THE FLOATATION PROFESSIONALS
01ABOUT US
2,973Buoyancy Elements Serviced
Over 6 Years
17Rigs Actively Serviced
10Industry-Leading Repair
Procedures
4Active Continents
OUR COMPANYProFloat are experts in the maintenance of Drill Riser Buoyancy Modules, offering industry-leading repairs,
modifications and condition assessments worldwide. Since establishment we have attended to the maintenance of thousands of Buoyancy Modules for various drilling contractors in Africa, Europe, Asia and Australia.
Our repairs are not only world-class but present significant long-term value relative to their cost, by ensuring that buoyancy equipment achieves its intended life span. We carry out repairs in the field at any location
required by the Drilling Contractor, and we do so at any time throughout the life cycle of the buoyancy and often coincides with 5 year and 10 year riser recertification windows. With our field service repair solution, we also bring the same quality and value to the field wherever you need us. Having carried out numerous
international field service projects, we have perfected a field service Buoyancy Maintenance Solution.
BEST IN CLASS BUOYANCY REPAIRS
EXTREMELY SHORT PROJECT TIMES
LOW CRITICAL MASS FOR MOBILIZATION
HIGHLY FLEXIBLE, IN AND OUT SERVICE
AVOID DROPPED OBJECT RISKS
AVOID QUARANTINING RISER JOINTS
MAXIMIZE BUOYANCY LIFESPAN
ALIGN WITH THE CBM ETHOS
OUR TEAM
ProFloat is led by enthusiastic and dynamic professionals with key skill sets representing
a number of fields: commercial & legal, mechanical engineering & ship design, systems infrastructure & network design,
composite fabrication, production, coating and quality control, each chosen for their
ability to add value to the company’s current and long-term objectives.
KEANE HARVEYManaging Director
RIGHARD KEYSERSystems Manager
RICARDO ESTERHUIZEN
Production Supervisor
PHILIP LOUWDesign &
Project Engineer
MARLON OKKERSProduction Manager
JEROME LOUWQuality Manager
02OUR SERVICES
BUOYANCY REPAIR
Drill Riser Buoyancy is costly equipment intended to last 20 years. Potential down
time or quarantining of impaired riser joints can result if this equipment is not properly
maintained in fit for service condition.
Buoyancy is unfit for service if it is cracked, broken in multiple pieces, missing major sections, contains deteriorated buoyancy material or has suffered water ingress. Buoyancy which does not suffer these defects but isn’t suitable for its purpose
may require modification, such as channel modification, installation of MUX clamp
windows and similar.
ProFloat has developed a best-in-class repair methodology over 10 years of service in
the industry. We have over 35 technicians trained extensively in all categories of repair. Combining this with specialized
products and materials intended for rigorous offshore use, we provide a repair quality
which is second to none. Below is an overview of the repair process:
Transverse Crack Repair
Channel Alignment For Main Tube & Aux Line Housing
Painting & Marking
Longitudinal Crack Repair
Shaping & Fairing of Critical Dimensions
QC & Weighing
Buildup of Major Sections
Lamination & Skin Restoration
Reporting & Data Packs
RISER DRESSING & BUOYANCY SWOP-OUT
Our customers often require our assistance in the field where they have little or no
personnel and support.
In these situations, we provide a turn-key solution by undressing the riser joints,
repairing the buoyancy and then redressing the riser joints to be ready for load out and
return to the rig.
We also carry out buoyancy Swopout, which entails making up the desired number
of joints of the desired depth rating, providing a Disposition Report regarding
damage observed and providing a reliable basis for reactivation-related costs.
MODIFICATION & REPAIR OF RISER FITMENTS
Buoyancy may require other work, aside from repair. This can include modification of the main channels in order to fit a different riser configuration, or installation of MUX
clamp windows.
ProFloat completes this work seamlessly as a stand-alone service or as a part of any on-going repairs. The output is a product which is more suited to the needs of our customers.
In addition, we are occasionally required to repair and replace other riser fitments, such
as riser guards and centralizers.
1
2
608
50
A
A
2° TAPER
B
B
A
A 676
R692
R595
R127 TYP
R276
R83
R51
1382
30° 60
35 25
R403
45°
200
25 35
60
R692
1382
30°
R595
R51 TYP
676
R403
R127 TYP
45°
R432
25
200
1352Nom ACROSS FLATS
SECTION A-A
HYDRAULIC LINERECESS x 2
BOOSTER LINERECESS x 1
CHOKE & KILLLINE RECESS x 2
GLYCOL LINE RECESS x 1
ITEM NO. PART NUMBER DESCRIPTION QTY. MATERIAL
1 92-0100-2 Centralizer Module Type B 1 PU
2 92-0100-3 Centralizer Module Type A 1 PU
DRAWN
CHK'D
APPV'D
NAME DATE
DO NOT SCALE DRAWING
TITLE:
DWG NO.
