february · statica project engineering 100. yıl mah. 1506. cad rüya apt. no:22/4 – Çankaya 18...
Post on 22-Oct-2020
7 Views
Preview:
TRANSCRIPT
-
Statica Project Engineering
100. Yıl Mah. 1506. Cad Rüya Apt. No:22/4 – Çankaya 18 February 2013
Ankara / Turkey Page 1 of 2
Tel :+90(312) 285 76 11 – 285 73 23 – 285 73 53
Fax :+90(312) 285 72 11
www.staticaproje.com
February18,2013
Attentiontowhomitmayconcern,
Statica Project Engineering was established as an engineering and consultancycompany in Ankara at 2008. Statica has gained lots of experience and know‐howwhileserving inmanydifferent typesofengineeringandconsultancyprojectsincethen. The main target to be achieved is to be one of the leading companies inengineeringsectorbothathomeandabroad.Statica Project Engineering has a great capability and capacity to design manytypesofengineeringstructureashispastperformanceinhugeprojectshowedso.Hegainedthetrustofallbigconstructioncompaniesallovertheworldbyhistoolsandpersonnelwhichhavebeenbroughttogethertosucceedinallengineeringdutiesandhiscommandonalluniversalstandardsandspecifications.ThemaingoalofStaticaistosubmitaccurateandreliableprojectswitheconomybeingconsideredtogether.StaticaProjectEngineeringisleadingamulti‐disciplinedteaminordertoserveallengineering projects. Apart from his own civil and structural functions, under hisumbrella, architectural, electrical, mechanical, plumbing, fire protection andcommunicationserviceshavebeenbeingprovidedtoclients.Hehasthecapacitytocomplete all projects that he is contracted from scratch to the final. The workcompletioncertificatesarehisbiggestreferences.
-
Statica Project Engineering
100. Yıl Mah. 1506. Cad Rüya Apt. No:22/4 – Çankaya 18 February 2013
Ankara / Turkey Page 2 of 2
Tel :+90(312) 285 76 11 – 285 73 23 – 285 73 53
Fax :+90(312) 285 72 11
www.staticaproje.com
StaticaProjectEngineeringwithhisvaluablepersonnelhasbeenbeinginvolvedinmany infrastructure and superstructure projects in the Airports of developingcountriesespeciallyinIraqandAfghanistan.Runway, numerous aprons, ramps, taxiways, aircraft and helicopter runways havebeen designed by civil and electrical infrastructure specialist. Besides horizontalstructures,verticalstructureshavebeenbeingdesignedbyhisexperts.Thefollowingpagesshowtheup‐to‐dateprojectlistStaticacompletedsince2008.
Welookforwardworkingwithyourcompanyinthenearfuture. Wewouldliketothanktoyouforyourinterest.Sincerelyyours.OğuzAltuğAKSARAY HakanBAYRAM
CivilEngineer,M.Sc. CivilEngineer,M.Sc.
CompanyShareholder CompanyShareholder
-
ProjectNumber#56
GarrisonSupportKandak(GSK)&SpecialMissionWing(SMW)Headquarters,SouthKAIA,Kabul,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐CONTRACKINT. ClientPOC: miamin@contrack.comOverallContractValue ValueFirmResponsible
For
$36M ContractDuration
Feb2013‐MajorFeature(s):◙ Buildings◙ Roads◙ Infrastructure◙ WWTPProjectDescription:Theprojectconsistsofthedesign,siteadaptationandconstructionofnewpermanentfacilitiesfortheGarrisonSupportKandak(GSK)andSpecialMissionWing(SMW)Headquarters,SouthKAIA,KabulProvince,Afghanistan.Theprojectisdefinedasthedesign,siteadaptation,material,labor,andequipmenttoconstructbuildings,parking,aircraftpavement,utilitiesandotherinfrastructureforadesignpopulationofapproximately525personnel.Workalsoincludesdemolitionandrenovationofexistingstructures.TheContractorshallprovideforthedesign,material,labor,andequipmenttoconstructbuildings,roads,utilitiesandotheradditionalinfrastructure.
