step 1: loading & unloading at large vehicle sites (royal
Post on 20-Dec-2021
3 Views
Preview:
TRANSCRIPT
Yes / No
Work Equipment
• All employees operating RM Material Handling Equipment (MHE) have been trained and authorised to do so with documented evidence.
• There is documented evidence that existing employees have completed manual handling training – see Content on Demand or Logistics specific training.
• Only suitably competent and authorised persons use specific equipment such as dock levellers, trailer doors, boom conveyors etc.
• All new employees have received an appropriate site induction including safe instructions for loading & unloading activity.
• There is documented evidence that the Unit Manager and sufficient deputies have been trained in ‘A Safe Place to Work’ (or equivalent) and PIC Essentials within the last 3 years.
• A Workplace Onsite Risk Assessment has been completed. All elements relevant to vehicle/person risk in the loading and unloading area have been reduced to a minimum of Moderate.
• The loading and unloading area has been defined on site to ensure risk is assessed by either the Workplace Onsite Risk Assessment or the Yard Risk Assessment and safety controls are clear.
• No individuals operate as a Yard Marshal or Banksman unless trained and authorised to do so. See guidance on Yard Marshals and Banksman.
ROYAL MAIL GROUP RISK MANAGEMENT
STEP 1: Loading & Unloading at Large Vehicle Sites (Royal Mail Operations) - Pre Assessment ControlsAll of the following Pre-Assessment Controls must be in place in order to validate the Task Risk Assessment. Use the drop down boxes on the right hand side to confirm
completion.
Risk Assessment
Workplace
• A Yard Risk Assessment has been completed and risks reduced to a minimum of Moderate.
• A Severe Weather Preparation Checklist is up to date and a comprehensive Severe Weather Risk Assessment is completed when appropriate.
• The SHE Noticeboard is up to date and compliant with Standard 4.3.
• Monthly Site Inspections take place and actions completed accordingly.
People
• The Driver Pack process is in place to identify hazards and risks offsite or Visiting/Third Party premises.
• All employees identified as a Person Specifically at Risk have been assessed with appropriate controls implemented with the support of occupational health where required.
• Where ground level access to Docks is required safe and suitable access/egress provided and compliance is enforced.
• The site has a suitable, enforced process in place to prevent vehicle drive away during loading/unloading including key control e.g. drivers hanging keys on the loading bay door.
• The controls for equipment (e.g. Dock Levellers, Loading Bay doors etc.) are situated in a safe area.
• Site/Yard Rules including loading bay instructions have been produced, displayed and communicated to staff and in a format suitable to visiting drivers.
• The site has a suitable, enforced process in place for controlling vehicle movement into/on to loading bays/designated areas.
Owner: J Cannon Date: Apr 2017Task Risk Assessment Template v3.0#Classified: RMG – Internal
Unit Manager (PIC) Name:
Date of confirmation
Confirmation of Pre-Assessment Controls
I confirm that all relevant Pre-Assessment Controls (as listed) are in place.Statement of confirmation
Unit
• There is documented evidence that footwear checks are regularly completed for staff.
• All vehicles, MHE, and equipment (e.g. Dock Levellers, Loading Bay Doors) are in good working order and maintained as part of a preventative maintenance programme and local inspection process.
• There is documented evidence that all employees have been issued with the appropriate PPE as identified in the RMG PPE Matrix e.g. Hi Viz clothing and a safety footwear if required.
Owner: J Cannon Date: Apr 2017Task Risk Assessment Template v3.0#Classified: RMG – Internal
Yes / No
11) Regular and targeted Manager SMAT / Observations (Yard and Vehicle) take place to correct unsafe acts / conditions.
1) The new Loading & Unloading (Royal Mail Operations) SSOW has been communicated to all staff with documented evidence and the content explained.
9) All staff understand the requirement to act safely and are empowered to make decisions based on risk (using the 'Look-Consider-Decide' method).