SCALE:1:14 SHEET 1 OF 1
A3
N. KABLE
XXXX
XXXX XXXX
2018/02/18
XXXX
D92-0100
RIGID RISER CENTRALISER MODULE FOR BARE JOINTS
AREV
DEBURR AND BREAK SHARP EDGES
UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN: INCHES MM DUAL - INCHES [MM]
TOLERANCES:LINEAR FRAC. ± 1/16 [1.6] X.XX ± 0.03 [0.8] X.XXX ± 0.010 [0.25]ANGULAR X° ± 1° X.XX° ± 0.50°SURFACE TEXTURE 250 µIN [6.3 µM]BREAK CORNERS .01/.03 [0.25/0.76] X 45°FILLET RADIUS .03/.06 [0.76/1.52]
FOR HAND GRINDING & FABRICATION WORK:ANGULAR X° ± 2.5°
THIRD ANGLE PROJECTION
PROPRIETARY NOTICETHE INFORMATION CONTAINED IN THIS DOCUMENT IS
PROPRIETARY TO PROFLOAT AND IS HIGHLY CONFIDENTIAL. ACCORDINGLY, SUCH INFORMATION MAY
NOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, WITHOUT THE EXPRESS WRITTEN AUTHORIZATION
FROM PROFLOAT.
A A
B B
C C
D D
E E
F F
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
157
.50
400
200
50
A
A
60°
76.
20
50
EQUAL EQUAL
CL
0.5 in CHAMFERCMUX CLAMP BOLTALLOWANCE BOTH SIDES
C
CC
C
157
.50
SECTION A-A
MUX CLAMP BOLTALLOWANCE
1:25
P.LOUW 24/03/2018XXX XXXXXX XXX
X
MUX CLAMP LOCATIONS
MUX-001
8 7
A
B
23456 1
578 246 13
E
D
C
F F
D
B
A
E
C
NAME DATE
A3CREV
TITLE
DEBURR AND BREAK SHARP EDGES
THIRD ANGLE PROJECTION
DWG No.
SCALE : SHEET 1 OF 1DO NOT SCALE DRAWING
DRAWNCHECKEDAPPROVED
PROPRIETARY NOTICETHE INFORMATION CONTAINED IN THIS DOCUMENT IS
PROPRIETARY TO PROFLOAT AND IS HIGHLY CONFIDENTIAL. ACCORDINGLY, SUCH INFORMATION
MAY NOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, WITHOUT THE EXPRESS WRITTEN AUTHORIZATION
FROM PROFLOAT
UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN:
INCHESMMDUAL - INCHES [MM]
TOLERANCES:LINEAR FRAC. ± 1/16 [1.6] X.XX ± 0.03 [0.8] X.XXX ± 0.010 [0.25]ANGULAR X° ± 1° X.XX° ± 0.50°SURFACE TEXTURE 250 µIN [6.3 µM]BREAK CORNERS .01/.03 [0.25/0.76] X 45°FILLET RADIUS .03/.06 [0.76/1.52]FOR HAND GRINDING & FABRICATION WORK:ANGULAR X° ± 2.5°
03READINESS REPORTING
DEPTH READINESS
We have developed a specialized reporting & disposition process that gives our customers key insights into the depth
readiness of their riser string.
Tailored to suit stacked rigs or rigs awaiting contract, our Readiness Reporting is
designed to highlight the true condition of the buoyancy on any rig, detailing the
number of elements requiring repair in order to fulfil contractual depth obligations, form
the basis of on-going maintenance cost forecasting and facilitate buoyancy storage
and rotation programs.
Since introducing this service, we have been invited to numerous rigs in locations around the world to provide this cost effective and
insightful report.