-
ProjectNumber#55
KAIAAirwingPhaseV,Kabul,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐CH2MHILL‐YUKSEL ClientPOC: agediz@yuksel.netOverallContractValue ValueFirmResponsible
For
$20M ContractDuration
Feb2013‐MajorFeature(s):◙ Buildings◙ Infrastructure◙ PavementProjectDescription:Theprojectconsistsofthedesign,siteadaptationandconstructionofnewpermanentfacilitiesatKabulInternationalAirport(KAIA)fortheAfghanNationalArmy(ANA)AirWingPhaseVinKabulDistrict,KabulProvince,Afghanistan.Theprojectisdefinedasthedesign,siteadaptation,material,labor,andequipmenttoconstructbuildings,parking,paving,ECP,utilitytieinandotherinfrastructureforadesignpopulationasshownforspecificfacilitieslistedinthissection.Workalsoincludesdemolitionandrenovationofexistingfeatures/facilities.Thisincludestheestimatedpopulationsoffuturedevelopmentswithinthecompoundthatwilltieintoandmakeuseofitsutilitysystems.
-
ProjectNumber#54
CommunicationandInformationSystemsDepotKandahar,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: NAMSA‐OBD ClientPOC: ibrahim.cavli@obd.com.trOverallContractValue ValueFirmResponsible
For
$8M ContractDuration
Jan2013‐MajorFeature(s):◙ BuildingProjectDescription:The contactorwill design a Theatre CIS Depot the purpose of which is to centrally locate all geographicinformationrequiredtoconducteffectiveoperationsintheatre.KandaharAirfield(KAF)asthetheatremainAirportofDebarkation(APOD)isthekeynodefordistributionofCISmaterialtotheRCSouthandRCWest.Thisonestoryrectangularbuildingwillhaveapproximateoveralldimensionsof30mx20m(600m2)withaclearheightof6mtoallowoperationofmechanicalloadhandlingequipment.Thefloorlevelshallbe30cmabovesurroundingsurfacearea.Thebuildingwillhavea17m2secureofficefor4personnel,secondoffice,workshopandrestroomfor6personnel. In frontofthebuildinghastobebuildingtworoofs leftandrightsidetocovertheheavyequipment(10x8mwithahighoflowestpoint4m).Theareahastobefenced2,5mhigh,includinggates.
-
ProjectNumber#53
PrimaryHealthCareFacility,Role1KAIANorth,Kabul,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: NAMSA‐YUKSEL ClientPOC: belibol@yuksel.netOverallContractValue ValueFirmResponsible
For
$8M ContractDuration
Dec2012‐MajorFeature(s):◙ BuildingProjectDescription:Thisprojectprovides~150m2,two‐storyreinforcedconcretebuilding.
-
ProjectNumber#52
CampAlvaradoTransitionApronExpansionsKandaharAB,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: INL‐DYNCORP‐YUKSEL ClientPOC: belibol@yuksel.netOverallContractValue ValueFirmResponsible
For
$8M ContractDuration
Dec2012‐MajorFeature(s):◙ AirfieldPavement◙ InfrastructureProjectDescription:Thisprojectprovides~30,000SQMofPortlandCementConcretePavementExpansionforparkingofseveralhelicopters.Design includessite layoutplanning,demolition, jointandmarkingplans, staticgroundingandmooringlayoutsanddetailsofconstruction.
-
ProjectNumber#51
WestsideUtilitiesInfrastructure,BagramAB,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐CONTRACKINT. ClientPOC: miamin@contrack.comOverallContractValue ValueFirmResponsible
For
$12M ContractDuration
Dec2012‐MajorFeature(s):◙ Buildings◙ Roads◙ Infrastructure◙ WWTPProjectDescription:VariousimprovementandexpansionstotheBagramAirfieldutilitynetwork,focusedprimarilyonprovidingutilityservicetotheWesternExpansionZone;
‐ Area82WTTP‐ Serviceconnectionsof66BuildingstoBaseNetwork‐ VariousLiftStations.‐ AdditionalUtilityNetworkaroundCASApron,‐ AdditionalUtilityNetworkaroundBypassroad
-
ProjectNumber#50
CampValdesTransitionPhaseIApronExpansionKandaharAB,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: INL‐DYNCORP‐YENIGUN ClientPOC: ilhami@yenigun.com.trOverallContractValue ValueFirmResponsible
For
$8M ContractDuration
Nov2012‐MajorFeature(s):◙ AirfieldPavement◙ InfrastructureProjectDescription:Thisprojectprovides~17,000SQMofPortlandCementConcretePavementforparkingofseveralhelicoptersand a link taxiway to existingTaxiway Foxtrot. Design includes site layout planning, demolition, joint andmarkingplans,staticgroundingandmooringlayoutsanddetailsofconstruction.
