The Nicolson Institute Founded in 1873 by Alexander Morison Nicolson

The original school building

Francis Street Building added in 1898

The clock tower constructed in 1902

Matheson Hall Infant Department built in 1904

A new gymnasium gifted to the school in 1907 and Springfield North technical school in 1910

The Nicolson Institute 1910

The Nicolson Institute 1910

Original school and clock tower

The Nicolson Institute 1910

Original school and clock tower

Matheson Hall

The Nicolson Institute 1910

Original school and clock tower

Matheson Hall

Springfield North(The Pentland Building)

The Nicolson Institute 1960

The Nicolson Institute 1960

Original school and clock tower

Matheson Hall

Springfield North and Old Gymnasium

The Nicolson Institute 1960

Springfield South

Assembly Hall and new Gymnasium

Main School BuildingNorth Huts

The Nicolson Institute 1960

Springfield North and Old Gymnasium

Matheson Hall

Original school and clock tower

Post 1972 – The original Nicolson Institute Building replacedwith The Nicolson – Lewis Sports Centre

The Nicolson Institute Present Day

The Nicolson Institute Present Day

Ionad SporsLeodhais

Comhairle nanEilean Siar

The Nicolson Institute Present Day

The Nicolson Institute Present Day

Matheson HallPresent Day

The Pentland Building and Old Gymnasium Present Day

The Nicolson Institute Present Day

The Nicolson Institute The Future

the new Nicolson Institute Aerial View

Where will the new school be located?

An option assessment was undertaken by Comhairle nan Eilean Siar during 2008 which resulted in the decision to site the school on land bounded by the Matheson Road and Sandwick Road. This ensures close ties to the facilities of the sports centre and maintains the school’s presence in the area where it has been for over 136 years.

Comhairle Office entrance squareSandwick Road

What facilities will be provided?

Every department of the school will have new facilities. The retained listed buildings will accommodate a computer technician’s base, and potentially the technical department. Full details of exact layouts will be developed with the school over the coming months and it is intended that some facilities will be available to the public through the Comhairle’s Schools’ Lets Policy.

Covered approach from the new bus park

How will the school be affected?

Careful consideration has been given to minimising the disruption to the running of the school. The site will be separated from the school for safety and operations and traffic movements strictly managed to reduce nuisance from noise and dirt. Some temporary accommodation may be required during the construction process. These plans will be developed in conjunction with the school and Comhairle.

Pentland Square and Pupil Entrance

How will the public be affected?

Temporary arrangements will be made to manage traffic and parking in and around the new school site. Safety will be the prime concern at all times and plans will be developed in conjunction with the Comhairle’s Road Safety Officer.

School Entrance and Clock Tower Square

When will the new school be open?

It is hoped that the design and planning process will allow a tender to be issued in the Autumn of 2009, with construction starting in 2010. The new school would then be open by Autumn term 2012.

any questions

or comments

Please speak to a member of the project team or

fill out a comments form