation
Week 42 Date 15/10/2007
Job n 18126 Megalopol is III
1762 559
SITE INSPECTION
NDE To
Be Done
NDE
Done
1463 467
298,5 92
-
7/26/2019 Weld Summary Performance
2/11
-
7/26/2019 Weld Summary Performance
3/11
-
7/26/2019 Weld Summary Performance
4/11
-
7/26/2019 Weld Summary Performance
5/11
-
7/26/2019 Weld Summary Performance
6/11
-
7/26/2019 Weld Summary Performance
7/11
SYS Line No. Iso. Dwg. No. SHT. NO. Joint No. Weld ID STATUS NDE No. Diam/ lg Thk KKS No WPS No. Welder
Stamp
APPROVED
NDE No. Remark
ABS SHELL VERTICAL A0400HTECDD03D V1.6a W1-W10 DONE RT01 2000 26 HTF 04 rev 1 W1A07-052 RT08-
R1
We have changed the NDE
Company
ABS SHELL VERTICAL A0400HTECDD03D V1.6b W1-W10 DONE RT01 2000 26 HTF 04 rev 1 W10 A07-052 RT08-R1 We have changed the NDECompany
ABS SHELL VERTICAL A0400HTECDD03D V1.6c W1-W10 DONE RT01 2000 26 HTF 04 rev 1 W2 N.A We have chang ed the NDE
Company
ABS SHELL VERTICAL A0400HTECDD03D V1.6d W1-W10 DONE RT01 2000 26 HTF 04 rev 1 W1A07-052 RT08-
R1
We have changed the NDE
Company
ABS SHELL VERTICAL A0400HTECDD03D V1.6e W1-W10 DONE RT01 2000 26 HTF 04 rev 1 W10 A07-052 RT08-
R1
We have changed the NDE
Company
ABS SHELL VERTICAL A0400HTECDD03D V 1.1a W3-W2 DONE RT01 2000 26 HTF 04 rev 1 W2 A07-052 RT09-
R1
We have changed the NDE
Company
ABS SHELL VERTICAL A0400HTECDD03D V 1.1e W2 DONE RT01 2000 26 HTF 04 rev 1 W2 A07-052 RT09-
R1
We have changed the NDE
Company
ABS SHELL VERTICAL A0400HTECDD03D V1.6c W10 DONE A07-052RT08R1
2000 26 HTF 04 rev 1 W10 A07-052 RT18-R2
ABS SHELL VERTICAL A0400HTECDD03D N3.6 W1 DONE A07-052
RT24 2000 26 HTF 04 rev 1 W1 A 07-052 RT24
Penalty Joint (PJ)
To be re- shoot
ABS SHELL VERTICAL A0400HTECDD03D N3.7 W1 DONE A07-052
RT24 2000 26 HTF 04 rev 1 W1 A07-052 RT24 Penalty Joint (PJ)
ABS SHELL VERTICAL A0400HTECDD03D N3.8 W10 DONE A07-052
RT24 2000 26 HTF 04 rev 1 W10 A07-052 RT24 Penalty Joint (PJ)
ABS SHELL VERTICAL A0400HTECDD03D N3.9 W10 DONE A07-052
RT24 2000 25 HTF 04 rev 1 N.A
Penalty Joint (PJ)
Need 2 shoot after repair
ABS SHELL VERTICAL A0400HTECDD03D N3.10 W2 DONE A07-052
RT24 2000 25 HTF 04 rev 1 W2 A 07-052 RT24
Penalty Joint (PJ)
To be repair
ABS SHELL VERTICAL A0400HTECDD03D N4.1 W15 TO BE
DONE
A07-052
RT24 2000 25 HTF 04 rev 1 N.A
ABS SHELL VERTICAL A0400HTECDD03D N5.1 W8 TO BE
DONE
A07-052
RT20 2000 23 HTF 04 rev 1 N.A
MONITORING OF REPAIR AND PENALTY JOINTS
ALSTOM POWER MEGALOPOLIS SES Unit III (Greece)
MONITORING REPAIR and PENALTY JOINTS
Prepared by: C.Maderazo
-
7/26/2019 Weld Summary Performance