-
ProjectNumber#49
ANCOP1stBrigadeExpansion,Kabul,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐EMTA ClientPOC: yalcin.yumus@emtains.comOverallContractValue ValueFirmResponsible
For
$7M ContractDuration
Nov2012‐MajorFeature(s):◙ Buildings◙ Roads◙ InfrastructureProjectDescription:TheprojectincludesthefacilitiesnecessarytoestablishLifeSupportandServiceFacilitiesforANCOP1stBrigadeExpansion,Kabul,Afghanistan.
VehicleMaintenanceBuilding, Barracks, JointFuelStorage, StorageFacility, KitchenRenovation, InternalRoads, Allutilities
-
ProjectNumber#48
EmbassyWest,Baghdad,IraqFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: OBO‐ARKEL‐DK ClientPOC: vozkoc@dvk.com.trOverallContractValue ValueFirmResponsible
For
$27M ContractDuration
Nov2012‐MajorFeature(s):◙ Buildings◙ Roads◙ InfrastructureProjectDescription:TheprojectincludesthefacilitiesnecessarytoestablishLifeSupportandServiceFacilitiesforEmbassyWestinBaghdad,Iraq.
PerimeterWall, CompoundAccessControl, GuardTowers, DryCHUPods, OfficeBuildingforRefugeeCenter/RSOSupportFacilities, DogKennels OverheadProtectionCover PowerPlant Utilities
-
ProjectNumber#47
EastsideUtilitiesInfrastructure,BagramAB,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐SERKA ClientPOC: onur.erinc@adaliholding.comOverallContractValue ValueFirmResponsible
For
$33M ContractDuration
Oct2012‐MajorFeature(s):◙ Buildings◙ Roads◙ Infrastructure◙ WTP,WWTPProjectDescription:VariousimprovementandexpansionstotheBagramAirfieldutilitynetwork,focusedprimarilyonprovidingutilityservicetotheEasternExpansionZone;
‐ ExpansiontoWTP#3,‐ 12,000metersofwaterdistributionpiping,‐ ExpansiontoWWTP.‐ 6,000metersofgravitysanitarysewercollectionpiping,‐ 2,200metersofsanitaryforcemainpiping
-
ProjectNumber#46
AfghanAirForceExpansionShindandAirWing,PhaseIICentralUtilitiesInfrastructure,ATCALSShindandAB,HeratProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USAFCEE‐LES ClientPOC: mark.quinn@lakeshoreeng.comOverallContractValue
ValueFirmResponsibleFor
$74M ContractDuration
Sep2012‐MajorFeature(s):◙ Buildings◙ Roads◙ Infrastructure◙ AirfieldElectricalInfrastructureProjectDescription:ThePhaseIIprojectisdefinedasprovidingthedesign,material,labor,andequipmenttoconstructbuildings,utilitiesandtorenovateandrepairanexistingstructure. StructuresshallbeconstructedofaK‐Spanstyleconstructionwith stemwalls unless otherwise indicated. This project is for the expansion of the existingAfghanAir Force (AAF) facilities at ShindandAir Base to accommodate increased use by the AAF both intermsofaircraftandpersonnel.TheintentofCentralUtilitiesprojectistoincreasepowerandsewercapacitytosupporttheAfghanArmyandAirForcegarrisonsonthewestsideoftheShindandAirBase.Designandconstructionofnewwastewatersystem and a Prime Power plantwithmedium voltage distribution to include service to RMTC, ShindandPhase1,ShindandPhase2,2ndCDOKandak,4thSFKandak,207thCorpsTrainingArea,AirTrafficControlandLandingSystems.In ATCALS project, the contractor installs infrastructure and infrastructure requirements only forgovernment‐furnished and installed Air Traffic Control and Landing Systems (ATCALS) equipment andNavigationAids(NAVAIDs).Theinfrastructuresupportincludes,butisnotlimitedtoallrunwaynavigationaland control lighting conduit runs, manholes/hand holes, airfield lighting and control vault with back‐upgeneration, concrete equipment pads for NAVAIDS, NAVAID equipment shelters and power andcommunicationconduitinfrastructureconnectingcontroltowertoairfieldNAVAIDsitesandairfieldlightingvault.
