TRANSCRIPT

20112011--12 Facility Utilization Task Force12 Facility Utilization Task Force

Recommendation PackRecommendation Pack

20112011--12 Facility Utilization Task Force12 Facility Utilization Task Force

April 3, 2012April 3, 2012

ATS&R Planners/Architects/EngineersATS&R Planners/Architects/Engineers

The 2012 FUTF VIEWS

OPTION 4B-1:Grade Reconfiguration: PK-4 / 5-8 / 9-12

Place additions to Middle Schools

OPTION 2B: Maintain PK-5 / 6-8 / 9-12:

Place additions to Elementary Schools

OPTION 2B: Additional Options 2B-1,2B-2,2B-3 Studied

The 2012 FUTF VIEWS

1. OPTION 4B-1:Grade Reconfiguration: PK-4 / 5-8 / 9-12

Place additions to Middle Schools

RECOMMENDATIONOption 4B-1

$20M- $23 M

RECOMMENDATIONOption 2B-1

$23M- $27 M

RECOMMENDATIONOption 2B-2

$22M- $24.5 M

RECOMMENDATIONOption 2B-3

$20M- $23 M

RECOMMENDATIONCOST MODELS

top related