PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
Pre-Feasibility Report of
Pazhavoor Part-1 Earth Quarry (Under the Guidelines of Ministry of Environment and Forest
in terms of the provisions of EIA notification 20051, 52 & 127 and specifically in circular
No J-11013/41/20051, 52 & 127 -IA.II (I) dated 30th
December, 2010)
S.F.No. 1004/2 (P)
Pazhavoor Part-1 Village,
Radhapuram Taluk, Tirunelveli District,
Extent: 1.47.25Ha (less than 5Ha)
Category: B2 Project
Applicant
J.Rajkumar,
S/o. Jeyakumar,
7-2-7, Peruratchi office street,
Pudupatti,
Theni District - 625556
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
1. EXECUTIVE SUMMERY
Mr. J.Rajkumar has been obtained permission from District collector Tirunelveli to quarry
Earth for over an extent of 1.47.25Ha in Survey No: 1004/2 (P) at Pazhavoor Part-1 Village,
Radhapuram Taluk and Tirunelveli District, Tamilnadu state by District Collector Tirunelveli,
Rc. No. M2/27088/2016 Dated: 06.09.2016, for a period of Three years only subjected to
submission of Environmental clearance from MoEF / SEIAA, consent for Establishment and
Consent for operation from TNPCB.
SALIENT FEATURES OF THE PROJECT
S.NO PARTICULAR DETAILS
1. Name of the Proponent J.Rajkumar
2. Type of Project Earth quarry
3. Location Survey No.1004/2 (P)
Pazhavoor Part-1 Village,
Radhapuram Taluk,
Tirunelveli District,
Tamilnadu State.
4. Mining lease area 1.47.25Ha
5. Type of land
Patta/forest/PWD
Patta Land – Non forest
6. Life of period Three years only
7. Production capacity The proposed quantity of reserves is 29505m3
(or)
5213 Lorry Loads of Earth up to a depth 3m below
the ground level for a period of Three years only.
Description Earth in m3
Geological Resources 44994
Available Mineable reserves 29505
Three years plan period
As in the approved mining plan
29505
8. Method of Mining Open cast method of shallow mining is proposed,
Machineries like excavators are proposed for
quarrying Earth 3m below the ground level.
No drilling or blasting is proposed for this type of
Earth Quarrying, it is a conventional eco friendly
quarrying operation.
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
9. Ultimate depth of Mining The quarry operation is Proposed up to depth 3m
below the ground level during this period.
10. Latitude 08°12’28.88’’N to 08°12’23.78’’N
11. Longitude 77°33’55.62’’E to 77°33’49.79’’E
12. Top sheet No. 58- H/12
13. Topography of MSL area 64m from MSL
14. Land use classification It is a fresh quarry lease
15. Ground water level The Ground water is about 30mt depth from below
ground level.
16. Climatic condition Rainfall 800mm– 900mm/annum
Temperature - 42ºC – 30ºC
17. Land use pattern Roads – 10%
Agricultural land – 35%
Trees – 25%
Odai/Stream – 10%
Barren land – 10%
Habitation – 10%
18. Nearest habitation Palavoor – 1km – E
19. Nearest Town Radhapuram - 15km - NE
20. Nearest Railway station Panagudi Railway station - 12km – N
21. Nearest Airport Thoothukudi Airport - 76km- NE
22. Nearest National Highways &
State Highways
NH 7 - Salem – Kanniyakumari – 750m –E
SH 46 – Nagercoil - Aralvaimozhi – 7km –NW
23. Nearest Hospital Palavoor – 1km – Eastern side
24. Aerial distance to the nearest
Eco sensitive areas, CRZ,
forest, wild life sanctuary,
Interstate boundary, critically
polluted area if the quarry site
is within 500m of these areas.
More than 500m from Eco sensitive areas, CRZ,
forest, wild life sanctuary, Interstate boundary,
critically polluted area.
25. Details of other quarries for a
radius of 500m around the
quarry site
There is no quarry within the radius of 500mt
26. Man power About 7 employees
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
27. Water requirement & source Total water requirement for 1.0KLD from water
vendors & nearby bore well.
28. Overburden/Waste There is no overburden anticipated in this area
29. Cost of the project The Project cost:
A. Fixed asset cost = Rs. 4,44,500/-
B. Operational cost = Rs. 7,38,000/-
C. EMP cost = Rs. 1,30,000/-
CSR Cost = Rs. 50,000/-
Total cost = Rs.13,62,500/-
The Prefeasibility report preparing for following condition of Government of India Ministry of
Environment and Forests (No.L-11011/47/2011 –IA-II (M) Dated: 24th June, 2013)
� Therkumalai Reserve forest is located on the west side of the area.