-
ProjectNumber#45
KAIAConsolidated&IntegratedCISHardenedFacilityKabul,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: NAMSA/FEKA ClientPOC: hakankarakutuk@feka.com.trOverallContractValue ValueFirmResponsible
For
$5M ContractDuration
August2012‐MajorFeature(s):◙ Building◙ Roads◙ InfrastructureProjectDescription:The purpose of this project is to provide a new hardened consolidated Communication and Informationsystem(CIS)facilityattheKabulInternationalAirport(KAIA)North.ThenewCISFacilitydesignprovidesaRCstructurebuilding,twostoriesheight,appropriatelyhardenedtomeetthespecifiedthreatandcompliantwithsafetyandfirestandardrequirements.Thebuildingfootprintmeasuresabout1,150squaremeters.
-
ProjectNumber#44
KAIAEntryControlPointKabul,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: NAMSA/FEKA ClientPOC: hakankarakutuk@feka.com.trOverallContractValue ValueFirmResponsible
For
$5M ContractDuration
August2012‐MajorFeature(s):◙ Buildings◙ Roads◙ InfrastructureProjectDescription:ThepurposeofthisprojectistodeliverPhase2bofCivilworksoftheEntryControlPointsandPerimeterForceProtectionmeasuresatHQISAF.
-
ProjectNumber#43
NorthRumailaBPCampFacilityBasrah,IraqFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: BP‐ZaferCons.Co. ClientPOC: rormen@77construction.comOverallContractValue ValueFirmResponsible
For
$50M ContractDuration
July2012‐MajorFeature(s):◙ Buildings◙ Roads◙ InfrastructureProjectDescription:This project provides reinforced concretewith CMUand steel composite type building design, sitemasterplanningandutilityinfrastructuredesign.
-
ProjectNumber#42
ANAACPhaseIIINorthRampExpansionShindandAB,HeratProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USAFCEE‐LES ClientPOC: mark.quinn@lakeshoreeng.comOverallContractValue
ValueFirmResponsibleFor
$14M ContractDuration
June2012‐MajorFeature(s):◙ AirfieldPavementProjectDescription:Thisprojectprovidesapproximatelya30,500squaremeters(m2)ofaircraftrampareadedicatedforparkingof training aircrafts. This facility supports theNorthAtlanticTreatyOrganization (NATO)Coalition forcesoperationsintheHeratProvinceofAfghanistan.
-
ProjectNumber#41
BagramUMMCP‐341ProjectBagramAB,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐CH2MHill ClientPOC: rormen@77construction.comOverallContractValue ValueFirmResponsible
For
$7M ContractDuration
June2012‐MajorFeature(s):◙ Buildings◙ Roads◙ InfrastructureProjectDescription:This project provides reinforced concretewith CMUand steel composite type building design, sitemasterplanningandutilityinfrastructuredesign.
-
ProjectNumber#40
SimonBolivarInternationalAirportPavementRenovationProjectCaracas,VenezuelaFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: VenezuelianGovernment‐
SUMMAClientPOC: demir.olcer@summa.com.tr
OverallContractValue ValueFirmResponsibleFor
$1M ContractDuration
Feb2012‐April2012MajorFeature(s):◙ Runway,ParallelTaxiway,LadderTaxiways,Aprons◙ InfrastructureProjectDescription:Thisisapavementrenovationandexpansionprojectanditincludes2x3,500mlongRunway,2,850mlongParallelTaxiway,LadderTaxiwaysandAprons.Since theair traffic increasesdaily,existingpavementsareabout to finish their lifetime. There are visible deterioration of the existing pavements, both asphalt andconcrete.Existingdrainagestructuresdonotfunctionatall.Allthepavementsanddrainagestructureswillberenewed.DesignfollowsICAOandFAAstandards.