10) Arrangements to prevent falling from height, vehicle drive-away and reversing on to the Loading Bay have been re-assessed in conjunction with the site Safety Representative to make sure the risk is adequately controlled with improvement actions implemented where required.
2) The Loading & Unloading SSOW has been discussed at the Unit SHE Committee Meeting (or directly with a Union Representative).
3) The Loading & Unloading WTLL/Brief has been communicated to all relevant staff.
6) The Transportation of Yorks and RSCs SSOW has been communicated to all staff in the last 12 months with documented evidence and the content explained.
7) The Site/Yard Rules and any relevant loading bay instructions have been reviewed to ensure the communication of safe loading/unloading activity is sufficient, updated where necessary, and the current version communicated to all staff within the last 12 months with documented evidence.
8) Third Party/Visiting sites considered a significant risk for loading and unloading have been identified and suitable arrangements been put in place, including updating the vehicle Driver Pack, to reduce the risk to an acceptable level.
5) The Driving SSOW has been communicated to all staff in the last 12 months with documented evidence and the content explained.
4) The York SSOW and Manual Handling SSOW have been communicated to all staff in the last 12 months with documented evidence and the content explained.
ROYAL MAIL GROUP RISK MANAGEMENT
STEP 2: Loading Unloading at Large Vehicle Sites (Royal Mail Operations) - Additional ControlsAll of the following Controls must be in place in order to validate the Task Risk Assessment. Use the drop down boxes on the right hand side to confirm completion
Additional Controls
Confirmation of Controls
Date of Confirmation
Statement of confirmation I confirm that all relevant Pre-Assessment Controls (as listed) are in place.
Unit Unit Manager (PIC) Name:
Task Risk Assessment Template v3.0 Owner: J Cannon Date: Apr 2017
(L) L
'hoo
d
(S) S
ever
ity
( R) R
atin
g
(L) L
'hoo
d
(S) S
ever
ity
( R) R
atin
g
EI CV
2 3 6 2 2 4
EI OE CV2 3 6 1 3 3
EI OE CV2 4 8 1 4 4
EI OE CV2 5 10 1 5 5
EI OE OE2 2 4 2 1 2
EI CV2 3 6 1 3 3
EI CV2 3 6 1 3 3
EI OE CV2 3 6 1 3 3
ROYAL MAIL GROUP
STEP 3: Loading Unloading at Large Vehicle Sites (Royal Mail Operations) - Task Risk AssessmentThe following Task Risk Assessment must reflect the local Unit. Check all of the steps, hazards, risks and risk ratings before confirming that this is a true reflection of the local activity by saving
and submitting the file.
Unit / Site RMG Operations National Generic Risk Assessment Workplace Location Loading & Unloading Large Vehicles
Task Being Assessed Loading & Unloading Large Vehicles (Royal Mail Operations)
Assessment Team
Manager Safety Representative Other Contributors
James Cannon; Richard Lewis; Mark Griffin Karl Maginn; Mark Fuller Richard Low; Jay Dowd; Corinne Parsons
What ADDITIONAL CONTROLS are required?There may be more than
one
RESIDUAL Risk Rating
(LxS=R)
TASK ASSESSEDWhat are the HAZARDS associated with the task
activity?
What are the SIGNIFICANT RISKS associated with the
hazard.There may be more than one
Groups of people or individuals affected by this hazard?
What CURRENT CONTROLS are in place?