� Odai is located North and Eastern side of the area.
� Canal is situated 1km away from the South eastern side.
� The Western Ghats is situated 3km away from the Western side.
� There is no CRZ within the radius of 15km.
� The project area does not fall in ‘HACA’ region.
� There is no interstate boundary within the radius of 15km.
� There are no Bird sanctuaries, wild life sanctuaries and National park as Act 1972, within the
radius of 15kms.
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
The following information provided by the applicant
I have applied for getting Environmental clearance to SEIAA, Tamilnadu for quarry lease for
quarrying of Earth quarry in the S.F.No:1004/2 (P) over an extent of 1.47.25Ha, Patta land in
Pazhavoor Part-1 Village, Radhapuram Taluk and Tirunelveli District.
I will not deploy any child labors below 18 years for any type of quarrying operation. All labours
engaged for quarrying operation will be insured till the end of life of quarry period.
All type of safety / protective equipment’s will be provided to all the labourers working in my quarry
site.
I will sincerely follow and execute the Afforestation and Green belt as proposed during the course of
quarrying operation and maintain Afforestation after the expiry of quarrying lease.
I ensure to involve and participate in the corporate social responsibilities of the local community as
declared in the proposal.
I solemnly declare & affirm that there are no operating quarry within 500m radius from the periphery
of the quarry.
Besides I wish to state that the approach road belongs to me only and no other patta roads are
encountered.
There is no Habitation within the radius of 300meters radius from the periphery of my quarry.
No permanent structures, temples etc. are located within 500m radius from the periphery of my
quarry.
The quarrying operation will not cause any hindrance to the nearby public and also it will not cause
any hindrance to nearby villagers and human settlements during transportation of mineral.
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
2.0 INTRODUCTION OF THE PROJECT OR BACKGROUND INFORMATION
(i) Identification of project and project proponent: In case of mining project, a copy of mining
lease/letter of intent should be given
Identification of Project
Project Proponent Name with Address
J.Rajkumar,
S/o. Jeyakumar,
7-2-7, Peruratchi office street,
Pudupatti,
Theni District - 625556
Mobile No. 77084 11558
Email: infogeoexploration@gmail.com
In case of mining project, a copy of mining lease/letter of intent should be given
I. The Precise area communication letter was issued by the District collector Tirunelveli vide
Rc.No.M2/27088/2016 Dated: 06.09.2016.
II. The Mining plan was approved by the Assistant Director, Department of Geology and Mining
Tirunelveli vide Rc. No. M2/27088/2016 Dated: 14.09.2016.
Name of the Project Pazhavoor Part-1 Earth quarry
Lease area 1.47.25Ha Patta Land-Non forest
Location Survey No.1004/2 (P)
Pazhavoor Part-1 Village, Radhapuram Taluk,
Tirunelveli District and Tamilnadu State.
Topo sheet No. 58- H/12
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
(ii) Brief description of nature of the project
The lease area is exhibits almost plain topography. The Earth quarrying by opencast method
of shallow mining is proposed. Machineries like excavator are proposed for quarrying of Earth. No
drilling and blasting is proposed. There is no formation of bench; the quarrying is a restricted to a
depth of 3m in the entire area.
The applicant intends to use for leveling and filling of low lying areas for public and private
sector projects in and around the district.
There is no top soil. The waste material is not anticipated during the quarry operation, the
entire Earth is excavated and utilized. There is no top soil. It is proposed to exploit Earth of about
29505m3
for a period of Three years only.
(iii) Need for the project and its importance to the country and or region
The Earth quarrying project falls in the area of Tirunelveli District, Tamilnadu where scanty
agricultural activities are been carried out and the new industries are springing up in the district.
Earth is an important commercial product, with a number of applications. The applicant intends to
use for leveling and filling of low lying areas for public and private sector projects.
This project will give employment opportunities to 7 members directly. Mineral Industries of
the state of Tamilnadu provides employment opportunities for the people of the state as well as in the
specific project area. Mining and Quarrying is one among the major core sector industries which
plays a vital process of country’s economic development.
(iv) Demand and supply gap
There is a huge demand of Earth in Tirunelveli District for this a huge quantity of Earth is
required for filling and leveling of low lying areas of road construction projects and other
infrastructure development work. Besides there is also huge demand of Earth for public and private
sector projects also.