8/11
abcdPower Italia SpA
Environmental Control System ECS
Company: ELKAT
Week No.: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
Cut-off Date : 18/06 25/06 02/07 09/07 16/07 23/07 30/07 06/08 13/08 20/08 27/08 03/09 10/09 17/09 24/09 01/10 08/10 15/10 22/10 29/10 05/11 12/11 19/11 26/11 03/12 10/12 17/12 24/12 31/12 07/01 14/01 21/01 28/01 04/02 11/02
Vert. Weekly Welded: 5 5 6 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 10 5 5 5 5 5 5 5 5 5 5Vert. Weekly Welded: 2 9 10 10 10 6 2 2 2 5 5 2 2 2 8 8 8 10
Qty. Planned(cumm.): 5 10 16 27 38 49 60 71 82 93 104 115 126 137 148 159 170 181 192 203 214 225 236 247 257 262 267 272 277 282 287 292 297 302 307
Qty. Welded(cumm.): 2 11 21 31 41 47 49 51 53 58 63 65 67 69 77 85 93 103
Total Qty Remain: 305 296 286 276 266 260 258 256 254 249 244 242 240 238 230 222 214 204 204 204 204 204 204 204 204 204 204 204 204 204 204 204 204 204 204
Horiz. Weekly Planned: 18 18 40 40 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 40 40 32 30 30 30 20 20 5
Horiz. Weekly Welded: 10 15 20 20 30 34 35 35 28 35 30 50 55 33 48 50 65
Horiz. Planned(cumm.): 18 36 76 116 166 216 266 316 366 416 466 516 566 616 666 716 766 816 866 916 966 1016 1066 1116 1166 1216 1256 1296 1328 1358 1388 1418 1438 1458 1463
Horiz. Welded(cumm.): 0 10 25 45 65 95 129 164 199 227 262 292 342 397 4 30 478 5 28 593
Total DB Remain: 1463 1453 1438 1418 1398 1368 1334 1299 1264 1236 1201 1171 1121 1066 1033 985 935 870 870 870 870 870 870 870 870 870 870 870 870 870 870 870 870 870 870
Weekly Welding Progress Record - ABSORBER
ABSORBER Weld ing Progress Char t
0
25
50
75
100
125
150
175
200
225
250
275
300
325
350
18/06
25/06
02/07
09/07
16/07
23/07
30/07
06/08
13/08
20/08
27/08
03/09
10/09
17/09
24/09
01/10
08/10
15/10
22/10
29/10
05/11
12/11
19/11
26/11
03/12
10/12
17/12
24/12
31/12
07/01
14/01
21/01
28/01
04/02
11/02
Week
WeldVertical(DB)
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
Week
Horiz.
WeldQty)
Qty.Planned(cumm.):
Qty.Welded(cumm.):
Total Qty Remain:
Horiz.Planned(cumm.):
Horiz.Welded(cumm.):
Total DB Remain:
MEGALOPOLIS SES Unit III - Greece
-
7/26/2019 Weld Summary Performance
9/11
Project: MEGALOPOLIS SES Unit III - GREECE AS OF: 15/10/2007
GTAW
AWS
SMAW
AWS
1 ELKAT W1 Papadimitriou
Theodoros 25.5.2007
TUV-
R06/2007 25,00 111 PF Elkat 04 Rev0 26.5.2007
1 ELKAT W1 Papadimitriou
Theodoros 22.6.2007
TUV-
R12/2007 111 PC Elkat 08 Rev0 23.6.2007
2 ELKAT W2 Mpegiorgis Nikolaos 25.5.2007
TUV-