There may be more than one
CURRENT Risk Rating
(LxS=R)
1) Operating on Loading Dock/Loading & Unloading Area
Refer to the Unit Workplace Onsite Risk Assessment
Congestion/Moving Containers Impact/Strike; Musculoskeletal
Uneven/slippery surfaces Slip/Trip/Fall; Impact/Strike
Poor housekeeping Slip/Trip/Fall; Impact/StrikeSnow/Ice/Rain (surface) severe weather Slip/Trip/Fall; Impact/Strike
Work at height - Dock/Loading&Unloading Area
Fall from height; Slip/Trip/Fall; Impact/Strike from falling objects; musculoskeletal
Manual Handling - Yorks etc. Musculoskeletal
MHE/Pedestrian Mix Impact/Strike; Slip/Trip/Fall
Vehicle/pedestrian mix Impact/Strike; Slip/Trip/Fall
Additional Controls Competed
Pre-Assessment Controls Completed
EI2 2 4 2 1 2
EI CV2 4 8 1 4 4
EI OE CV2 5 10 1 5 5
EI2 4 8 1 4 4
EI2 3 6 1 3 3
EI2 4 8 1 4 4
EI CV1 3 3 1 3 3
EI2 2 4 2 2 4
EI2 3 6 1 3 3
EI2 3 6 1 3 3
EI2 3 6 1 3 3
EI2 2 4 2 1 2
EI2 2 4 2 1 2
EI2 5 10 1 5 5
EI2 3 6 1 3 3
EI2 3 6 1 3 3
EI2 2 4 2 2 4
EI2 3 6 1 3 3
EI2 3 6 1 3 3
EI2 3 6 1 3 3
Injuries suffered during lone/isolated working Worsening of injury/condition
Refer also to the Unit Yard Risk Assessment EI
2) Operating on Loading Dock/Distribution Hall (Third Party Sites)
Refer to the Site Rules EI
Refer also to the Workplace Offsite Risk Assessment (WRAP) where risks are identified.
MHE/pedestrian mix Impact/Strike
Vehicle/pedestrian mix Impact/Strike; Slip/Trip/FallWork at height - Dock/Loading&Unloading Area
Fall from height; Slip/Trip/Fall; Impact/Strike from falling objects
Manual Handling - Yorks, Trays etc. MusculoskeletalFall from height - (e.g. bridging plates) Slip/Trip/Fall; Impact/Strike
Falling objects Impact/Strike
Congestion/Moving Containers Impact/Strike; Musculoskeletal
Uneven/slippery surfaces Slip/Trip/Fall; Impact/Strike
Poor housekeeping Slip/Trip/Fall; Impact/StrikeSnow/Ice/Rain (surface) severe weather Slip/Trip/Fall; Impact/StrikeInjuries suffered during lone/isolated working Worsening of injury/condition
Refer also to the Unit Yard Risk Assessment EI
3) Working in and around vehicles on RM Premises
Refer to the Unit Workplace Onsite Risk Assessment EI
Refer also to the Unit Yard Risk Assessment
Refer also to the Driving Task Risk AssessmentInjuries suffered during lone/isolated working Worsening of injury/condition
4) Working in and around vehicles at Third Party/Visiting Sites
Refer to the Driving Task Risk Assessment EI
Refer to the relevant Site Rules
Vehicle/pedestrian mix Impact/Strike; Musculoskeletal
MHE/pedestrian mix Impact/Strike
Manual Handling - Yorks Musculoskeletal
Congestion/Moving Containers Impact/Strike; Musculoskeletal
Falling objects Impact/Strike
Uneven/slippery surfaces Slip/Trip/Fall; Impact/Strike
Poor housekeeping Slip/Trip/Fall; Impact/Strike
EI2 3 6 1 3 3
EI2 2 4 2 1 2
OE TP2 5 10 1 5 5
OE TP2 2 4 2 1 2
OE TP2 4 8 1 3 3
OE TP2 1 2 2 1 2
OE TP2 3 6 1 3 3
OE TP2 4 8 1 3 3
OE TP2 4 8 1 4 4
EI TP2 2 4 2 1 2
EI OE TP2 5 10 1 5 5
EI OE TP2 2 4 2 1 2
EI OE TP2 4 8 1 3 3
EI OE TP3 1 3 3 1 3
EI OE TP2 3 6 1 3 3
EI OE TP2 4 8 1 3 3
EI OE TP2 3 6 1 3 3