(v) Imports vs indigenous production
There is no import of Earth at present in India. India especially the peninsular India (southern
India) has good resource of Earth.
(vi)Export Possibility
There is no possibility for export of this Earth.
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
(vii) Domestic/Export Markets
The Earth is specifically used for leveling and filling of low lying areas for public and private
sector projects.
(viii) Employment Generation (Direct and Indirect) due to the project
About 7 employees labors directly and engaged in this proposed quarry project and the
tentative man power required for the proposed Earth quarry shall be as follows.
Designation No’s
Skilled
Mines foreman 1
Supervisor 1
Semi skilled
Excavators Operators 1
Co opeerator 1
Un-Skilled
Watchman 1
Unskilled helper 2
Total 7
The above man power is adequate to meet out the production schedule and the machinery
strength envisaged in the mining plan and also to comply with the stationary provisions of mine
safety regulation.
It is been ensured that the labors will not be deployed less than 18 years, No Child labors
will engaged or entertained for any kind of quarrying operations. All the labors engaged for
quarrying operations will be insured till the end of life of quarry.
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
3.0 PROJECT DESCRIPTION
(i) Type of project including interlinked and interdependent projects, if any
The Pazhavoor Part-1 Earth quarry, it is an opencast method of shallow mining is proposed.
There is no interlinked & Interdependent Project.
(ii) Location (map showing general location, specific location, and project boundary & project
site layout) with coordinates
� The area is located in S.F.No. 1004/2 (P), Pazhavoor Part-1 Village, Radhapuram
Taluk and Tirunelveli District.
� It’s a Patta Land; the lease applied area is Plain topography.
� The altitude of the area is 64m (Maximum) from MSL
� The area is falls in GSI Topo sheet No. 58- H/12
� The Latitude between of 08°12’28.88’’N to 08°12’23.78’’N
� The Longitude between of 77°33’55.62’’E to 77°33’49.79’’E on WGS 1984 datum.
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
LOCATION MAP OF THE PROJECT AREA WITH CO ORDINATES
LEASE AREA:
Village : Pazhavoor Part -1
Taluk : Radhapuram
District : Tirunelveli
Latitude : 08°12’28.88’’N to 08°12’23.78’’N
Longitude : 77°33’55.62’’E to 77°33’49.79’’E
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
DRAWING SHOW THE SURFACE PLAN WITH CO ORDINATES & 1KM RADIUS PLAN
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
(iii) Details of alternate sites considered and the basis of selecting the proposed site,
particularly the environmental considerations gone into should be highlighted
The quarrying operation is proposed in the Patta Land and there is no any alternative site for
this project is not considered, the project is site specific.
(iv) Size or magnitude of operation
The total area of the project is about 1.47.25Ha. It is proposed to exploit Earth about
29505m3 by open cast method of shallow mining is proposed for quarry by deploying excavate
directly for a period of Three years only.
(v) Project description with process details (a schematic diagram/flow chart showing the
project layout, components of the project etc. should be given)
General Geology
The area is plain topography, Earth is composed of consolidated of silica and fine feldspar, the
Earth is formed by weathering and transportation of rock particles.
The applicant intends to use this Earth especially for leveling and filling of low lying areas for
public and private sector projects in and around the district.
OPEN CAST WORKING
Open cast method of shallow mining is proposed, Machineries like excavators are proposed
for quarrying Earth 3m depth. No drilling or blasting is proposed for this type of Earth quarrying, it is
a conventional eco friendly quarrying operation.
The Earth will be loaded directly to the trucks / Lorries for transportation to the needy
customers.
Details of Exploration
No exploration is carried out. The Earth is found clearly right from the surface in the lease
applied area.
Proposed Study to be carried out
As the quarrying operation is proposed to be carried out for a period of Three years only to a
depth of 3m further exploration or proposed study is redundant.
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
Method of Estimation of Reserves
The Geological plans demarcating the commercially viable Earth body has been prepared in
1: 1000 scales (Plate No: III). Totally three sections have been drawn, one section along the Length
wise as (X-Y) another two section drawn the width wise as (A-B), (C-D), to chosen the maximum
area cover under the lease in the Horizontal 1:1000 & vertical 1: 100 (Plate No: III).
The cross sectional area for the proved depth persistence of 3m has been worked out for the
section. The cross sectional area multiplied by its length of influence of the longer axis gives the
volume (insitu) in the cross sectional area. The sum total of the insitu reserves available within the
individual cross sectional area gives the geological reserves of the lease applied are.