-
ProjectNumber#39
BagramCoalitionOperationsCenterBagram,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐CH2MHILL‐YUKSEL ClientPOC: agediz@yuksel.netOverallContractValue ValueFirmResponsible
For
$39M ContractDuration
Feb2012‐MajorFeature(s):◙ Building◙ InfrastructureProjectDescription:Theprimary facility isan11.000 squaremeter reinforced concreteadministrativebuildingwhich includesconference rooms, secure rooms/Sensitive Compartmented Information Facilities (SCIF), training areas, acommand center, communication equipment, day rooms, entry control space, and an operations bridge.Supporting facilities include electrical and mechanical infrastructure, water and sewage connections,informationsystemsinfrastructure,accessroads,walksanddrainage.
-
ProjectNumber#38
RunwayRepairManasAB,ManasProvince,KrygyzstanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐SERKA ClientPOC: onur.erinc@adaliholding.comOverallContractValue ValueFirmResponsible
For
$18M ContractDuration
Feb2012‐MajorFeature(s):◙ Runway◙ AirfieldLighting◙ InfrastructureProjectDescription:The purpose of this project is to repair the existing runway at the Transit Center atManas InternationalAirport, Kyrgyzstan, in 2 phaseswhilemaintaining flight operations at all times. Phase 1 reconstructs thewestendoftherunwayandpartoftheconcreteturnaroundarea.Phase2reconstructstheeastendoftherunway. Work includes demolition and replacement of the existing concrete pavement, excavation, sitepreparation,airfieldlighting,airfieldpainting,andallnecessaryworkforacompleteandusablefacility.
-
ProjectNumber#37
TaxiwayFoxtrotKandaharAB,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: NAMSA‐YENIGUN ClientPOC: ilhami@yenigun.com.trOverallContractValue ValueFirmResponsible
For
$8M ContractDuration
Feb2011‐MajorFeature(s):◙ AirfieldDrainage◙ InfrastructureProjectDescription:ThisprojectprovidesdrainagesolutiontotheexistingParallelTaxiwayFoxtrot.
-
ProjectNumber#36
BagramEntryControlPoint‐1BagramAB,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐77CONS.CO ClientPOC: rormen@77construction.comOverallContractValue ValueFirmResponsible
For
$7M ContractDuration
Feb2012‐MajorFeature(s):◙ Buildings◙ Roads◙ InfrastructureProjectDescription:This project provides reinforced concretewith CMUand steel composite type building design, sitemasterplanningandutilityinfrastructuredesign.
-
ProjectNumber#35
BagramDrainagePhaseIIBagramAB,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐YUKSEL ClientPOC: agediz@yuksel.netOverallContractValue ValueFirmResponsible
For
$18M ContractDuration
Nov2011‐Feb2012MajorFeature(s):◙ InfrastructureProjectDescription:Underthescopeoftheproject,
‐ Openchannels,‐ Culverts,‐ Catchbasin,‐ Manholes,‐ Excavationsupportsystems,‐ Steelbridgecalculationsanddrawingshavebeenhandled.
-
ProjectNumber#34
BagramTheatreCommandFacilityBagramAB,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐YUKSEL ClientPOC: agediz@yuksel.netOverallContractValue ValueFirmResponsible
For
$22M ContractDuration
Feb2012‐MajorFeature(s):◙ Buildings◙ Roads◙ InfrastructureProjectDescription:Thisprojectconsistsofa2.230squaremeterreinforcedconcreteCommandandControlFacilitybuildingand1.045 squaremeter secure storage yard. Supporting facilities include electric service and utilities, paving,walks,curbs,gutters,siteimprovementanddemolition.
-
ProjectNumber#33
ANAACPhaseIAprons&TaxiwayBravoShindandAB,HeratProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USAFCEE‐LES‐YUKSEL ClientPOC: mark.quinn@lakeshoreeng.comOverallContractValue
ValueFirmResponsibleFor
$54M ContractDuration
Sep2011‐MajorFeature(s):◙ AirfieldPavementProjectDescription:FixedWing&RotaryWingApronsThisprojectprovidesapproximatelya30,500squaremeters(m2)ofaircraftrampareadedicatedforparkingof training aircrafts. This facility supports theNorthAtlanticTreatyOrganization (NATO)Coalition forcesoperationsintheHeratProvinceofAfghanistan.
TaxiwayBravoThis project provides approximately a 3,500 square meters (m2) of taxiway between main runway andparallel taxiway. This facility supports the North Atlantic Treaty Organization (NATO) Coalition forcesoperationsintheHeratProvinceofAfghanistan.
