2

Integrated Overflow Control Plan (IOCP)

The IOCP

A $729 Million Plan resulting from Federal EPA and DOJ action as a result of

the Clean Water Act and subsequent Combination Sewer Overflow (CSO)

legislation

• 2 Billion Gallons of CSO Reduced to 40 Million Gallons per year

• 45 Activations of CSO Reduced to 4 Activations per year

• 336 Contracted Projects

• 24 ½ Years of Design and Construction

3

Integrated Overflow Control Plan (IOCP)

4

The Bee Slough Build Out

5

Southeast Gateway Today

6

Southeast Gateway Post IOCP

7

Southeast Gateway Design Considerations

8

Southeast Gateway Design Considerations

9

Southeast Gateway Design Considerations

10

Southeast Gateway Design Considerations

11

Cass Adams Interceptor

12

Effluent Pumping Station

13

Effluent Pumping Station

14

Effluent Pumping Station

15

Effluent Pumping Station

16

East Treatment Plant

17

Wetland Pump Station

18

Wetland Underflow Pipe

19

Constructed Wetland

20

Vertical Treatment Unit

21

Southeast Gateway Post IOCP

22

Southeast Gateway (Future)

23

Southeast Gateway (Today)

24

Southeast Gateway (Future)

25

Southeast Gateway (Future)

26

Southeast Gateway (Future)

Composite Cost: $0.31/gal

$0.46

$0.45

$0.61

$0.39

$0.61

$0.17

$0.20

$0.38

Geology favorable(RIPR) Initiative overlap Commercial 9% CSO Volume 12% IOCP Cost

28

IOCP – Green Infrastructure

29

IOCP – Green Infrastructure

31

IOCP – Green Infrastructure

32

IOCP – Green Infrastructure

And Why??

- 5.3M Gallon Discrepancy Between “The Deal” and

the Recalibrated Models

- $35M cost if all additional tankage

- The Alternatives?

- Green Infrastructure at $20M +/-

33

EWSU – Program Management Office (PMO)

Capital Planning and Project Execution

Capital Project Managers

IOCP Projects Manager

IOCP Construction Manager

Wastewater Capital Projects Manager

Water Capital Projects Manager

34

EWSU - PMO

Capital Planning and Project Execution

25-Year Projections

50% IOCP ($729M)*

21% Non-IOCP ($300M)*

29% Water ($420M)*

*2015 Dollars

35

EWSU - PMO

Utility Capital Project Development (15%)

Senior Designers

Land Surveyor

Project Development Manager (field)

36

EWSU - PMO

Strategic Consultant Support

IOCP Program Management

Water Program Management

Project Design

Construction Engineering

Green Infrastructure Modeling

37

EWSU - PMO

Strategic Consultant Support Selection

Statement of Interest (SOI)

EWSU.com; Engineering Department; 18-mo RFP

Selection Committee

Michael Labitzke, P.E.

Deputy Director Utilities – PMO

mlabitzke@ewsu.com