As the mineable of Earth in the terms of cubic meter. The Geological resource, Mineable reserves are
given only in terms of cubic meter. The Details of estimation of Geological resource and mineable
reserves with reference to topography, Geological plan and section shown in (Plate No: III).
Mineable reserves
Total Recoverable Reserves of Earth up to 3m depth = 29505 m3
Total Mineable reserves proposed to excavate 29505m3 for a period of Three years only.
Section Bench L (m)
W (m) D (m)
(Avg)
Volume
( Cbm)
Earth in
m3
XY-AB I 70 80 1 5520 5600
II 68 77 1 5236 5236
III 66 74 1 4884 4884
Total 15720
XY-CD I 97 51 1 4947 4947
II 96 48 1 4608 4608
III 94 45 1 4230 4230
Total 13785
GRAND TOTAL 29505
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
Process details:
Overburden:
No overburden in the area, Earth Clearly visible right from the surface.
(vi) Raw material required along with estimated quantity, likely source, marketing area of final
products, Mode of transport of raw Material and Finished Products
This is a quarrying project for excavating Earth hence there is no requirement for raw
material.
Uses:
The Excavated Earth especially for leveling and filling of low lying areas for public and
private sector projects in and around the district.
(vii) Resource optimization/recycling and reuse envisaged in the project, if any, should be
briefly outlined
No optimization/ Recycling and Reuse envisaged in the proposed Earth quarry project.
(viii) Availability of water its source, Energy/power requirement and source should be given
This Earth quarry project does not require huge water for the project. The total water
requirement in the quarry will be around 1KLD.
Purpose Quantity Sources
Drinking &
Domestic
purpose
0.3 KLD Water Purchase from Approved water
vendors
Dust
suppression
0.3 KLD From Existing Borehole on nearby the
quarry area.
Green belt 0.4 KLD From Existing Borehole on nearby the
quarry area.
Total 1.0KLD
Excavating the Earth by excavators
Loading the Earth into tippers by excavator
to the needy Road construction sites
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
Energy
No electricity is required for quarry operation; the quarry working is restricted on day time
only (between 9Am to 5Pm).
Diesel (HSD) will be used for quarrying machineries around 4920 liters of HSD will be used for the
entire projects. Diesel will be brought from nearby diesel pumps.
No power is required for the project. Lightings on the Night will be taken from nearby electric poles
after obtaining permission from concerned authorities.
Per hour Excavator will consume = 10 liters / hour
Per hour Excavator will excavate = 60m3
Per 29505m3 = 29505m
3/60m
3
= 492 hours
Diesel consume 492 working hours = 492 hours x 10 liters
= 4920 liters of HSD for entire project life
(ix) Quantity of wastes to be generated (liquid and solid) and scheme for their
management/disposal
There is no wastage is encountered during the quarrying operation the entire Earth is utilized
for public and private sector projects for filling and leveling the low lying areas.
There is no toxic effluent expected to generate in the form of solid liquid and gases and the no
requirement of treatment of waste. There is no top soil available in the lease applied area.
(x) Schematic representations of the feasibility drawing which give information of EIA purpose
To Submit SEIAA
Final Presentation
FORM-I
ALONG WITH PREFEASIBILITY REPORT
& APPROVED MINING PLAN
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
4.0 SITE ANALYSIS
(i) Connectivity
Mode Description
Road
connectivity
1. There is a metal road on the East side of the area, this road
connecting in the Palavoor village at a distance of 1km.
2. The Nearest National Highway (NH-7) Salem -
Kanniyakumari – 750m –Eastern side of the area.
3. The Nearest SH 46 – Nagarcoil – Aralvaimozhi – 7km –
Northwest side of the area.
Railway station
& Railway line
1. The Nearest Railway station is Panagudi – 12km –Northern
side.
2. The Nearest Railway line is Tirunelveli – Nagarcoil – 6km
–Northwestern side of the area.
Air port 1. The Nearest Airport is Thoothukudi – 76km- North eastern
side.
(ii) Land Form, Land use and Land ownership
The quarry lease applied area is 1.47.25Ha. The area falls in GSI top sheet No: 58- H/12. It is
a Patta Land, the applicant has obtained consent from the pattadhar. (Refer Annexure No.VI).