READINESS REPORT
Drilling Contractor
Drill Riser Buoyancy Modules
OEM : XYZ Corporation
READINESS REPORT Doc. No. PRO-QA-072
Rev. No. 000
Uncontrolled if Printed Date Printed : 2018-08-27 Page 3 of 18
i. Introduction ProFloat are experts in the lifecycle management of drill riser buoyancy. This entails industry-leading repairs, modifications, handling (dressing, undressing, swop-out) and condition assessments, all of which are provided worldwide by means of facility and field services. ProFloat have been engaged by the Drilling Contractor to prepare this Readiness Report in respect of the drill riser buoyancy on 108 buoyant riser joints belonging to the Rig. The inspection was carried out on 14 August 2018 in Tenerife. Due to the extremely good accessibility to every tier of the riser bay, we were able to carry out a more in-depth inspection than originally expected. That said, there were still elements in the interior of the stack and centre of the riser joints which we were not able to inspect at all. In summary, we found 65 elements requiring repair, of which 32 elements are categorised as Majors and 33 as Mediums. Due to the nature of the mediums (being delamination), we highly recommend that these be repaired in order to avoid them degrading further. Additional comments on this point are set out further below. We estimate that there are a further 10 to 15 elements on the interior of the riser bay that would likely require repair. ii. Purpose With reference to the buoyant riser joints in the Riser Bay of the Rig, the purpose of this Readiness Report is threefold: - Provide an indication of the number of buoyancy elements requiring repair;
- Provide comments on kinds of damage observed, the possible cause of the damage and associated recommendations;
- Provide commentary on the readiness for contractual depth obligations;
- Provide a basis for a detailed budgetary quotation to assist in readiness planning.
READINESS REPORT Doc. No. PRO-QA-072
Rev. No. 000
Uncontrolled if Printed Date Printed : 2018-08-27 Page 9 of 18
1.2 Damage Report for Buoyancy Elements
019
B1 = DL
READINESS REPORT Doc. No. PRO-QA-072
Rev. No. 000
Uncontrolled if Printed Date Printed : 2018-08-27 Page 4 of 18
iii. Categories of Damage and Repair
Throughout this document, reference will be made to Minor, Medium and Major damaged elements and the various forms of damage. The below table indicates the criteria to be met for an element to fall into each of the damaged types:
Minor
Element exhibits any or all of the following: 1 - 25% skin damage, small defects (defects less than 10mm deep with no macrospheres exposed), minor edge damage and requires painting with depth-rating colour bands and markings as per API 16F.
Elements categorized as Minors do not require repair to be operational
Medium
Element exhibits any or all of the following: 25 - 50% skin damage, medium defects (defects up to 2,000ml in volume with macro-spheres exposed), medium edge damage / moderate delamination and requires painting with depth-rating colour bands and markings as per API 16F.
Elements categorized as Mediums require repair to remain operational.
Major
Element exhibits any or all of the following: 50 to 100% skin damage, major defects (defects greater than 2,000ml in volume, requiring macro-spheres and liquid fill), major edge damage / major delamination and require painting with depth-rating colour bands and markings as per API 16F.
Elements categorized as Majors require repair to become operational.
The below table provides overview of the kinds of damage which place an element in the different categories of repair. Further information is set out in the accompanying Inspection Procedure:
Medium Delamination (MEDL)
Skin peeling off of the element across a span of 10 to 25% of the surface of the element, exposing the internal syntactic material to direct water and potential ingress. Distinct from paint peeling which has no practical impact on the use of the element. Elements with Medium Delamination should be repaired to remain operational.
Major Delamination (MADL)
Skin peeling off of the element across a span of 25 to 100% of the surface of the element, exposing the internal syntactic material to direct water and potential ingress. Distinct from paint peeling which has no practical impact on the use of the element. Distinct from Medium Delamination due the extent thereof an immediate risk of falling objects and degradation of internal syntactic material. Elements with Major Delamination must be repaired to remain operational.
Longitudinal Fracture (LF)
A fracture that runs horizontal to the element lying flat. Early stages of Longitudinal Fractures. Elements with Longitudinal Fractures require repair to become operational.
Transverse Fracture (TF)
A fracture that is evident across the length of the element when positioned horizontally Elements with Transverse Fractures require repair to become operational.
Bonds (B) When the element is split into 2 or more pieces. Longitudinal Bond or a Transverse bond. Elements with Bonds require repair to become operational.
READINESS REPORT Doc. No. PRO-QA-072
Rev. No. 000
Uncontrolled if Printed Date Printed : 2018-08-27 Page 10 of 18
1.2 Damage Report for Buoyancy Elements
029
A2 = TF A4 = DL
064
A1 = TF A2 = DL A3 = DL
A4 = TF X 2 B1 = DL B3 = DL
B4 = LF & TF
READINESS REPORT Doc. No. PRO-QA-072
Rev. No. 000
Uncontrolled if Printed Date Printed : 2018-08-27 Page 4 of 18
iii. Categories of Damage and Repair
Throughout this document, reference will be made to Minor, Medium and Major damaged elements and the various forms of damage. The below table indicates the criteria to be met for an element to fall into each of the damaged types:
Minor
Element exhibits any or all of the following: 1 - 25% skin damage, small defects (defects less than 10mm deep with no macrospheres exposed), minor edge damage and requires painting with depth-rating colour bands and markings as per API 16F.
