Terminator
TM ZE-B Beacon
LED End of Circuit Light KitINSTALLATION PROCEDURES
Kit Contents
Tools Required
Receiving, Storing and Handling 1. Inspect materials for damage incurred during shipping.2. Reportdamagestothecarrierforsettlement.3. Identifypartsagainstthepackinglisttoensurethepropertypeand
quantityhasbeenreceived.4. Storeinadrylocation.
Installation Precautions • Tominimizethepotentialforarcingandfirecausedbyproductdamage
orimproperinstallationuseground-faultprotection.• InstallationmustcomplywithThermonrequirementsandbeinstalled
inaccordancewiththeapplicablenationalandlocalcodes.• Componentapprovalsandperformanceratingsarebasedontheuse
ofThermonspecifiedpartsonly.• De-energizeallpowersourcesbeforeopeningenclosure.• Keependsofheatingcableandkitcomponentsdrybeforeandduring
installation.• Individualsinstallingtheseproductsareresponsibleforcomplyingwith
allapplicablesafetyandhealthguidelines.Properpersonalprotectiveequipment,orPPE, shouldbeutilizedduring installation.ContactThermonifyouhaveanyadditionalquestions
The Specific Conditions of Use are:1.ThekitsareintendedforusewithFMApprovedBSX,HTSX,KSX,RSX,
TSX,VSX-HT,HPT,andFPheattracingcables.2.Theequipmentcanonlybeusedinareasoflowimpactrisk.3.Avoidelectrostaticcharge.Cleanonlywithadampcloth.4.Themaximumoperatingvoltagerating is limitedto275VACwhen
wiringisdoneusingtheterminalblockoption5.MinimuminstallationTemperatureforterminatorsthatusethewei-
dmullerterminalsis-50°C.
TerminatorTM ZE-B Beacon
Item Quantity Description
1 1
ExpediterAssembly Grommet Compressor Grommet SupportBasewithO-Ring
2 1 LightModuleCover
3 1 BandingGuide
4 1 Banding
5 1 LED Light Module
Order Separately SCTK Connection Termination Kits (per cable)SCTK-1 forBSX,RSX,VSX-HT
SCTK-2 forKSX,HTSX
SCTK-3 forFP,HPT
Item Quantity Description
1 3 SpliceConnectionBoots
2 2 Small Crimps
3 1 Large Crimp
4 2 Small Crimp Insulators
5 2 Silicone Caps
6 3 GroundSleeves(notusedwithZE-BKits)
7 1 RTVTube
8 1 GRW-G(FPandHPTonly)
IP66/Type4X-60°C≤Ta≤+45°C,T6,T85°C -60°C≤Ta≤+55°C,T5,T85°COrdinary&HazardousLocationsClassI,Division2,GroupsA,B,C,&D,T6...T5ClassII,Division2,GroupsF&G,ClassIIIClassI,Zone1,AExebmbIICT6...T5,Gb 09.2238691,-G,-S,ExebmbIICT6...T5,GbZone21AExtbIIICT85°C,Db FMG18.0026XExebmbIICT6...T5,GbExtbIIICT85°C,Db
Certifications/Approvals
Note: CrimpTool-Ideal30-429orfactoryapprovedalternate.
1725II2GDExebmbIICT6...T5,GbExtbIIICT85°C,DbFM18ATEX0065X
Dimensions
210mm (8.25")
76mm (3")
89mm (3.5")
64 mm (2.5")
1 2
4
3 5
2 43 5 61 7 8
Order Separately SCTK Terminal Block Connection Kits (per cable)SCTK-1TB forBSX,RSX,VSX-HT
SCTK-2TB forKSX,HTSX
SCTK-3TB forFP,HPT
Item Quantity Description
1 1 TerminalBlock
2 1 TerminalBlockMountingScrew
3 1 SpliceConnectionBoot
4 1 RTVTube
5 1 GRW-GGrommet(SCTK-3TBonly)
2 43 51
1. Locatebusconnection(HPTandFPonly)andcableasshown.Cutendofcableatangletoaidinpiercinggrommet.Leaveadditionalcableforexpansion loop.
3. Slideexpediter towardpipeand route cablethroughsupportbaseentry.
4. Insertbandingguide intoexpediterandsnapinto place.
5. Mountexpeditertopipeusingpipeband.Donotbandovercable.
2. Insert cable into expediter. If mountedon bottom of pipe, punch outweep hole. Note:ForHPTandFPcable,exchangegrommetinTerminatorwithGRW-GprovidedinPETK-3.
6. Cutoffendofcable.
7. Terminate cable with appropriate SCTKtermination kit. Refer to SCTK installationinstructions.Pushexcess cableback throughexpediter. Remove braid pigtail. Tape cableexpansion loop to pipe.
50mm (2")
Max.
300mm (12")
Bus Connection
Weep Hole
101mm (4")Min.
25mm (1")Min.
Expediter Assembly
Boot
Wire Crimp
HeatingCable
Light Module
Light Module Wiring
Wiring Schematic for LED Light
LEDLightPigtailHeatingCable
8. When using wire crimp: Connect heating cable to light module wires using smallcrimps. Discard large crimp. See steps 8–11. When using terminal block: See steps 12–14. Seewiringschematicforconnectiondetails.
Expediter
INSTALLATION PROCEDURES
DoNotBandOverCable
CorporateHeadquarters:100ThermonDr•POBox609SanMarcos,TX78667-0609•Phone:512-396-5801•1-800-820-4328 FortheThermonofficenearestyouvisitusat...www.thermon.com
©Thermon,Inc.•PrintedinU.S.A.•Informationsubjecttochange.FormNo.PN50844-0918
16. To remove cap, de-energize circuit, lift latchmechanism,andunscrewcap.
15. Engage threads. Rotate lightmodule coverclockwiseandtightencapsecurely.Makesurelatchmechanismisinthelockedposition.
11. Arrangecrimpedleadstofitinsidelightmodulebase. Slide the lightmodule coverover lightmodule.
Light ModuleCover
Lens
Expediter Assembly
Light Module
9. Snap on crimp insulators.
Light Module
Expediter Assembly
Crimp Insulators
10. Slidesiliconecapsovercrimpinsulators.InstallLight Module to Expediter.
Silicone Cap
TerminatorTM ZE-B Beacon INSTALLATION PROCEDURES
LockedPosition
UnlockedPosition
14. Connectthebuswiresof thetraceheater totheterminalblock.
13. Use the terminal blockmounting screw tomountterminalblocktotheLEDlightmodule.Bendeachpigtailleadaroundthesidesoftheterminalblock.
12. WhenusingSCTK-TBConnectionKit,firsttrimexposedbuswiresoftheLEDpigtailto8mm(.32"),thenconnecttotheterminalblock.
8mm(.32")