EI2 2 4 2 1 2
EI2 3 6 2 2 4
EI2 4 8 1 4 4
EI2 3 6 1 3 3
Snow/Ice/Rain (surface) severe weather Slip/Trip/Fall; Impact/StrikeInjuries suffered during lone/isolated working Worsening of injury/condition
5) Reversing into Loading Bay on RM Site
Refer to the Unit Workplace Onsite Risk Assessment
Refer to the Unit Yard Risk Assessment
Refer also to the Delivery Task Risk Assessment (where relevant)
Vehicle/pedestrian mix Impact/Strike
Other vehicles/Objects Impact/Strike; Musculoskeletal
Poor lighting or visibility Impact/Strike; Musculoskeletal
Uneven surfaces Impact/Strike; MusculoskeletalSnow / Ice / Rain (surface) - Severe Weather Impact/Strike; Musculoskeletal
Glare from sun Impact/Strike; MusculoskeletalHitting Loading Bay / Bay Doors Impact/StrikeInjuries suffered during lone/isolated working Worsening of injury/condition
6) Reversing into Loading Bay/Area on a Third Party /Visiting Site or Public Area
Vehicle/pedestrian mix Impact/Strike; Musculoskeletal
Other vehicles/Objects Impact/Strike; Musculoskeletal
Poor lighting or visibility Impact/Strike; Musculoskeletal
Uneven surfaces Impact/Strike; MusculoskeletalSnow / Ice / Rain (surface) - Severe Weather Impact/Strike; Musculoskeletal
Glare from sun Impact/Strike; MusculoskeletalHitting Loading Bay / Bay Doors Impact/StrikeInjuries suffered during lone/isolated working Worsening of injury/condition
Refer also to the Driving Task Risk Assessment
Refer also to Site Rules
Refer also to the Collection Task Risk Assessment (where relevant)
Refer also to the Delivery Task Risk Assessment (where relevant)
Refer also to the Workplace Offsite Risk Assessment (WRAP) where risks are identified.
7) Preparing the Vehicle for Loading / Unloading Inc. Access and Egress
Refer to Sections 1-4
Work at height - Dock/Loading&Unloading Area
Fall from height; Slip/Trip/Fall; Impact/Strike from falling objects
Access/Egress Trailer bed from ground
Fall from height; Slip/Trip/Fall; Impact/Strike from falling objects
Opening Vehicle Shutter Doors from ground
Impact/Strike; Musculoskeletal; Slip/Trip/Fall
EI
2 3 6 2 2 4
EI2 3 6 1 3 3
EI2 3 6 1 3 3
EI2 3 6 1 3 3
EI2 2 4 2 1 2
EI2 3 6 1 3 3
EI2 3 6 1 3 3
EI2 3 6 2 2 4
1 3 3 1 3 3
EI2 4 8 1 4 4
2 2 4 2 2 4
2 3 6 1 3 3
EI2 3 6 1 3 3
EI2 3 6 2 2 4
EI1 3 3 1 3 3
EI2 3 6 1 3 3
EI1 4 4 1 4 4
EI2 2 4 1 2 2
EI OE2 3 6 1 3 3
to TrailersOpening Vehicle Shutter Doors from Loading Bay
Impact/Strike from falling objects; Musculoskeletal; Slip/Trip/Fall; Fall from height; Trapping
Opening Barn Doors from ground
Impact/Strike from falling objects; Musculoskeletal; Slip/Trip/Fall
Opening Curtain Sided Trailers - Manual Handling
Impact/Strike from falling objects; Musculoskeletal; Slip/Trip/Fall
Faulty doors/equipment Musculoskeletal
Trailer Straps Impact/Strike; Cuts/bruisesUneven surfaces/Dock Leveller edge Slip/Trip/Fall
Severe weather - wind - doorsImpact/Strike; Musculoskeletal; Slip/Trip/Fall
Refer also the Unit Yard Risk Assessment (where relevant)
Refer also to the Workplace Onsite Risk Assessment (where relevant)Refer also to the Workplace Offsite Risk Assessment (where relevant and risks are identified)