Elements categorized as Minors do not require repair to be operational
Medium
Element exhibits any or all of the following: 25 - 50% skin damage, medium defects (defects up to 2,000ml in volume with macro-spheres exposed), medium edge damage / moderate delamination and requires painting with depth-rating colour bands and markings as per API 16F.
Elements categorized as Mediums require repair to remain operational.
Major
Element exhibits any or all of the following: 50 to 100% skin damage, major defects (defects greater than 2,000ml in volume, requiring macro-spheres and liquid fill), major edge damage / major delamination and require painting with depth-rating colour bands and markings as per API 16F.
Elements categorized as Majors require repair to become operational.
The below table provides overview of the kinds of damage which place an element in the different categories of repair. Further information is set out in the accompanying Inspection Procedure:
Medium Delamination (MEDL)
Skin peeling off of the element across a span of 10 to 25% of the surface of the element, exposing the internal syntactic material to direct water and potential ingress. Distinct from paint peeling which has no practical impact on the use of the element. Elements with Medium Delamination should be repaired to remain operational.
Major Delamination (MADL)
Skin peeling off of the element across a span of 25 to 100% of the surface of the element, exposing the internal syntactic material to direct water and potential ingress. Distinct from paint peeling which has no practical impact on the use of the element. Distinct from Medium Delamination due the extent thereof an immediate risk of falling objects and degradation of internal syntactic material. Elements with Major Delamination must be repaired to remain operational.
Longitudinal Fracture (LF)
A fracture that runs horizontal to the element lying flat. Early stages of Longitudinal Fractures. Elements with Longitudinal Fractures require repair to become operational.
Transverse Fracture (TF)
A fracture that is evident across the length of the element when positioned horizontally Elements with Transverse Fractures require repair to become operational.
Bonds (B) When the element is split into 2 or more pieces. Longitudinal Bond or a Transverse bond. Elements with Bonds require repair to become operational.
READINESS REPORT Doc. No. PRO-QA-072
Rev. No. 000
Uncontrolled if Printed Date Printed : 2018-08-27 Page 10 of 18
1.2 Damage Report for Buoyancy Elements
029
A2 = TF A4 = DL
064
A1 = TF A2 = DL A3 = DL
A4 = TF X 2 B1 = DL B3 = DL
B4 = LF & TF
READINESS REPORT Doc. No. PRO-QA-072
Rev. No. 000
Uncontrolled if Printed Date Printed : 2018-08-27 Page 5 of 18
iv. Traceability and Handling of Joints Traceability of the riser on the Rig must be commended. All riser joints are properly marked, and easily read and distinguishable with regards to serial numbers, riser numbers and depth ratings. It is immediately apparent that the equipment is maintained very deliberately and that the joints are very well looked after. The handling of the joints must be also be commended. It is evident that extreme care is taken when running the joints, on account that there is minimal handling related damage. It appears however that riser joints stored in the upper 30 to 50% of the Riser Bay are being run considerably more than the ones lower down. This is revealed due to the lack of usage marks on the lower 50% of the riser and the lack of fouling / paint discolouration. This may be taken as an Observation on account that it might lead to overuse of certain riser joints, with a potentially negative impact. As you are no doubt aware this can lead to unnecessary wear and tear on the pins, which in turn can lead to increased findings at the next riser inspection window. We found that access within the Riser Storage Bay itself was excellent due to the multiple levels, good lighting and clean / dry environment. However, an aspect which was noticed and pointed out to the Senior Subsea, is that excessive weight is bearing down on the lower 1 or 2 rows of riser. We discovered approximately 7 buoyancy elements at the bottom of the Riser Bay which were cracked longitudinally, and this was due solely to the weight bearing on them. For this reason, we recommend considering the installation of a brace half way up the Riser Bay, to ensure that the load of the risers is transferred to the heavy-duty Riser Bay framework. Alternatively, a chocking system which ensures that the load is shared at the flanges. More detailed recommendations on this topic can be provided if required, including drawings of the proposed brace or chocking. v. Outcome of Inspection Below is an Inspection Report for each riser joint assessed. We draw your attention to the following important considerations and general notes: - There were 12 riser joints at the top of the Riser Bay. These could be inspected very thoroughly, and we
discovered the majority of the damaged elements on these riser joints;
- There were 108 buoyant Riser Joints in the Riser Bay, which are stacked one below the other in columns. Total stacked in each column is 9, and each column is divided according to their specific depth rating. We were able to inspect the outer 4 elements for each of these riser joints (those on the pin and the box end) but not the inner 4 elements of the joints below the top row;
- We estimate approximately 10 - 15 additional elements for repair on the interior stack that could not be visually
inspected;
- Based on the elements identified for repair, being 65 plus the additional quantity estimated 15, the total for repair is 80, which is a repair ratio of about 20%;
- There are approximately 50 other elements requiring minor repair – the repair of which is optional and not
highly recommended, except for the potential benefit of exposing and addressing damage which is likely to become major, such as elements showing early signs of delamination;
- We did not find any elements to be incapable of repair;
READINESS REPORT Doc. No. PRO-QA-072
Rev. No. 000
Uncontrolled if Printed Date Printed : 2018-08-27 Page 11 of 18
1.2 Damage Report for Buoyancy Elements
073
A1 = LF B1 = TF
READINESS REPORT Doc. No. PRO-QA-072
Rev. No. 000
Uncontrolled if Printed Date Printed : 2018-08-27 Page 6 of 18
- Certain of the damage we have identified will appear to be nothing but cracking in the skin of the element, whereas we have identified it as an actual fracture in the element. The reason for this is that the element material is quite brittle, and a fracture on the exterior normally signifies a crack on the interior (similar to concrete). This has proven to be correct numerous times and where we have insufficient external indication of a fracture, we conduct auditory testing (knocking) along the length of the element to identify hollowness;
- Our inspection and repair experience has allowed us to carry out inspections with a typical 97 to 100%
accuracy rate, ensuring that all likely damaged elements are identified at the outset of the project and minimal unplanned repairs become necessary;
- At the time of repairs, any elements which have been identified for repair, but which appear to be in good
condition, will be patched up and returned at no charge.