(iii) Topography (along with map)
The lease applied area exhibits almost plain topography, the area is fully covered by the Earth
formation, the nature of the earth deposit is residual deposit. The Earth was formed by the erosion and
transportation of rock particles from the hillock located on the western side. The altitude of the area is
64m (Maximum) from MSL.
Topographical view of the Pazhavoor Part-1 Earth quarry lease applied area
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
GOOGLE IMAGE SHOWING THE LEASE BOUNDARY AREA
For Pazhavoor Part-1 Earth Quarry
Lease Area:
Village: Pazhavoor Part-1
Taluk: Radhapuram
District: Tirunelveli
Topo sheet No: 58- H/12
Latitude : 08°12’28.88’’N to 08°12’23.78’’N
Longitude: 77°33’55.62’’E to 77°33’49.79’’E
Lease area
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
(iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area
under CRZ)), shortest distances from the periphery of the project to periphery of the forests,
national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of
the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be
given.
• Therkumalai Reserve forest is located on the west side of the area.
• Odai is located North and Eastern side of the area.
• Canal is situated 1km away from the South eastern side.
• The Western Ghats is situated 3km away from the Western side.
• There is no CRZ within the radius of 15km.
• The project area does not fall in ‘HACA’ region.
• There is no interstate boundary within the radius of 15km.
• There are no Bird sanctuaries, wild life sanctuaries and National park as Act 1972, within the
radius of 15kms.
• There is no quarry within the radius of 500m
(v) Existing Infrastructure
There is no existing infrastructure in the proposed quarry lease applied area.
(vi) Soil Classification
The area is mostly covered with Earth formation.
(vii) Climatic data form secondary sources
Both the North East and South West monsoon occurs here and the summer are hot and winter
is cool. During April and May the temperature may shoot up to 42°C and during winter the
temperature does not fall below 30°C. The average annual rainfall is around 800-900mm.
(viii) Social infrastructure available
There is no social infrastructures like Government Buildings, worship in the 1Km vicinity of
the quarry lease applied area.
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
5.0 PLANNING BRIEF
(i) Planning Concept (type of industries, facilities, transportation etc.) Town and Country
Planning/Development authority Classification.
The total area of the Project is about 1.47.25Ha. The Proposed production of Earth is about
29505m3
for a period of Three years only up to a depth of 3m from the existing profile. This
quarrying project is to excavate Earth by conventional Open cast method of shallow mining is
proposed. Hydraulic excavator is proposed for quarrying Earth. Transportation of Earth shall be done
by tippers on roads.
The Project land is devoid of Vegetation and lies in the backward town of Tirunelveli District.
There are no specific industries or factories in and around the project areas.
Transportation
Hired Tippers of 10/20Ts capacity will be utilized for Transportation of Earth from the quarry
to needy sites by Tarpaulin cover to prevent spillage. During the transportation the material along the
village roads and populated areas the vehicle should not exceed the 20Km speed limit.
Population project
There are few villages located in 5km radius from the lease applied area the details are given
below.
S.
No Name of the Village
Approximate distance
& Direction from lease
applied area
Approximate
population
1. Avaraikulam 4.0km - NE 550
2. Aralvaimozhi 6km - NW 600
3. Palavoor 1km - E 750
(iii) Land use planning (breakup along with green belt etc.,)
The Earth quarrying operation is proposed for a period of Three years only up to depth of
3m from the existing profile. The project area extent is 1.47.25Ha. The entire area is proposed to be
quarried.
Description Present
Area (Ha)
Area at the end of this
quarrying period (Ha)
Area under quarrying Nil 1.04.70
Road Nil 0.01.00
Green Belt Nil 0.05.00
Un utilized area 1.47.25 0.36.55
Grand Total 1.47.25 1.47.25
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
(iv) Assessment of Infrastructure Demand (Physical & Social)
The existing road facilities are already available which shall be used and maintained. Medical
facilities is available for the project sites, Government and private hospitals and other basic
infrastructure facilities like communication center, school supermarket, bus stand are also available
in Radhapuram which is at a distance of 15km on North eastern side of the area. This quarry project
will provide employment for about 7 persons directly.
(v) Amenities/Facilities
The simple methods adopted and the limited scale of activities involved in Earth quarrying
does not require High Tension Electric Power supply or huge worship facilities. The quarrying work
is restricted to one general shift during day time only. Major Machinery repair works are attended at
Tirunelveli. Packaged drinking water will be brought from approved water vendors. All the facilities
are available in Tirunelveli district which is at a distance about 59km on the North eastern side of the
area.