Refer also to Site Rules
Refer also to relevant vehicle Loading Plans
8) Operation and Use of a Dock Leveller (N/A for sites without a Dock leveller)
Refer to Sections 1-2
Work at height - Dock/Loading&Unloading Area
Fall from height; Slip/Trip/Fall; Impact/Strike from falling objects
Dock Leveller controls Electric shock
Dock leveller plate movement Crushing; STFVehicle /Dock Leveller creep age Slip/Trip/FallUneven surfaces / Dock Leveller edge Slip/Trip/FallSlopes (man handling of Yorks) Musculoskeletal; Slip/Trip/Fall
Refer also to Operator Instructions
9) Operation and Use of a Loading Bay Doors (N/A for sites without Loading Bay Doors)
Refer to Sections 1-2
Work at height - Dock/Loading&Unloading Area
Fall from height; Slip/Trip/Fall; Impact/Strike from falling objects
Bay Door Leveller controls Electric shock
Moving Door Impact/Strike/Trapping
Falling door Impact/Strike/Trapping
Damaged door Impact/Strike; cuts and bruises
Refer also to Operator Instructions
10) Loading & Unloading Large Vehicles with
Refer to Sections 1-2
Pushing full Yorks (manual handling)
Impact/Strike; Musculoskeletal; Slip/Trip/Fall
EI OE2 3 6 1 3 3
EI CV
2 3 6 2 2 4
EI OE CV2 4 8 1 4 4
EI OE CV2 5 10 1 5 5
EI OE OE2 2 4 2 1 2
EI CV2 3 6 1 3 3
EI OE3 2 6 2 2 4
EI OE2 2 4 2 1 2
EI OE2 2 4 2 1 2
EI OE2 3 6 1 3 3
EI OE CV2 3 6 1 3 3
EI2 2 4 2 1 2
EI OE2 3 6 1 3 3
EI OE2 3 6 1 3 3
EI CV
2 3 6 2 2 4
EI1 3 3 1 3 3
EI OE CV2 4 8 1 4 4
OE2 4 8 1 4 4
EI OE CV2 5 10 1 5 5
EI2 3 6 1 3 3
EI OE OE2 2 4 2 1 2
EI CV2 3 6 1 3 3
Vehicles with Yorks on Loading Bay
Pushing/pulling nested/empty Yorks (Manual Handling)
Impact/Strike; Musculoskeletal; Slip/Trip/Fall
Work at height - Dock/Loading&Unloading Area
Fall from height; Slip/Trip/Fall; Impact/Strike from falling objects; musculoskeletal
MHE/Pedestrian Mix Impact/Strike; Slip/Trip/Fall
Vehicle/pedestrian mix Impact/Strike; Slip/Trip/Fall
Congestion/Moving Containers Impact/Strike; Musculoskeletal
Uneven/slippery surfaces Slip/Trip/Fall; Impact/Strike
Dock Leveller surface/incline Slip/Trip/Fall
Dock/Bay slopes and inclines Musculoskeletal; Slip/Trip/Fall
Trailer Straps Impact/Strike; Cuts/bruises
Housekeeping Slip/Trip/FallsSnow/Ice/Rain (surface) severe weather Slip/Trip/Fall; Impact/StrikeInjuries suffered during lone/isolated working Worsening of injury/condition
Refer to the Workplace Onsite Risk Assessment (where relevant)
Refer to the Workplace Offsite Risk Assessment (where relevant and risks are identified)
Refer also to relevant vehicle Loading Plans
Refer also to Transport of Yorks and RSCs SSOW
Refer also to Site Rules
11) Loading and Unloading of Tail Lift Vehicles
Refer to Sections 1-4
Refer to Sections 10
Pushing full Yorks (manual handling)
Impact/Strike; Musculoskeletal; Slip/Trip/Fall
Pushing/pulling nested (Manual Handling)
Impact/Strike; Musculoskeletal; Slip/Trip/Fall
Work at height - Tail Lift
Fall from height; Slip/Trip/Fall; Impact/Strike from falling objects; musculoskeletal
Tail Lift controls Electric shock
Moving Platform Impact/Strike; Slip/Trip/Fall