vi. Special Commentary on Delamination
We observed extensive delamination on the elements. This is extremely concerning for the longevity of the buoyancy elements which are supposed to last for 20 years. This is however something that we see very often with XYZ buoyancy. In fact, our inspection procedure for delamination specifically captures XYZ buoyancy as the example (see excerpt below). In our experience, delamination is followed by extensive material degradation. Due to the tendency for these elements to delaminate and thereafter degrade, we highly recommend that all delamination be attended to, to ensure that we replace the delaminating skin with a new skin and ensure proper adhesion thereof to avoid future delamination recurring, while providing an improved protection layer on the exterior of the elements.
READINESS REPORT Doc. No. PRO-QA-072
Rev. No. 000
Uncontrolled if Printed Date Printed : 2018-08-27 Page 15 of 18
vii. Summary of Findings
Riser No.
A1 A2 A3 A4 B1 B2 B3 B4 NOTES DL TF LF VS
1 DL & TF DL DL DL TF RISER BAY TOP 4 2
2 DL 1
4 DL 1
6 LF 1
7 DL 1
10 TF DL DL DL RISER BAY TOP 3 1
11 DL DL 2
13 DL 1
14 DL 1
16 DL 1
19 DL RISER BAY TOP 1
29 TF DL RISER BAY TOP 1 1
54 LF 1
64 TF DL DL TF X 2 DL DL LF & TF RISER BAY TOP 4 4 1
65 DL 1
67 LF 1
70 LF 1
71 LF LF 2
72 DL LF LF 1 2
73 LF TF RISER BAY TOP 1 1
76 DL & VS 1 1
80 LF 1
81 LF 1
85 DL 1
89 LF LF 2
90 LF 1
91 TF TF X 2 DL DL & TF DL LF RISER BAY TOP 3 5
92 DL 1
93 DL 1
94 DL 1
98 LF 1
99 LF 1
100 DL DL RISER BAY TOP 2
102 DL 1
103 DL 1
109 DL RISER BAY TOP 1
126 VS 1
127 DL RISER BAY TOP 1
132 LF 1
TOTAL MEDIUMS 33 SUB-TOTALS 37 14 18 2 TOTAL MAJORS 32
READINESS REPORT Doc. No. PRO-QA-072
Rev. No. 000
Uncontrolled if Printed Date Printed : 2018-08-27 Page 7 of 18
Below are the findings of our inspection:
1. Buoyancy Disposition Report Serial # Not visible
1.1 Buoyancy Element Location
1.2 Damage Report for Buoyancy Elements
Riser No. Photographs of Element Damage
001
A1 = DL & TF A3 = DL A4 = DL B1 = DL B4 = TF
READINESS REPORT Doc. No. PRO-QA-072
Rev. No. 000
Uncontrolled if Printed Date Printed : 2018-08-27 Page 8 of 18
1.2 Damage Report for Buoyancy Elements
010
A1 = TF A3 = DL A4 = DL B1 = DL
READINESS REPORT Doc. No. PRO-QA-072
Rev. No. 000
Uncontrolled if Printed Date Printed : 2018-08-27 Page 16 of 18
viii. Overview of Repair Processes
Structural
Structural repairs depend on the type of damage categorized, namely: Longitudinal Fracture, Transverse Fracture or Longitudinal Bonding or Transverse Bonding required. Refer to Structural Repair Procedure (PRO-QA-014) or (PRO-QA-039) depending on whether it is a ProFloat or an OEM type of repair.