6.0PROPOSED INFRASTRUCTURE
(i) Industrial Area (Processing area)
There is no processing area proposed within the lease applied area.
(ii) Residential area (Non processing area)
There is no residential area within 300mts of the lease applied area.
(iii) Green Belt
After the completion of the quarrying operation, the quarried out land will be leveled and
used for agriculture purpose. The applicant ensures to carry out Afforestation by plant native species
like pungam, neem, causirina or nearby villages and along the village roads after consultation with
Panchyat Authorities. The budget for Afforestation will be around Rs. 15,000/-
(iv) Social infrastructure
This proposed Earth quarry will fetch employment for about 7 people directly and 5 persons
indirectly.
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
(v) Connectivity (traffic and transportation road/ Rail/ Metro/ Water ways etc.)
Mode Description
Road
connectivity
1. There is a metal road on the East side of the area, this road
connecting in the Palavoor village at a distance of 1km.
2. The Nearest National Highway (NH-7) Salem -
Kanniyakumari – 750m –Eastern side of the area.
3. The Nearest SH 46 – Nagarcoil – Aralvaimozhi – 7km –
Northwest side of the area.
Railway station
& Railway line
1. The Nearest Railway station is Panagudi – 12km –
Northern side.
2. The Nearest Railway line is Tirunelveli – Nagarcoil – 6km
–Northwestern side of the area.
Air port 1. The Nearest Airport is Thoothukudi – 76km- North
eastern side.
(vi) Drinking Water management (Source& Supply of water)
This proposed Earth quarry project does not require huge water either for beneficiation or
processing. Drinking water for this will be brought from approved water vendors in Palavoor which
is about 1Km on the Eastern side of the area.
(vii) Sewerage System
Toilets will be constructed on semi-permanent structure and sewage will be discharged once
in three months. The sewage waste will be collected in soak pit and discharged as manure.
(viii) Industrial Waste Management
No industrial waste will be generated from the project.
(ix) Solid Waste Management
The Earth quarrying does not produce any waste. The entire Earth is excavated and utilized.
This waste may not produce any toxic effluent in the form of solid liquid or gas.
(x) Power Requirement & Supply / source
The proposed Earth quarrying does not required any power supply the quarrying operation
which is proposed to operate in day time only for 7 Am to 5Pm with 1 Hour lunch interval between
1Pm to 2Pm.
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
7.0REHABILITATION AND RESETTLEMENT (R & R PLAN)
(i) Policy to be adopted (Central/State) in respect of the project affected persons including
home oustees, land oustees and landless laborers (a brief outline to be given)
The project area lies in Patta Land, Pazhavoor Part-1 Village, Radhapuram Taluk, Tirunelveli
district. There is no residential area within the radius of 300m; hence there is no rehabilitation and
resettlement involved in this Earth quarrying project.
8.0 PROJECT SCHEDULE & COST ESTIMATES
(i) Likely date of start of construction and likely date of completion (Time schedule for the
project to be given)
The Earth quarrying project is likely to get commenced after the execution of quarrying lease.
The total quantity of reserves is 29505m3 of Earth. The life of the quarry project is Three years only.
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
(ii) Estimated project cost along with analysis in terms of economic viability of the project
A. Fixed asset cost
Land cost = Rs. 2, 94,500/-
Temporary rest Shelter = Rs. 50,000/-
First aid room and accessories = Rs. 50,000/-
Sanitary facilities = Rs. 50,000/-
Total cost = Rs. 4, 44,500/-
B. Operational cost
For Excavation = Rs. 4, 92,000/-
Fencing Cost = Rs. 1, 00,000/-
Drinking Water = Rs. 36,000/-
Sanitary maintenance = Rs. 50,000/-
Safety kits = Rs. 10,000/-
Leveling after quarrying = Rs. 50,000/-
Total Operational Cost = Rs. 7, 38,000/-
C. EMP cost
Water Sprinkling = Rs. 1, 00,000/-
Afforestation cost = Rs. 30,000/-
Total EMP cost = Rs. 1, 30,000/-
The project cost:
A. Fixed asset cost = Rs. 4, 44,500/-
B. Operational cost = Rs. 7, 38,000/-
C. EMP cost = Rs. 1, 30,000/-
Total Cost = Rs. 13, 12,500/-
CSR Cost (2.5%) = Rs. 50,000/-
Total cost = Rs. 13, 62,500/-
� The total Project cost (A+B+C) and including CSR cost is about Rs.13,62,500/- (Rupees
Thirteen lakhs sixty two thousand five hundred only)
� The total EMP cost is around Rs. 50,000/- (Rupees Fifty thousand only)
Population Benefit
The applicant ensures to take social responsibilities like providing School Note books,
Uniforms to the Students below poverty level beside if the villages require any borehole for public
use the applicant ensure to do so. The applicant will also take part and contribute the native cultural
activities in the nearby villages. During summer seasons packaged drinking water will be kept in the
village for public and for tress pallers. The applicant will involve and contribute all the socio cultural
allocation in and around the area.
