SWITCHGEARS
Table of Contents
Introduction .......................................................................................................... 3
1. Main switchgears ............................................................................................... 4
2. Ventilation switchgears ....................................................................................... 6
3. Distribution switchgears ..................................................................................... 7
4. Control switchgears / starters ............................................................................. 9
5. Automation switchgears.....................................................................................12
Strona 3 z 14
Introduction
More than 20 years of experience
Our company boasts more than 20 years of experience in designing and constructing
control systems. Design, construction, installation, startup and maintenance -
comprehensive „turnkey” solutions for all projects. Offering high quality and professional
service over the years, we have earned a large group of satisfied clients.
In-house production hall and design office
All designs developed by our design office are put into life by our in-house production hall.
We are also capable of completing every project based on technical documentation supplied
by the client.
For land and offshore industries
Many completed projects for the civil engineering and offshore industries:
• main switchgears,
• ventilation switchgears,
• distribution switchgears,
• control switchgears / starters,
• automation switchgears
Complete projects can be verified by a classification society, e.g. DNV.
Strona 4 z 14
1. Main switchgears
Marco Polo (NB56) – France / Monaco
Design, construction, installation and startup of switchgears on the Marco Poli (NB 56) for
a French company. The Marco Polo Dock will build new land in the Principality of Monaco.
more information about the project:
https://an-elec.com/realizations/marco-polo-nb56
Strona 5 z 14
Trinto
Main switchgear with a PMS, installed during the refurbishment of the vessel in the Szczecin
yard. The ship was also equipped with auxiliary switchgears.
more information about the project:
https://an-elec.com/realizations/trinto
Strona 6 z 14
2. Ventilation switchgears
Stena Line
Ventilation switchgear for the passenger car deck. Acceptance performed by a classification
socjety.
Strona 7 z 14
3. Distribution switchgears
Mobile Pearl (Bontrup Pearl)
A vessel, for which we designed, constructed, installed and commissioned switchgears.
more information about the project:
https://an-elec.com/realizations/mobile-pearl-bontrup-pearl
Strona 8 z 14
Marco Polo (NB56)
In the Marco Polo Dock (NB 56) constructed in 2017, our company was responsible for
installing cable ducts and penetrations, the electrical installation, the control panel and
switchgears.
more information about the project:
https://an-elec.com/realizations/marco-polo-nb56
Strona 9 z 14
4. Control switchgears / starters
Starter pomp paliwa - Japan
The fuel pump starter switchgear for a Japanese client was accepted by a classification
society. Having applied significant optimizations, our company was able to build a
switchgear that was smaller by 2/3 compared to the original.
Strona 10 z 14
Elbląg Bridge
A 56 m long and 9 m wide drawbridge built in Elbląg. Our company was responsible for
designing and constructing the switchgear, developing an algorithm and programming the
PLC + HMI.
more information about the project:
https://an-elec.com/realizations/bridge-elblag
Strona 11 z 14
Warsaw
Design, construction and commissioning of switchgears on the m/v Warsaw vessel for SMT
Shipmanagement.
more information about the project:
https://an-elec.com/realizations/warsaw
Strona 12 z 14
5. Automation switchgears
Mobile Pearl (Bontrup Pearl)
A vessel, for which we designed, constructed, installed and commissioned switchgears.
more information about the project:
https://an-elec.com/realizations/mobile-pearl-bontrup-pearl
Strona 13 z 14
Przegalina Bridge
A bridge built in 2012 over a channel connecting River Vistula with its former riverbed -
Martwa Wisła. Our company was responsible for constructing, installing and commissioning
switchgears, developing a control algorithm and programming the PLC + HMI.
more information about the project:
https://an-elec.com/realizations/bridge-przegalina
Strona 14 z 14
Hutnicza 40 81-061 Gdynia, Poland
+48 58 668 44 00 +48 58 668 44 00