R07/2007 111 PF Elkat 04 Rev0 SS 26.5.2007
2 ELKAT W2 Mpegiorgis Nikolaos 22.6.2007 TUV-
R13/2007 111 PC Elkat 08 Rev1 SS 23.6.2007
3 ELKAT W3 Christodoulidis
Georgios 25.5.2007
TUV-
R08/2007 111 PF Elkat 04 Rev0 26.5.2007
3 ELKAT W3 Christodoulidis
Georgios 22.6.2007
TUV-
R14/2007 111 PC Elkat 08Rev1 23.6.2007
3 ELKAT W3 Christodoulidis
Georgios 26.6.2007 136 PD Elkat05 Rev1 27,62007
4 ELKAT W5 Mpratsiolias Georgios 13.7.2007
TUV-
R18/2007 111 PD Elkat05-1 Rev0 16.7.2007
4 ELKAT W5 Mpratsiolias Georgios 28.6.2007 136 PD Elkat05Rev1 29.6.2007
4 ELKAT W5 Mpratsiolias Georgios 27.7.2007 111 PD Elkat11 Rev1 29.7.2007
5 ELKAT W8 Kolokotronis Panagiwtis 3.6.2007 TUV-
R27/2007 111 PF Elkat 04 Rev0 SS 4.6.2007
5 ELKAT W8 Kolokotronis Panagiwtis 3.8.2007 TUV-
R27/2007 111 PC Elkat 08 Rev1 SS 5.8.2007
6 ELKAT W10 Thomaides Georgios 11.6.2007 TUV-R22/2007 111 PF Elkat 04 Rev0 14.6.2007 Resign from ELKAT
6 ELKAT W10 Thomaides Georgios 18.6.2007 111 PC Elkat 08 Rev1 18.06.2007
7 ELKAT W13 Kirtsios Nikolas 21.6.2007 136 PC Elkat 07 Rev1 23.6.2007 Resign from ELKAT
7 ELKAT W13 Kirtsios Nikolas 26.6.2007 TUV-
R09/2007 136 PD Elkat 05 Rev1 28.6.2007
8 ELKAT W14 Georgiadis Kostas 25.6.2007 136/11 PC Elkat09 Rev0 27.6.2007 Transferred
1.10.2007
10 ELKAT W14 Georgiadis Kostas 27.6.2007 TUV-R10/2007
136 PD Elkat05 Rev1 28.6.2007 Transferred1.10.2007
10 ELKAT W14 Georgiadis Kostas 13.7.2007 TUV-
R11/2007 111 PC Elkat08 Rev1 16.7.2007
Transferred
1.10.2007
WPSMaterial
(P No.)
No. Welder's NameDate
Tested
Whitnessed
By
Welder's
Stamp
Qualification Variables
Company
Welding Process
Public Power Corporation (PPC)
Date
Qualified
Date
TerminatedRemarks
LIST OF QUALIFIED WELDERS
Dia
Thick
Code
Process
Resign from ELKAT
Resign from ELKAT
Resign from ELKAT
Position
abcdPower Italia Spa
Environment Control Systems
-
7/26/2019 Weld Summary Performance
10/11
Project: MEGALOPOLIS SES Unit III - GREECE AS OF: 15/10/2007
GTAW
AWS
SMAW
AWS
WPSMaterial
(P No.)
No. Welder's NameDate
Tested
Whitnessed
By
Welder's
Stamp
Qualification Variables
Company
Welding Process
Public Power Corporation (PPC)
Date
Qualified
Date
TerminatedRemarks
LIST OF QUALIFIED WELDERS
Dia
Thick
Code
Process
Position
abcdPower Italia Spa
Environment Control Systems
11 ELKAT W15 Davitis Bladimiros 25.6.2007 PPC
TUV 111 PF Elkat 04 Rev0 SS 27.6.2007
11 ELKAT W15 Davitis Bladimiros 13.7.2007 PPC
TUV 111 PC Elkat08 Rev1 SS 16.7.2007
12 ELKAT W16
Parastratidis
Elefterios 16.7.2007
TUV-
R17/2007 136 PC Elkat7 Rev1 SS 17.7.2007
13 ELKAT W17 Paraskevopoulos