Government Revenue
The state Government will get revenue as Royalty, sale tax, surface rent, dead rent/ VAT/
income tax etc.
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR
Under EIA Notification 2006
9.0ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)
(i) Financial and social benefits with special emphasis on the benefit to the local people
including tribal population, if any, in the area
The Excavated Earth is utilized for public and private sector projects for filling and leveling
the low lying areas, Besides the Earth also used for domestic housing and infrastructure projects of
the district. Due to this project many of the infrastructure development will be carried out in and
around the district on time, nearly 7 employees directly and 5 employees indirectly get employment
opportunity through this project. The detail furnished in this mining plan is based on information
provided by the state Government and lessee. By considering the merit of the project the permission
may be granted.
Place: Tirunelveli
Date: 19.09.2016
1. Signature of the Applicant
J.Rajkumar
2. Signature of the Recognized qualified person
Dr. P. Thangaraju, M.Sc., Ph.D.,
RQP/MAS/206/2007/A
BASE LINE STUDIES OF PAZHAVOOR PART -1 EARTH QUARRY J.RAJKUMAR
Base Line Studies is Prepared for
Pazhavoor Part-1 Earth Quarry
BASE LINE STUDIES OF PAZHAVOOR PART -1 EARTH QUARRY J.RAJKUMAR
BASE LINE STUDIES
The base line study is prepared for Pazhavoor Part -1 Earth Quarry project. Base line
studies provide a base data for regular Environmental Monitoring and Environmental Impact
Assessment (EIA).
The baseline study is provides bench mark for carrying out environmental Impact
assessment due to the course of quarrying and mining activities. The purpose of these studies is
to evaluate the benefited and adverse effect of developing activities on the neighborhood
environment and the area where the quarrying is proposed to carry out.
Mr. J.Rajkumar applied for Earth Quarry project lease for over an extent of 1.47.25Ha
in S.F.No:1004/2 (P) at Pazhavoor Part-1 Village of Radhapuram Taluk, Tirunelveli
District, Tamilnadu.
General approach to Environment
The Environmental besides data comprise of the features present of the site area its
includes environmental features such as forest area, conservation area, water bodies, industries,
wild life and fauna place of historic and importance etc.,
The data collected to cover the following.
1. Air environment
2. Noise Environment
3. Water environment
Air Environment
Ambient Air quality has been assessed through a net – Work of 3 ambient air quality
stations. Standard monitoring and analysis procedures were adopted for adopted for determining
the Air quality parameters. The PM10, PM2.5, SO2, NO2 are monitored as per prescribed
guidelines/methods. The AAQ monitored data for all locations for above parameters are shown
in Table No: 1
S.No Test Parameters Unit Protocol Results CPCB
Standards
1 Particulate matter less
than 10 micron size
(PM10)
µg/m3
IS 5182 Part 23-2006 41.6 100
2 Particulate matter less
than 2.5 micro size
(PM2.5)
µg/m3 IS 5182 part 4-1999
(Reaff 2010)
20.4 80
3 Sulphur dioxide SO2 µg/m3
IS 5182 part 2-2001
(Reaff 2006)
4.1 80
4 Nitrogen Dioxide NO2 µg/m3 IS 5182 Part 6-2006 5.3 80
BASE LINE STUDIES OF PAZHAVOOR PART -1 EARTH QUARRY J.RAJKUMAR
Noise Environment:
Sound can be defined as atmospheric or air vibration perceptible to ear. Noise is usually
unwanted or undesired sound. Consequently, particular sound can be noise to one person and not
to others or noise at one time and not at other time. Hence sound loud enough to be harmful is
called noise without regard to its characteristics. Noise is a form of pollution because it can cause
hearing impairment and psychological stresses.
The noise level measurement in the core zone and nearby buffer zone area was carried
out to evaluate the future impact on noise environment due to the proposed mining operation.