Loaded Platform (containers) Impact/Strike
Vehicle/pedestrian mix Impact/Strike; Slip/Trip/Fall
Tail Lift York Stop Slip/Trip/Fall; Fall from height
Congestion/Moving Containers Impact/Strike; Musculoskeletal
Uneven/slippery surfaces Slip/Trip/Fall; Impact/Strike
EI OE2 2 4 2 1 2
EI OE2 3 6 1 3 3
EI OE CV2 3 6 1 3 3
EI2 2 4 2 1 2
OE TP2 4 8 1 4 4
EI OE2 4 8 1 4 4
EI OE2 4 8 1 4 4
EI OE2 2 4 2 1 2
EI OE2 2 4 2 1 2
EI OE2 2 4 2 1 2
Trailer Straps Impact/Strike; Cuts/bruises
Housekeeping Slip/Trip/FallsSnow/Ice/Rain (surface) severe weather Slip/Trip/Fall; Impact/StrikeInjuries suffered during lone/isolated working Worsening of injury/condition
Refer to the Unit Yard Risk Assessment
Refer to the Workplace Onsite Risk Assessment (where relevant)
Refer also to Site Rules
Refer also to Transport of Yorks and RSCs SSOW
Refer also to relevant vehicle Loading Plans
MHE/pedestrian mix Impact/Strike
MHE on trailersFall from height; Slip/Trip/Fall; Impact/Strike from falling objects
Falling RSC/Pallet Impact/Strike
Faulty Equipment Impact/Strike
Uneven surfaces/slopes Impact/Strike
Trailer Straps Impact/Strike; Cuts/bruises
Refer to the Workplace Onsite Risk Assessment (where relevant)
Refer also to the Workplace Offsite Risk Assessment (where relevant and risks are identified)
Refer also to relevant vehicle Loading Plans
Refer to the Unit Yard Risk Assessment
13) Loading and Unloading of Double Deck Trailers
Refer to Sections 1-2
Refer to Section 10
Refer also to the specific Double Deck Trailer SSOW
Refer to the Workplace Onsite Risk Assessment (where relevant)
Refer also to the Workplace Offsite Risk Assessment (where relevant and risks are identified)
12) Loading and Unloading Large Vehicles with RSCs/Pallets
Refer to Sections 1-4
14) Loose Loading / U l di
Refer to Sections 1-2
Refer also to Site Rules
Refer also to relevant vehicle Loading Plans
Refer also to Transport of Yorks and RSCs SSOW
Refer also to Transport of Yorks and RSCs SSOW
EI OE TP2 4 8 2 2 4
EI2 3 6 1 3 3
EI2 3 6 1 3 3
EI OE TP2 5 10 1 5 5
Persons Affected by the HazardEI = Employee involved in task OE = Other Employee CV = Contractor or visitor MOP = Member of Public
RISK ASSESSMENT SIGN OFF
Name of Risk Assessor(s) James Cannon; Richard Lewis; Mark Griffin Review date: Name
Risk Assessor(s) Signature James Cannon; Richard Lewis; Mark GriffinDate completed 01/03/2018
Local confirmation of a nationally produced generic Task Risk Assessment (where applicable)
/ Unloading -Additional Instruction
Refer also to relevant vehicle Loading Plans
Refer also to Transport of Yorks and RSCs SSOW
Refer also to Site Rules
Refer to the Site Rules
Impact/StrikeCoupling vehicle and trailer airlines Fall from height, Slip/Trip/Fall
Raising Trailer Legs Musculoskeletal; Slip/Trip/Fall
Connecting Unit Impact/Strike
Refer also to the Driving Task Risk Assessment
16) Person
Physical characteristic
Increased risk:• Task performed more difficult• Existing condition make worse by task• Fatigue
Medical History / Condition
History of medical issues or known condition.
