South 5th Street Reconstruction Public Meeting August 24, 2015

Walker’s Point

creative corridor

Project Area: South 5th Street Virginia to Scott

PIERCE

VIRGINIA

WALKER

NATIONAL

SCOTT

MINERAL

BRUCE

WASHINGTON

Project Timeline

•2014 - 2015: Scheduled 5th St. repaving delayed pending Walker’s Point Action Plan completion and community determination on street design.

•Spring 2015: Walker’s Point Action Plan completed

•June 2015: Presented paving options to community

•July 2015: Gathered community input

•August 2015: Select street design option

Project Timeline

•September 2015: Tax Incremental District project plan presented to Common Council.

•Fall – Winter 2015: DPW design and engineering, including working with businesses to address concerns (parking, access, etc.)

•Spring - Summer 2016 – Begin street reconstruction (3 – 4 month construction period)

GRAEF Parking Study (2014)

• Emphasize shared parking • Neighborhood valet • Reduce free or low-cost

on-street parking • Eliminate assigned, off-

street spaces

• Incentivize alternative transportation modes

Opportunities for Temporary Parking

1

3 2

1

3 4 S

5TH

ST

W NATIONAL AV

5

Existing Conditions South 5th Street

9.5’ SIDE-WALKS

17’ ANGLED PARKING

11’ DRIVING

LANE

11’ DRIVING

LANE

9.5’ SIDE-WALKS

17’ ANGLED PARKING

OPTION 1 Small Sidewalks and Angle Parking on Both Sides

13.5’ SIDEWALKS

8’ PARALLEL PARKING

11’ DRIVING

LANE

11’ DRIVING

LANE

13.5’ SIDEWALKS

17’ ANGLED PARKING

OPTION 2 One Side Angle Parking / One Side Parallel Parking

13.5’ SIDEWALKS

8’ PARALLEL PARKING

11’ DRIVING

LANE

5’ BIKE LA

NE

13.5’ SIDEWALKS

OPTION 3 Parallel Parking on Both Sides and BIKE LANES

8’ PARALLEL PARKING

11’ DRIVING

LANE

5’ BIKE LA

NE

18.5’ SIDEWALKS

8’ PARALLEL PARKING

11’ SHARED

LANE

11’ SHARED

LANE

18.5’ SIDEWALKS

8’ PARALLEL PARKING

OPTION 4 Narrow Street and Wide Sidewalks

Public Input

•Businesses •Property owners

•Residents of the area •Other interested parties

S. 5th Street business and property owners:

Option One or No Change 18% (7) Option Two 10% (4) Option Three 10% (4) Option Four 62% (24)

Walkers Point Association and near residents:

Option One or No Change 0% (0) Option Two 0% (0) Option Three 47% (8) Option Four 53% (9)

Other interested parties:

Option One or No Change 0% (0) Option Two 0% (0) Option Three 43% (3) Option Four 57% (4)

18.5’ SIDEWALKS

8’ PARALLEL PARKING

11’ SHARED

LANE

11’ SHARED

LANE

18.5’ SIDEWALKS

8’ PARALLEL PARKING

OPTION 4 Narrow Street and Wide Sidewalks

Business Support Program • Provides support for business before

and during construction • Maintains regular communication

during construction • Minimizes impact of construction on

business • Works with businesses to provide

parking, access and signage • Removes unnecessary parking

restrictions

Questions / Comments

Tonight’s presentation will be available on line at: http://city.milwaukee.gov/AreaPlans/NearSouth

Questions or Comments: Department of City Development NearSouthSidePlan@Milwaukee.gov (414) 286-5724 Alderman Jose Perez Jose.Perez@Milwaukee.gov (414) 286-2221

top related