-
ProjectNumber#32
BagramTroopHousingPhaseIV,V&VIBagramAB,KabulProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐YUKSEL ClientPOC: a.gediz@yuksel.netOverallContractValue ValueFirmResponsible
For
$50M ContractDuration
Sep2011‐MajorFeature(s):◙ HousingProjectDescription:TroopHousingPhaseIVThisprojectprovidesBarracksBuildingsof concrete framedstructurewithCMUwalls. Facilities include8barracks to provide housing for 1.216 personnel. Supporting facilities are electrical, water, and sewagedistributionsystems,mechanicalsystems,informationsystems,siteimprovements,anddrainageatBagram.TroopHousingPhaseVThisprojectprovidesBarracksBuildingsofconcreteframedstructurewithCMUwalls.Facilitiesinclude10barracks to provide housing for 1.520 personnel. Supporting facilities are electrical, water, and sewagedistributionsystems,mechanicalsystems,informationsystems,siteimprovements,anddrainageatBagram.TroopHousingPhaseVIThisprojectprovidesBarracksBuildingsofconcreteframedstructurewithCMUwalls.Facilitiesinclude10barracks to provide housing for 1.520 personnel. Supporting facilities are electrical, water, and sewagedistributionsystems,mechanicalsystems,informationsystems,siteimprovements,anddrainageatBagram.
-
ProjectNumber#31
ChapelBuildingKAIA,KabulProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: NAMSA‐YUKSEL ClientPOC: ozguzel@yuksel.netOverallContractValue ValueFirmResponsible
For
$54M ContractDuration
Oct2011‐Dec2011MajorFeature(s):◙ BuildingProjectDescription:ChapelBuildingThisprojectprovidesapp.600m2reinforcedconcreteandsteelcompositestructure.Duetoforceprotectionexteriorfaceofthestructureiscomposedofreinforcedconcreteshearwalls.Bothfirstfloorandsecondfloorslabsareconstructedwithsteelgirdersoverconcretesupportingbytrapezoidalmetalsheet.
-
ProjectNumber#30
AirTrafficControlTowerManasAirport,ManasProvince,KrygyzstanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐RAYTHEON‐SERKA ClientPOC: onur.erinc@adaliholding.comOverallContractValue ValueFirmResponsible
For
$18M ContractDuration
Oct2011‐MajorFeature(s):◙ Building/TowerProjectDescription:AirTrafficControlTower,8storey‐27mhighreinforcedconcretebuildingwithsteelcabportionatManasIAP.
‐Architectural‐Civil‐Structural‐Plumbing‐MechanicalHVAC‐FireProtection‐Electrical‐Communication
-
ProjectNumber#29
C‐IEDFacilityBagramABBagramAB,KabulProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐KBR‐SERKA ClientPOC: michael.thurner@kbr.comOverallContractValue ValueFirmResponsible
For
$12M ContractDuration
Oct2011‐MajorFeature(s):◙ BuildingProjectDescription:ThisprojectconsistsofdesignofaCounter‐ImprovisedExplosiveDevice (C‐IED)TaskForceCompoundatBAF. Primary facilities include a consolidated Command and Control building including AdministrativeFacilities,SecureCompartmentedInformationFacility(SCIF),Armory,ClassroomandWarehousewhichfallunder one roof having 5,761m2. Supporting facilities include site preparation, paving,walks, informationsystems,electric,waterdistributionsystems.
-
ProjectNumber#28
AfghanNationalPoliceRegionalPoliceTrainingCenterShindandProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐YUKSEL ClientPOC: belibol@yuksel.netOverallContractValue ValueFirmResponsible
For
$55M ContractDuration
July2011‐MajorFeature(s):◙ Building◙ FireRanges◙ Roads◙ InfrastructureProjectDescription:Thisprojectconsistsofthespecifiedsite‐adaptation,siteandinfrastructuredesignandconstructionfor/ofanew campus facility for the AfghanistanNational Police (ANP), Regional Police Training Center (RPTC) inShnidand,HeratProvince,Afghanistan.This facilitywillhouseapproximately3,000personnelconsistingoftrainees and staff. The RPTC is an ANP Training Establishment including 40 buildings, parking areas, allutilitiesandotherinfrastructure.
