1 May 2023 Wärtsilä Mobile LNG© Wärtsilä

The Need

What are our customers’current options for LNG storage

and regasification?

© Wärtsilä 1 May 2023 Wärtsilä Mobile LNG

Option 1: On-shore terminal + marine infrastructure

© Wärtsilä 1 May 2023 Wärtsilä Mobile LNG

Option 2: FSRU + marine infrastructure

© Wärtsilä 1 May 2023 Wärtsilä Mobile LNG

Efficient use of smaller amounts of LNG than currently possible or economically feasible

Have the flexibilityto move & adapt according to market needs

Overcome infrastructure limitations on land and at sea e.g. shallow water,

limited construction support at site, etc.

The Drivers Behind Option 3…

© Wärtsilä 1 May 2023 Wärtsilä Mobile LNG

Option 3: Wärtsilä Mobile LNG solutionLNG Barge + minimal marine infrastructure

© Wärtsilä 1 May 2023 Wärtsilä Mobile LNG

Comparing the 3 options for bringing LNG on-shore

FEATURE ON-SHORE OFF-SHORE NEAR-SHOREAsset flexibility No Yes YesWeather sensitivity No Yes YesCAPEX High Medium LowOPEX Low High LowSmall size Yes No YesOn-shore permits Yes No NoDelivery Time 1 – 4 years 2 – 3 years 1 – 2 years

Terminal FSRU Wärtsilä Mobile LNG

© Wärtsilä 1 May 2023 Wärtsilä Mobile LNG

The Wärtsilä Mobile LNG solution

Clearly the ideal solution for:• Handling smaller amounts of LNG efficiently• Limited infrastructure and construction support at site• Shallow waters• Flexible and expandable LNG needs

1 May 2023 Wärtsilä Mobile LNG© Wärtsilä

Wärtsilä’s LNG Barge Portfolio: Applications

© Wärtsilä 1 May 2023 Wärtsilä Mobile LNG

Unloading from a small-scale LNG carrier to LNG Barge

© Wärtsilä 1 May 2023 Wärtsilä Mobile LNG

Wärtsilä Mobile LNG:LNG Barge 7500m3 + 50 MW Power Barge

1 May 2023 Wärtsilä Mobile LNG© Wärtsilä

Related Wärtsilä References

© Wärtsilä 1 May 2023 Wärtsilä Mobile LNG

Wärtsilä Power Barges

BENEFITS OF WÄRTSILÄ POWER BARGES 18 barges delivered with total output over 1,800 MWMobility, short construction time, robust design and reliable technology, flexible fuel choice, optimal matching at different loads, compliance with the strictest environmental standards, comprehensive maintenance and operational services

Estrella del Mar Sultana del Este

SeaboardLihir Gold

© Wärtsilä 1 May 2023 Wärtsilä Mobile LNG

Tornio Manga LNG terminal and PGN Lampung FSRU

Customer: Manga LNG OY, Tornio, FinlandScope of supply: • Turnkey delivery of import terminal• Site infrastructure, jetty, onshore structures • Complete process system including unloading, storage

and regasification equipment for LNG• Truck loading stations

Customer: Hyundai Heavy Industries, South Korea (for FSRU owned by Höegh LNG)

Scope of supply:• Regasification module • Wärtsilä 50DF Engines

© Wärtsilä 1 May 2023 Wärtsilä Mobile LNG

Höegh LNG FSRUs and Petronas Gas Bhd Jetty Regas

Customer: Hyundai Heavy Industries, South Korea (for FSRUs owned by Höegh LNG & Gazprom)

Scope of supply:Seawater/propane based regasification module and seawater filter/steam heating module

Customer: Petronas Gas Bhd, Malaysia

Scope of supply:LNG regasification plant for an LNG import facility.