Seymour River Canyon Trail Connections 

Seymour River Rockslide ‐ Location 

Rockslide

Seymour Capilano Filtration Plant

Aerial view of LSCR 

Seymour‐Capilano Filtration Plant

Former Twin Bridge location

Lower Seymour Conservation Reserve (LSCR) 

TrailsRockslide  

Hyannis Point

Dec. 7, 2014

Aerial view of slide siteWest at top

View of slide looking upriver

Seymour River Rockslide

Emergency Response ‐ Incident Command

• Emergency services on site• Ongoing monitoring of river and slide• Assessments• Closed unsafe trail sections• Removed Twin Bridge (immediate railing removal)• Provided information to public

Emergency Response: Trail Closures

Fisherman’s Trail closed

Bottle Top Trail closed

Twin Bridge removed

Former Twin Bridge

Rockslide

Closed sections

Emergency Response: Trail Closures cont. 

Flooding on Fisherman’s Trail

Posted advisory signage 

Emergency Response: Twin Bridge Removal  

Pre‐rockslide

Submerged bridge anchor after removal

Emergency Response: Twin Bridge Removal

N

Post‐rockslide:  Dec 10, 2014

S

Post‐rockslide: looking up river

Permanent Changes

Flooding after significant rainfall

Rockslide

Former Twin Bridge location

River Dynamics 

Pre‐rockslide Water Levels (2013)

Former Twin Bridge Elevation

Heavy Rain Events

Post‐rockslide Water Levels (2015)

Assessments 

1) Twin Bridge removal‐ All‐Span Engineering and Construction Ltd.‐ Associated Engineering

2) Geotechnical assessment of slide site ‐ BGC Engineering Inc.

3) Hydrology of the Seymour River and change in channel structure‐ Northwest Hydraulic Consultants

4) Slope stability of flooded area ‐ Cordilleran Geoscience 

5) Tree mortality in flooded area‐ Diamond Head Consulting

Assessments: Geotechnical analysis of slide site BGC Engineering Inc.

Assessments: Hydrology of the Seymour RiverNorthwest Hydraulic Consultants

Assessments: Tree Mortality and Slope StabilityDiamond Head Consulting and Cordilleran Geoscience 

Flooded forest floor 

Public  Safety

PICTURE OFF NEW SAAFETY SIGN

Public Safety

• Patrolling and creating awareness for public about hazards

• Decommissioning unauthorized trails that lead down to the river

• Continuing geological monitoring of rockslide site 

• Monitoring tree mortality in flooded area 

• Gathering data on fluctuating river levels

Future Options & Opportunities

Future Opportunities: Investigations Spur 4 Bridge

RockslideFormer Twin Bridge location

Baden‐Powell Bridge

Suicide Branch

Bottle Top

Canyon Creek Bridge (north of Riverside 

Dr.)

Future Opportunities: A New Pedestrian Bridge 

Rockslide

Former Twin Bridge location

Example of pedestrian bridge structure 

Riverside Drive: Access to Water Infrastructure

Seymour Water Main

Riverside Dr.

Canyon Creek Bridge

Future Opportunities: Canyon Creek Bridge

Canyon Creek pedestrian bridge at Riverside Drive

Planned & Proposed Trail Improvements

Trail Improvements: New Trail Connections 

Rockslide

Former Twin Bridge location

Baden‐Powell Trail

New Richard Juryn – Twin Bridges trail connector

New Fisherman’s Trail 

Trail Improvements: Baden‐Powell Trail

Baden‐Powell Bridge

Next Steps & Staying Informed

Timeline for Construction & Community Relations 

Timeframe  Summer‐Fall 2015

Fall 2015 2015 2016 2017‐2018

Activity  Construction:

Baden‐Powell Trail upgrades

Construction:

Powerline to Twin Bridge trail connection

Conceptual Design:

Pedestrian  crossing and Canyon Creek Bridge

DetailedDesign:

Pedestrian  crossing and Canyon Creek Bridge

Proposed Construction:

Pedestrian  crossing and Canyon Creek Bridge

Outreach  Email, web and signage updates

Email, web, Twitter and signage updates

Email, web, twitter and signage updates

Email, web, twitter and signage updates

Email, web, Twitter, signage & hand‐deliveredcommunication updates

Metro Vancouver is committed to keeping you informed 

How to Stay Informed 

• Website:  www.MetroVancouver.org/TrailConnections

• Twitter: @MetroVancouver

• Your Community Liaison Officer, Steve Billington

Next Steps 

• Metro Vancouver is gathering input at this stage of this review process

• A summary of the input provided will be distributed via email  in July 2015

• Metro Vancouver staff will continue to provide updates during this process