Noise measurements were carried out using Lutron SL 4001 sound level meter. The result of
hourly background noise levels for all locations are given in Table No: 2
S.No Location Results
dB (A)
CPCB Standard
Limit
1 Project site – Centre area 39.1 70*
2 Project Site SW corner 41.3 70*
3 Project site SE Corner 43.1 70*
4 Project site NE Corner 42.5 70*
Water environment
Assessment of baseline data on water environment includes identification of water
resources, collection of water samples, Analyzing water samples collected for Physico –
Chemical parameters as per standards. 1 bore well and 2 well water samples were collected and
the water quality results are given Table No: 3
Test Protocol Results Limits as per IS 10500 : 2012
Acceptable
Limit
Permissible limit in the
absence of alternate
source
Colour IS : 3025 part : 4-1983
(Reaff : 2006)
9.2Hazen 6 15
Odour IS : 3025 part : 5-1983
(Reaff : 2006)
Agreeable Agreeable Agreeable
pH at 250C IS : 3025 part : 11-
1983 (Reaff : 2006)
6.1 7.5 – 8.5 No relaxation
Total Dissolved
solids
IS : 3025 part : 16-
1984 (Reaff : 2006)
1415mg/l 600 mg/l 2000mg/l
Aluminiumas Al IS : 3025 part 2:2004
(Reaff : 2009)
BDL (DL:0.005
mg/l)
0.04 mg/l
0.2 mg/l
Barium as Ba IS : 3025 Part 2:2004
(Reaff : 2009)
0.20mg/l 0.7mg /l No relaxation
Boran as B IS : 3025 Part 2:2004
(Reaff : 2009)
BDL (DL: 0.1
mg/l)
0.5mg /l 1.0mg/l
Calcium as Ca IS: 3025 Part 2: 2004
(Reaff : 2009)
149.2mg/l 75mg/l 200mg/l
Chloride as Cl IS : 3025 Part 32-1988
(Reaff . 2009)
463mg/l 245mg/l 1000mg/l
Copper as Cu IS: 3025 part 2: 2004
(Reaff : 2009)
BDL (DL:0.01
mg/l)
0.05mg/l 1.5mg/l
Fluoride as F IS : 3025 Part 60: 2008 0.71mg/l 1.0mg/l 1.5mg/l
BASE LINE STUDIES OF PAZHAVOOR PART -1 EARTH QUARRY J.RAJKUMAR
Flora and fauna in and around the area
A detail study related to flora and fauna was carefully observed physically by
environmental engineers, Botanist and zoologist. The following table shows the flora and Fauna
available at the region.
S.No Common Name Botanical name Pictures
1. Neem Azadirachata indica
2. Korai Cyperus Pangorei
3. Oomathai Daturametel
4. Sappathikalli Opuntiadillenii
5. Pirandi Cissusquadrangularis
6. Karuvelam Tree Acsia nilotica
7. Palm tree Borassus falabellifer
8. Velikathan Prosopis juliflora
9. chotthukatali Aloe Vera
10. Mookuthichedi Tridax procumbens
List of Faunas
S.No Common Name Scientific name 1. Frog Rana aurora
2. Dog Canius familairis
3. Goat Capra hircus
4. Crow Corvus splenders
5. Squirrel Rodentia scrurus,
6. Ant Hymenopterous formicida,
7. Cat Felsis catus
BASE LINE STUDIES OF PAZHAVOOR PART -1 EARTH QUARRY J.RAJKUMAR
Conclusion
The base line studies relents no hazardous levels of dust and noise and prevailing at the
project area. A well implemented environmental Management plan as discussed in the mining
plan will help in mitigation the adverse effects due to quarrying activities.
The movement of vehicles is very minimal. The entire vehicle used will be periodically
maintained by well experienced mechanic and kept under TNPCB standards, emission testing
will be carried out periodically and water will be sprinkled periodically to prevent dust into air.
The small quantity of non-humus rich surface soil will be removed and preserved in the
boundary barrier to facilitate the Afforestation.
Environmental care and attitude of preventing environment is inducted to the proponent
and advice to carry out and mitigate the minor impacts due to quarrying. Appropriate persons are
advice to get employed to protect the Environment and Ecology of the area.
Date : 19.09.2016
Place : Tirunelveli
1. Signature of the applicant
J.Rajkumar
2. Signature of the Recognized qualified person
Dr. P. Thangaraju, M.Sc., Ph.D.,
RQP/MAS/206/2007/A