Shaping
The use of repair material to repair small, medium and large defects by filling voids and shaping the element. Refer to Shaping Department Repair Procedure (PRO-QA-015) or (PRO-QA-038) depending on whether it is a ProFloat or an OEM type of repair.
Fairing
Reshaping and aligning the inside and outer diameter of the element. Refer to Fairing Department Repair Procedure (PRO-QA-016).
Laminating
Repairing Transverse and Longitudinal Bonds, Transverse and Longitudinal Fractures, Medium Defects and Large Defects, applying fiberglass & fiberglass consolidation on the elements. Refer to Laminating Department Repair Procedure (PRO-QA-018) or (PRO-QA-035) depending on whether it is a ProFloat or OEM type repair.
Painting
Preparing the inside and outer diameter of the element. Paint Coating, Signage and Stencilling the inside and outer diameter of the element. Refer to Paint Coating Department Procedure (PRO-QA-022).
READINESS REPORT Doc. No. PRO-QA-072
Rev. No. 000
Uncontrolled if Printed Date Printed : 2018-08-27 Page 17 of 18
ix. Conclusion
- There are very few inspected riser joints which do not require any buoyancy repair;
- We estimate that up to an additional 15 elements that were not capable of being inspected, will require repair;
- The majority of damaged elements fall into the upper joints in the riser bay. This is to be expected on the basis
that these joints are run the most frequently and are run every well;
- We have made recommendations regarding the repair of the Medium and Major damaged elements;
- Often, the repair of elements categorised as Mediums can be avoided but in the present case, to avoid inevitable degradation of the elements, we recommend these repairs;
- Aside from having carried out full-scale repairs for the Drilling Contractor previously, we are also the only
company to have carried out any repairs (of significance) in the Canary Islands;
- We have carried out projects in both Gran Canaria and Tenerife and are an authorised vendor in Tenerife;
- We are in a position to quote on the repair of these buoyancy elements alone, or in the context of general riser recertification work if any is forecast.
We thank you for the opportunity to visit the Drilling Contractor and look forward to supporting her.
x. Approved and Issued By
Philip Louw ProFloat Project Engineer
Inspector / Customer (as applicable)
Date: 27 August 2018 Date:
04FIT STRAPS™
STRAPS WITH A DIFFERENCE
After passing through the drill floor, the riser joints are often fitted with auxiliary equipment such as MUX clamps for the
fitment of multiplexing (MUX) cabling and strakes or fairings for the reduction of
vortex induced vibration (VIV) or drag. Less common but still significant fitments include
riser monitoring equipment which are appended to the OD of the riser assembly.
The fitment of this auxiliary equipment is a time-critical process, being a bottleneck in the running of the riser joints, thereby
coming at significant and direct cost to the Drilling Contractor.
Similarly, drill riser buoyancy itself must be removed and changed out, repaired or serviced. This is often done in field service
locations during 5 year inspection intervals, which too presents a cost to the Drilling
Contractor, directly or indirectly.
Our Fit Straps™ are the first of their kind and provide a way to both
quick-fit buoyancy to riser, and quick-fit auxiliary equipment to the riser
string.
This Patent Pending equipment produces real cost savings and opens a world of opportunities for real-time
monitoring of the riser column.
2
5
4
6
1
3
COUNTERSUNK STAINLES STEEL FASTENERS
COUNTERSUNK STAINLES STEEL FASTENERS
33 50 78 90
40
AA
SECTION A-A
110
90
64
290
58 57 LOCKING FASTENER
SCALE 1:3
ALL COMPONENTS A4 316 STAINLESS STEEL
ITEM NO. PART NUMBER QTY.
1 Main Rotating Fixed Pin 2
2 Main Fixed Pin 1
3 Buckle Side RHS 1
4 Buckle Side LHS 1
5 Buckle Union Housing Assembly 1
6 Tensioning Assembly 1
Buckle Union Assembly
Buckle Union Assembly
UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN: INCHES MM DUAL - INCHES [MM]
TOLERANCES:LINEAR FRAC. ± 1/16 [1.6] X.XX ± 0.03 [0.8] X.XXX ± 0.010 [0.25]ANGULAR X° ± 1° X.XX° ± 0.50°SURFACE TEXTURE 250 µIN [6.3 µM]BREAK CORNERS .01/.03 [0.25/0.76] X 45°FILLET RADIUS .03/.06 [0.76/1.52]
FOR HAND GRINDING & ABRICATION WORK:ANGULAR X° ± 2.5°
PROPRIETARY NOTICETHE INFORMATION CONTAINED IN THIS DOCUMENT IS
PROPRIETARY TO PROFLOAT AND IS HIGHLY CONFIDENTIAL. ACCORDINGLY, SUCH INFORMATION MAY NOT BE REPRODUCED OR DIVULGED, IN WHOLE
OR IN PART, WITHOUT THE EXPRESS WRITTEN AUTHORIZATION FROM PROFLOAT.
