thank you for standing by… the conference will begin shortly

Post on 10-Jan-2016

46 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

Thank you for Standing By… The Conference Will Begin Shortly Please remember to dial-in: 1-866-740-1260 and Enter Access Code: 3253705 Access code is the same for both the webinar and conference call Need Help? Call Ready Talk Support: 800-843-9166. Web Conference Instructions. - PowerPoint PPT Presentation

TRANSCRIPT

Thank you for Standing By…The Conference Will Begin Shortly

Please remember to dial-in: 1-866-740-1260 and Enter Access Code: 3253705

Access code is the same for both the webinar and conference call

Need Help? Call Ready Talk Support: 800-843-9166

Web Conference Instructions

During the presentation all lines will be muted.

Questions will be taken through the on-line system.

Agenda

ARRA Overview

Compliance with Recovery Act

Reporting Requirements

Calculating Jobs Data

Q&A

Recovery Act Purpose

Recovery Act PurposeThe American Recovery & Reinvestment Act/VAWA STOP (ARRA or Recovery Act) was created to:

• Preserve and create jobs and promote economic recovery;

• Assist those most impacted by the recession;

• Provide investments needed to increase economic efficiency by spurring technological advances in science and health;

• Invest in transportation, environmental protection, and other infrastructure that will provide long-term economic benefits; and

• Stabilize state and local government budgets, in order to minimize and avoid reductions in essential services and counterproductive stateand local tax increases.

Compliance with Recovery Act

Compliance with the Recovery Act

Projects supported under the Recovery Act must adhere to the primary principles of this Act:

1) creation of jobs,

2) preservation of jobs, and

3) promotion of economic growth.

Providers must ensure that these elements are factors in the selection and review process and ensure that each project funded will address how their project will provide meaningful and measurable outcomes for achieving job creation and preservation.

Compliance with the Recovery Act

Unallowable Activities

Grant funds under the Recovery Act Program may not be used for any unauthorized purposes, including but not limited to the following activities:

Lobbying,

Fundraising,

Research projects,

Building Renovations.

Compliance with the Recovery Act

Unallowable Activities

Providers are strongly discouraged from requesting consultant rates in excess of $450 per day

Providers may not allocate any funds for building renovations. This includes seemingly minor activities such as painting or carpeting.

Providers may not allocate any funds to purchase vehicles.

Providers may not allocate more than 10% of their budgets for administrative funds.

Providers may not use any ARRA funds for conducting research.

Compliance with the Recovery Act

Non-supplanting

Federal funds must be used to supplement existing State

and local funds for program activities and must not replace

those funds that have been appropriated for the same

purpose.

Compliance with the Recovery Act

Separate Tracking and Reporting of Recovery Act Funds and Outcomes

Consistent with the special purposes and goals of the Recovery Act, and its strong emphasis on accountability and transparency, it is essential that all funds from a Recovery Act grant be tracked, accounted for, and reported on separately from all other funds (including DOJ grant funds from Recovery-Act grants or non-Recovery-Act grants awarded for the same or similar purposes or programs). Recipients must also be prepared to track and report on the specific outcomes and benefits attributable to use of Recovery Act funds.

The accounting systems of all subrecipients must ensure funds from any award under this Recovery Act solicitation are not commingled with funds from any other source.

Misuse of grant funds may result in a range of penalties, including suspension of current and future funds, suspension or debarment from federal grants, recoupment of monies provided under a grant, and civil and/or criminal penalties.

Compliance with the Recovery Act

Accounting systems must be used to track each Recovery Act award.

The automated accounting system must be used to create new codes for Recovery Act funded programs and identify all Recovery Act transactions with the new codes.

If a position is funded partially with Recovery Act funds, the Recovery Act and non-Recovery Act hours must be tracked separately.