-
ProjectNumber#27
StrategicAirliftApron&HelicopterApronMazar‐e‐Sharif,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐YUKSEL ClientPOC: belibol@yuksel.netOverallContractValue ValueFirmResponsible
For
$26M ContractDuration
Feb2011‐MajorFeature(s):◙ Shelters◙ AirfieldPavements◙ Roads◙ InfrastructureProjectDescription:Thepurposeof theproject is toprovidecompleteStrategicAirliftApronandHelicopterApronatMazar‐e‐sharif.
(1) StrategicAirliftApron:Amedium‐load(C‐5orequivalent),PCCapronwithconnectingtaxiwaysandshoulders.Workalsoincludespavementmarkings,groundingpoints,utilities(powerandelectricalconnections)andothernecessarysiteimprovements.
(2) HelicopterApron:Amediumload,PCCapron,connectingtaxiwaysandshouldersforrotary‐wingedaircraft. Work will also include pavement markings, grounding points, aircraft shelters, utilities(including but not limited to power and electrical connections), and other necessary siteimprovements.
-
ProjectNumber#26
AfghanNationalDefenseUniversityPhaseIIQarghaProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: AFCEE‐LES ClientPOC: joe.ballmer@lakeshoreeng.comOverallContractValue ValueFirmResponsible
For
$75M ContractDuration
Feb2011‐MajorFeature(s):◙ Buildings◙ FireRanges◙ Roads◙ Infrastructure◙ WTPProjectDescription:This project consists of providing facilities for continuing officer and senior noncommissioned officerprofessionaleducationcourses for theAfghanNationalArmy(ANA). Thisproject isPhase IIof theoveralleffort to provide for the completion of the Afghan National Defense University (ANDU) site at Qargha,Afghanistan.
AfghanNationalDefenseUniversityDesignandconstructionoffacilitiesfortheAfghanNationalDefenseUniversityPhaseIIatQargha,Afghanistan.
JointServicesAcademy LegalBranchSchool ReligiousandCulturalAffairsSchool
TherequiredfacilitiesaredesigningandconstructingLifeSupportArea(LSA),buildings,roads,utilities,tie‐inforapproximately4,000personnel to include;barrackswithshower/latrine/ablutionandstoragefacilities,classroombuildings,acampusmulti‐purposebuildingwithHQoffices,electricaldistributionsystemsandtie‐in to existingpowerplant, sanitary sewer collection system tie‐in to existing lines, tie‐in to existingwaterlinesanddistributionsystem;andtieintosandexpandtheroadnetworkinsidethecompound.
-
ProjectNumber#25
DogKennelKandaharAB,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: NAMSA‐YENIGUN ClientPOC: ilhami@yenigun.com.trOverallContractValue ValueFirmResponsible
For
$5M ContractDuration
Feb2011‐April2011MajorFeature(s):◙ Buildings◙ InfrastructureProjectDescription:Thisprojectprovides20baydogkennelwithadministrativeareaand30baydogkennelatKandaharAirfield.Bothkennelswillbehoused“castinplace”reinforcedconcretebuilding.
-
ProjectNumber#24
TheatreVehicleMaintenanceBuildingsKandaharAB,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐YENIGUN ClientPOC: ilhami@yenigun.com.trOverallContractValue ValueFirmResponsible
For
$25M ContractDuration
Dec2010‐Dec2011MajorFeature(s):◙ Buildings◙ InfrastructureProjectDescription:Thework includeselevenmajor facilities, sixsupportstructures,andvarious factory‐fabricatedequipmentneededtosupportsustainment‐levelmaintenanceoftacticalequipmentfortheAfghantheaterlocatedintheDeepSouthParkatKandaharAirfieldAfghanistan.Majorfacilities:ThereareelevenmajorstructuresassociatedwiththeTheaterVehicleMaintenanceFacilityincluding two Vehicle Maintenance Buildings, two Administration Buildings, a CE/MHE Building, aRobotics/ShopStockStorageBuilding,aT.A.R.P./PaintBuilding,aFirePumpHouse,aPaintBooth,aVehicleWashStationandaT.A.R.P.StorageShed.VehicleMaintenanceandAdministrationare joined intoa singlestructure.TheCE/MHE,Robotics/ShopStockStorageandT.A.R.P./PaintBuildingformasinglelargecomplex.
