DESCRIPTION

Warm Springs Extension Alignment. South Ventilation Structure. South Subway Portal. Tie-in Point for SVBX Project. North Ventilation Structure. North Subway Portal . Paseo Padre Pkwy. Mission Blvd. Auto Mall Pkwy . S. Grimmer Blvd. Washington Blvd. Stevenson Blvd. Walnut Ave. - PowerPoint PPT Presentation

TRANSCRIPT

Warm Springs Extension Alignment

1

Fremont Central Park Subway

Line, Track, Station and Systems

BART Overpass (City of Fremont Grade Separation Project)

Fremont Station

Warm Springs/South Fremont StationFremont Central Park

South Subway Portal

North Subway

Portal

North Ventilation Structure

Lake Elizabeth

South Ventilation Structure

Irvington Station (Future)

Walnut Ave.

Washington Blvd.

Auto Mall Pkwy.

S. Grimm

er Blvd.

Mission Blvd.

BART Overpass

Paseo Padre Pkwy.

Stevenson Blvd.

1

Tie-in Point for SVBX Project

1

Subway Work Progress

2

LTSS Work Progress

3

WSX Project Schedule

Subway ContractProject Completion Spring 2013

LTSS ContractRevenue Service Fall 2015

4

Project Location

5

HMC and Hayward Shop ModificationsSite Plan

Hayward Shop Vehicle-level Overhaul

Shop

Component Repair Shop

Central Warehouse

Non-Revenue Vehicle

and M&E (Maintenance

& Engineering) Shop and

Storage Yard

Hayward Maintenance Complex (HMC)

123

New Track

Access

6

Contract 1 Site Plan

Component Repair Shop

Hayward Shop Modifications

BART Mainline

7

Tie-ins and crossover

Contract 2 Site Plan