Sotiris 5.7.2007
TUV-
R17/2007 136 PC Elkat7 Rev1 SS 17.7.2007
13 ELKAT W20 Antonopoulos Ioannis 16.7.2007 TUV-
R15/2007 111 PD Elkat05-1 Rev0 SS/CS
14 ELKAT W20 Antonopoulos Ioannis 5.10.2007 TUV-
R20/2007 111 PF Elkat04 Rev 1 SS
14 ELKAT W21 Martsaklis Nikolaos 16.7.2007 TUV-
R16/2007 111 PD Elkat05-1 Rev0
Resign from
ELKAT
14 ELKAT W22 Prokopos Euaggelos 18.7.2007
TUV-
R33/2007 136 PC Elkat 07 Rev1 SS
15 ELKAT W23 Metratitan Dritan 31.8.2007 TUV-
R19/2007 111 PD Elkat05-1 Rev0 SS/CS
15 ELKAT W24 Mpregianos Dimitris 18.7.2007 TUV-
R32/2007 136 PC Elkat 07 Rev1 SS
16 ELKAT W25 Gritzepis Georgios 10.8.2007 TUV-
R23/2007 111 PF Elkat 11 Rev1 CS
16 ELKAT W25 Gritzepis Georgios 24.8.2007 TUV-
R23/2007 136 PC Elkat07 Rev1 SS
17 ELKAT W26 Basiliadis Antonis 10.8.2007 TUV-
R24/2007 111 PF Elkat 04 Rev1 SS
18 ELKAT W26 Basiliadis Antonis 10.8.2007 PPC
TUV 111 PD Elkat 05-1 Rev0 SS/CS
19 ELKAT W26 Basiliadis Antonis 31.8.2007 PPC
TUV 111 PC Elkat 08 Rev1 SS
20 ELKAT W28 Sarbu Constantin 20.9.2007 TUV-
R28/2007 111 PF Elkat11 Rev0-1 CS
21 ELKAT W28 Sarbu Constantin 20.9.2007 TUV-
R29/2007 111 PD Elkat 5-1 Rev0 C276/C276
22 ELKAT W29 Zamfira Victor 20.9.2007 PPCTUV
111 PF Elkat 11 Rev0-1 CS
23 ELKAT W29 Zamfira Victor 20.9.2007 PPC
TUV 111 PD Elkat 5-1 Rev0 C276/C276
-
7/26/2019 Weld Summary Performance
11/11
Project: MEGALOPOLIS SES Unit III - GREECE AS OF: 15/10/2007
GTAW
AWS
SMAW
AWS
WPSMaterial
(P No.)
No. Welder's NameDate
Tested
Whitnessed
By
Welder's
Stamp
Qualification Variables
Company
Welding Process
Public Power Corporation (PPC)
Date
Qualified
Date
TerminatedRemarks
LIST OF QUALIFIED WELDERS
Dia
Thick
Code
Process
Position
abcdPower Italia Spa
Environment Control Systems
24 ELKAT W29 Zamfira Victor 5.10.2007 PPC
TUV 111 PF Elkat04 Rev1 SS
25 ELKATW30 Viorel Ionet
20.9.2007 PPC
TUV 111 PD Elkat5-1Rev0 C276/C276
26 ELKAT W30 Viorel Ionet 20.9.2007
PPC
TUV 111 PC Elkat8 Rev1 SS
27 ELKATW31 Constantin Burneci 20.9.2007
PPC
TUV 111 PD Elkat 5-1 Rev0 C276/C276
28 ELKATW32 I lie Salceanu 20.9.2007
PPC
TUV 111 PD Elkat5-1Rev0 C276/C276
29 ELKATW32 I lie Salceanu 20.9.2007
PPC
TUV 111 PC Elakt 8 Rev1 SS
30 ELKATW33 Nikas Antonios 24.9.2007
PPC
TUV 136 PC Elkat7 Rev1 SS
31 ELKAT W33 Nikas Antonios 24.9.2007
PPC
TUV 111 PC Elkat 8 Rev2 SS
32 ELKATW34 Lambropoulos Christo24.9.2007
PPC
TUV 111 PC Elkat 8 Rev2 SS
33 ELKATW34 Lambropoulos Christo27.9.2007
PPC
TUV 111 PF Elkat 11 Rev0-1 CS
34 ELKATW35 Patlakis Ioannis 27.9.2007
PPC
TUV 111 PF Elkat 11 Rev0-1 CS