THIRD ANGLE PROJECTION
DEBURR AND BREAK SHARP EDGES
REVA
05/04/2019
PL
A3
SHEET 1 OF 1SCALE:1:2
DWG NO.
TITLE:
DO NOT SCALE DRAWING
DATENAME
APPV'D
CHK'D
DRAWN
3
1
2
COUNTER SUNK HEX HEAD COUNTER SUNK HEX HEAD
A
A
2mm
ST
RAP
ALLO
WAN
CE 2
mm
STRA
P AL
LOW
ANCE
62
B
B
CC DD
0 2
5 6 8
10 12 14
SECTION A-A
FASTENER TO KEEP OUTER AND INNER HOUSING SECURED
16
0 2
2 5
8 12
6
14
SECTION B-B FASTENER TO KEEP OUTER AND INNER HOUSING SECURED
R5
0
15
30
40
50
65
80
0
10
25
35
45
60
70
SECTION C-C
55
20
21
,8
62
62
50
SECTION D-D
1
2
3
ALL COMPONENTS A4 316 STAINLESS STEEL
ITEM NO. PART NUMBER QTY.
1 Strap union Housing 1
2 Strap Union Inner Housing 1
3 Strap Union Connector 1
Strap Union Assembly
Strap Union Assembly
UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN: INCHES MM DUAL - INCHES [MM]
TOLERANCES:LINEAR FRAC. ± 1/16 [1.6] X.XX ± 0.03 [0.8] X.XXX ± 0.010 [0.25]ANGULAR X° ± 1° X.XX° ± 0.50°SURFACE TEXTURE 250 µIN [6.3 µM]BREAK CORNERS .01/.03 [0.25/0.76] X 45°FILLET RADIUS .03/.06 [0.76/1.52]
FOR HAND GRINDING & ABRICATION WORK:ANGULAR X° ± 2.5°
PROPRIETARY NOTICETHE INFORMATION CONTAINED IN THIS DOCUMENT IS
PROPRIETARY TO PROFLOAT AND IS HIGHLY CONFIDENTIAL. ACCORDINGLY, SUCH INFORMATION MAY NOT BE REPRODUCED OR DIVULGED, IN WHOLE
OR IN PART, WITHOUT THE EXPRESS WRITTEN AUTHORIZATION FROM PROFLOAT.
THIRD ANGLE PROJECTION
DEBURR AND BREAK SHARP EDGES
REVA
04/04/2019
PL
A3
SHEET 1 OF 1SCALE:1:1
DWG NO.
TITLE:
DO NOT SCALE DRAWING
DATENAME
APPV'D
CHK'D
DRAWN
5
3
1 4
COUNTERSUNK STAINLES STEEL FASTENERS
COUNTERSUNK STAINLES STEEL FASTENERS
SLOTTED HOLE FOR TENSIONING TOOL
2
WELDED
WELDED
30
0
11
50
11
45
45
AA
B
B
125
74
84 6
4
SECTION A-A
WELDED
WELDED
WELDED
21
SECTION B-B
SLOTTED HOLE FOR TENSIONING TOOL
ALL COMPONENTS A4 316 STAINLESS STEEL
ITEM NO. PART NUMBER QTY.
1 Main Rotating Pin 1
2 Centre Rotating Part LHS 1
3 Centre Rotating Part 1
4 Small Fixed Pin Short 1
5 Main Fixed Pin Short Long 1
Tensioning Assembly
Tensioning Assembly
UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN: INCHES MM DUAL - INCHES [MM]
TOLERANCES:LINEAR FRAC. ± 1/16 [1.6] X.XX ± 0.03 [0.8] X.XXX ± 0.010 [0.25]ANGULAR X° ± 1° X.XX° ± 0.50°SURFACE TEXTURE 250 µIN [6.3 µM]BREAK CORNERS .01/.03 [0.25/0.76] X 45°FILLET RADIUS .03/.06 [0.76/1.52]
FOR HAND GRINDING & ABRICATION WORK:ANGULAR X° ± 2.5°
PROPRIETARY NOTICETHE INFORMATION CONTAINED IN THIS DOCUMENT IS
PROPRIETARY TO PROFLOAT AND IS HIGHLY CONFIDENTIAL. ACCORDINGLY, SUCH INFORMATION MAY NOT BE REPRODUCED OR DIVULGED, IN WHOLE
OR IN PART, WITHOUT THE EXPRESS WRITTEN AUTHORIZATION FROM PROFLOAT.
