we apologize for the road construction!

Post on 22-Feb-2016

59 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

We Apologize for the Road Construction!. It Really will Make Things Better When it’s Finished!. Until Then – Just use t his Easy Way to Reach Us!. Turn West on Carmel Drive Stop Light Intersection - Hamilton Crossing Shopping Center is on South-east corner. Go through Roundabout - PowerPoint PPT Presentation

TRANSCRIPT

We Apologize for the Road Construction!

It Really will Make Things Better When it’s Finished!

Until Then – Just use this Easy Way to Reach Us!

Turn West on Carmel Drive

Stop Light Intersection -Hamilton Crossing Shopping Center is on South-east corner

Go through Roundabout

Carmel Drive turns into Illinois Street

Just stay on Illinois Street

At 136th Street Roundabout Turn Right onto 136th Street

Beeson Cosmetic Surgery is 100 Yards on Your Right!

Some Detours can be Confusing!

But This Detour is Easy!

And if you have any problems – just call us at 317-846-0846 and we’ll guide you through!

THANK YOU !

top related