Compliance with the Recovery Act

Additional Requirements:

Civil Rights Compliance

Anti-Lobbying

Financial and Government Audit Requirements

Criminal penalty for false statements

Compliance with OJP financial guide

Supporting Documentation Providers must maintain auditable documentation supporting all reported data,

including jobs data. Documentation should provide evidence that

1) Created/retained positions and overtime hours are funded by Recovery Act awards,

2) Personnel are directly supporting Recovery Act projects and activities, and

3) Positions meet the criteria for “created”/”retained” positions and overtime hours.

Recommended Documentation

Created Jobs Retained Jobs Created Jobs Retained Jobs Created Jobs Retained Jobs

• Old and new

organizational charts

• New position

descriptions

• Job postings, offer

letters and

acceptance forms

• Staffing lists

• Timecards and payroll

records

• Budget comparisons and/or

projections before and after the

Recovery Act award date

• Formal layoff recommendations

and retractions (memos, reports)

• Minutes of formal meetings where

official budget decisions are made

• Timecards and payroll records

• Employee activity reports

Timecards and payroll

records

• Employee activity

reports

Questions

ARRA Reporting

Reporting BasicsUnder this Recovery Act program programmatic reporting will be required and will be due within 3 calendar days

after the end of each calendar quarter, starting October 3, 2009.

The initial Section 1512(c) report includes activity from the project start date to September 30, 2009. The first report is due by October 3, 2009.

The Quarterly Project Performance reports must be submitted via email to Contract_Manager@fcadv.org no later than the third day of the month following the end of each quarter. If the 3rd falls on a weekend, the report is due the preceding Friday.

Programmatic Reporting Periods Due Dates July-September October 3 October- December January 3 January- March April 3 April-June July 3

**Please note that the quarterly financial reports are due to FCADV based on thesubmission date as required by contract or agreement.

Questions

Calculating Job Data

Calculating Job Data

Section 1512(c) requires subrecipients to report on the total number of

jobs “created” or “retained” through Recovery Act funding, including:

Paid positions that are new or existing vacant positions that are filled as a result of Recovery Act funding;

Existing position for which recipients have documentation that the position would have been eliminated if not for Recovery Act funding;

Any position using Recovery Act Funding after a lay-off occurred.

Recovery Act-compensated overtime for created, retained, or existing positions.

Calculating Job DataFTEs: What counts?

Do Count

Hours worked by Recovery Act-funded new and retained employees:

Compensated employees working in the US or its “outlying areas.”

Employees of the subrecipient, including personnel hired through a 3rd party (e.g., staffing or temp agency)

Paid leave (PTO, vacation/sick leave, etc.)

Recovery Act-funded overtime for created, retained or other positions Hours worked on or after the award date.

Calculating Job Data

FTEs: What counts?

Don’t Count

Existing Positions: Standard hours for existing positions funded with Recovery Act dollars that do not meet the criteria for “created” or “retained.”

Support Positions: Positions that are not directly funded by the Recovery Act but are necessary to support the corresponding increase in activity (e.g., accounting or HR staff funded through indirect)

Indirect/Induced Jobs: Retail transactions and contracts with service providers that do not require dedicated personnel or single purchases of less than $500,000 from an individual manufacturer or supplier.

Calculating Job DataHow do I report Recovery Act-funded created andretained jobs?

Jobs should be reported as “Full-Time Equivalents” (FTE).

An FTE is calculated as the total hours worked in jobs created or retained jobs divided by the number of hours in a full-time schedule.

Example:If full-time employment at Recipient Agency A equals 520hours for the first reporting period, then 1 FTE = 520 hrsfor reporting period 1

Calculating Job DataAgency A

Award Date:July 1, 2009

Days Worked

(A)

Hours Per Day

(B)

Subtotal

(C=AxB)

Overtime

(D)

Total

(C+D)

FTEs

FTE for Agency A 65 8 520 0 520

Position 1 65 8 520 0 520

Position 2 65 4 260 0 260

Position 3 65 8 520 0 520

Total for Agency A

1300 1300/520

2.5 FTEs

Questions

Adjournment

If at anytime you have questions or concerns please contact us directly using the following:

Contract_manager@fcadv.org

FCADV425 Office Plaza Dr.Tallahassee, FL 32301(850)425-2749

top related