THIRD ANGLE PROJECTION
DEBURR AND BREAK SHARP EDGES
REVA
05/04/2019
PL
A3
SHEET 1 OF 1SCALE:1:1
DWG NO.
TITLE:
DO NOT SCALE DRAWING
DATENAME
APPV'D
CHK'D
DRAWN
90
A
A
R655
60°
60°
SECTION A-A
8085mm ESTIMATED LENGTH WITHOUT TORQUE
APPLIED FROM BUCKLE
118
40
DRAWN
CHK'D
APPV'D
NAME DATE
DO NOT SCALE DRAWING
TITLE:
DWG NO.
SCALE:1:10 SHEET 1 OF 1
A3
XXXX XXXX
LARGE STRAP
KEVLAR REINFORCED STRAP
AREV
DEBURR AND BREAK SHARP EDGES
THIRD ANGLE PROJECTION
PROPRIETARY NOTICETHE INFORMATION CONTAINED IN THIS DOCUMENT IS
PROPRIETARY TO PROFLOAT AND IS HIGHLY CONFIDENTIAL. ACCORDINGLY, SUCH INFORMATION MAY NOT BE REPRODUCED OR DIVULGED, IN WHOLE
OR IN PART, WITHOUT THE EXPRESS WRITTEN AUTHORIZATION FROM PROFLOAT.
UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN: INCHES MM DUAL - INCHES [MM]
TOLERANCES:LINEAR FRAC. ± 1/16 [1.6] X.XX ± 0.03 [0.8] X.XXX ± 0.010 [0.25]ANGULAR X° ± 1° X.XX° ± 0.50°SURFACE TEXTURE 250 µIN [6.3 µM]BREAK CORNERS .01/.03 [0.25/0.76] X 45°FILLET RADIUS .03/.06 [0.76/1.52]
FOR HAND GRINDING & ABRICATION WORK:ANGULAR X° ± 2.5°
A A
B B
C C
D D
E E
F F
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
CONDITION-BASED MAINTENANCE
05CONDITION-BASED MAINTENANCE
THE BUOYANCY CBM
ProFloat provides condition-based maintenance of buoyancy through our first
of its kind FloatCon™ CBM.
FloatCon™ provides assessments, tracking and repair which align with existing riser
CBMs.
FloatCon™ operates on a fixed price subscription model delivering extreme value
for tracking and repair.
The program includes visits carried out at least once annually during Between Well Maintenance or at another suitable time.
Visits are followed by Detailed Condition Assessment Reports, proposed repair
schedules, guidance to subsea personnel and engagement with shore-based asset
management.
Our Engineers engage at set monthly or quarterly intervals throughout the year with Rig Subsea Engineers. Cracked or crumbling elements are scheduled for immediate repair on the rig or at a local shore base and there is a very low critical mass for mobilisation.
BENEFITS:
� Avoid utilising damaged buoyancy which presents a risk of harm to people and equipment
� Avoid relegation of riser joints with damaged fitments
� Rig Subsea Personnel will report detected defects at any time
� Drill Riser Buoyancy Modules are a 20 year investment. For buoyancy to reach this life span requires prompt attention to damage
� Avoid minor damage (such as damaged leading edges) leading to material deterioration and water ingress
BENEFITS:
� Avoid utilising damaged buoyancy which presents a risk of harm to people and equipment
� Avoid relegation of riser joints with damaged fitments
� Rig Subsea Personnel will report detected defects at any time
� Drill Riser Buoyancy Modules are a 20 year investment. For buoyancy to reach this life span requires prompt attention to damage
� Avoid minor damage (such as damaged leading edges) leading to material deterioration and water ingress
South AfricaNamibiaAngola
Ghana
Senegal
Mauritania
Canary Islands
SpainCyprus
India
SingaporeIndonesia
Japan
Australia
ProFloat is capable of delivering our industry-leading buoyancy support services at a multitude of locations worldwide, including:
06KEY LOCATIONS
Japan
Australia
Address: ProFloat, Sycamore Park, Atlas Gardens,
Cape Town, South Africa, 7550
Postal: Postnet Suite 61, Private Bag X10,
Cape Town, South Africa, 7506
Phone: +27 21 556 1631
Email: info@profloat.com
Reg Nr: 2012/195682/07
www.profloat.com
K E A N E H A R V E YM A N A G I N G D I R E C T O R
Phone: +27 82 884 8506 Email: keane@profloat.com
P H I L I P L O U WP R O J E C T E N G I N E E R
Phone: +27 82 823 8830Email: philip@profloat.com