Mental healthPsycho-social risks including stress, anxiety and depression
15) Large Vehicles Leaving the Dock
Refer to Sections 3-4
Loading Bay Drive away
Refer to the Unit Workplace Onsite Risk Assessment (where relevant)
Refer also to the Unit Yard Risk Assessment (where relevant)
Refer to specific equipment task risk assessment / SAC1
Refer to specific equipment SSOW
Refer to the Workplace Onsite Risk Assessment
Statement of confirmation I confirm that I have reviewed the above nationally produced generic Task Risk Assessment and that it replicates the hazards, levels of risk and necessary control measures in place at the named Unit and as such it is deemed that local amendments are not required. (NOTE: Where the local task is significantly different from the nationally produced generic Task Risk Assessment the Unit Manager is responsible for ensuring a local version is produced.)
Confirmation of risk assessment accuracy - assuming review requirements as per SHEMS
Standard.Master copies of a nationally produced generic Task Risk Assessment are held on the SHE Knowledge
Database. Printed copies may not match the current version).
Unit
Unit Manager (PIC) Name:
Date of confirmation:
Likelihood of injury/incident
No history or any indication of future incidents but cannot be ruled out Improbable 1 1 2 3 4 5Some history but over a long period of time and in very small numbers Remote 2 2 4 6 8 10Historical evidence indicates occurrence at least monthly Foreseeable 3 3 6 9 12 15Historical evidence indicates occurance at least weekly Probable 4 4 8 12 16 20Historical evidence indicates occurrence throughout the day Likely 5 5 10 15 20 25
1 2 3 4 5 SEVERITY (consequence of injury/incident)
Superficial injury/ damage
Moderate injury/ damage
Significant injury/ damage
Serious injury/damage
Fatality/ catastrophic
damageMinor injury or ill health
(laceration/bruising/swelling) causing no absence
from work.
Damage resulting in low cost repair
Injuries or ill health resulting in absence from work (of less than 7 day ).
Damage causing temporary disruption to operations of around an
hour
Major injury or ill health, temporary physical
disability resulting in absence from work (of
more than 7 days)
Damage causing significant disruption to or cessation of operations of
around one day
Permanent physical & health disability.
Damage causing long term termination of operations
for more than one day
Premature death.
Complete destruction of property and permanent termination/relocation of operations until rebuild
completed
Risk Level Risk RatingSuggested
Minimum Controls
Adequately controlled 1- 3 Visual Aids
Tolerable 4 - 5 Safe Working
Instructions plus Visual Aids
Substantial 15-16Prevent task until
suitably controlled by task redesign or similar
Intolerable 20 - 25Prevent task, look for alternative solutions. Invoke permit to work
system
Task should be prohibited until the risk has been reduced. Resources may have to be allocated to redesign the task in order to reduce the risk. Where the task is already in progress, it should be stopped
when it is safe to do so. These two bands usually fall outside the normal day to day risk assessment and ought to be reserved for concurrence processes
Task should be prohibited. If it is not possible to reduce the risk, even with unlimited resources, the work has to remain prohibited. Alternative solutions should be found that avoid the need to complete the
origional task.
Some additional controls would be beneficial to further reduce the risk. Consideration may be given to a more cost-effective solution or improvement that imposes no additional cost burden. Monitoring is
required to ensure that the controls are maintained.
Moderate
Efforts should be made to reduce the risk, although the costs of prevention should be carefully measured within a cost/benefit analysis to ensure the control is appropriate. Risk reduction measures
should be implemented within a defined time period. Where the risk level is associated with Serious and Significant Injuries consequences, further task assessment and/or task redesign may be necessary to
achieve suitable control measures.
6 - 12 SSOW plus Visual Aids
ROYAL MAIL GROUP RISK MANAGEMENT
RISK MATRIX
Control action and timescale (nominally from BS8800)No additional control measures required. Current controls suitable and sufficient to reduce the risk to
adequately controlled. Good practice would be to record the assessment and share findings with operators