-
ProjectNumber#23
TaxiwayHotelExtensionKAIA,KabulProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: NAMSA‐CH2MHILLYUKSEL ClientPOC: ozguzel@yuksel.netOverallContractValue ValueFirmResponsible
For
$15M ContractDuration
June2011‐Oct2011MajorFeature(s):◙ AirfieldPavement◙ InfrastructureProjectDescription:ThisprojectprovidesreinforcedconcretewithCMUandsteelcompositetypebuildingdesign.
-
ProjectNumber#22
RLBsFOBAirborneWardakProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐OBDConst. ClientPOC: ibrahim.cavli@obd.com.trOverallContractValue ValueFirmResponsible
For
$3,3M ContractDuration
Feb2011‐Aug2011MajorFeature(s):◙ Buildings◙ Roads◙ InfrastructureProjectDescription:ThisprojectconsistsofGovernmentFurnishedRe‐LocatableBuilding(RLB)containermodulesandrelatedsupport facilities for774personnelatForwardOperatingBase (FOB)Airborne locatednearKane‐Ezzat inWardakProvince,Afghanistan.Themodulesare2‐storybuildings.Supportfacilitiesarevehicleaccessroadsand parking areas, utilities and any other necessary infrastructure such as, above ground water storagetank(s), chlorination system, booster pumps, pump house, a buries sanitary sewer collection system andsewageholdingtank,transformers,powerandcommunicationsystems.
-
ProjectNumber#21
AdministrationBuildingKandaharAB,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: NAMSA‐OBDConstr. ClientPOC: ibrahim.cavli@obd.com.trOverallContractValue ValueFirmResponsible
For
$3,4M ContractDuration
Dec2010‐Sep2011MajorFeature(s):◙ Buildings◙ InfrastructureProjectDescription:Thisprojectconsistsoftwo‐storyreinforcedconcreteAdministrationbuildingapproximately400m2intotal.Duetoforceprotection,allsidesofthebuildingisdesignedwithreinforcedconcreteshearwalls.
-
ProjectNumber#20
RLBsPhaseIIKandaharAirfield,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐YENIGUNConst. ClientPOC: koray.ozdemir@yenigun.com.trOverallContractValue ValueFirm
ResponsibleFor
$3,0M ContractDuration
Sep.2010‐Dec.2010MajorFeature(s):◙ Buildings◙ Roads◙ InfrastructureProjectDescription:The project consists of Government Furnished Re‐Locatable Building (RLB) container modules for 888personnel and related support facilities at Kandahar, Afghanistan. Each structure will be with externalwalkways and stairs. Support facilities areparking, utilities andother infrastructure for theRLBHousingproject.Theworkincludesconcretefoundations;reinforcedconcretebunkerandblastprotectionbarriersanabove ground water storage tank(s), chlorination system, booster pumps, jockey pump, hydro pneumatictanks; pump house and buried water distribution system; a buried sanitary sewer collection system andsewage lift station and force main(s); electrical generators; fuel tanks and spill containment area;transformers;buriedpowerdistributionandcommunicationsystemsandperimeterlighting.
-
ProjectNumber#19
InteeligenceFusionCellKandaharAirfield,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐YENIGUNConst. ClientPOC: koray.ozdemir@yenigun.com.trOverallContractValue ValueFirm
ResponsibleFor
$1,5M ContractDuration
Sep.2010‐Dec.2010MajorFeature(s):◙ Buildings◙ InfrastructureProjectDescription:Theprojectinvolvestwostoryreinforcedconcretebuildingaround380m2.
-
ProjectNumber#18
FY10RotaryWingParkingApronShindandAB,HeratProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐TETRATECH‐
YUKSELClientPOC: belibol@yuksel.net
OverallContractValue ValueFirmResponsibleFor
$15M ContractDuration
Nov2010‐Feb2011MajorFeature(s):◙ AirfieldPavement◙ InfrastructureProjectDescription:Thisprojectprovides110,000sqmofconcretepavementforhelicopterparkingapron.
-
ProjectNumber#17
FY10AviationComplex,Shelters,MaintenanceFacility,MissionPlanningFacilityMazar‐e‐Sharif,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐YUKSEL ClientPOC: belibol@yuksel.netOverallContractValue ValueFirmResponsible
For
$29M ContractDuration
Nov2010‐Dec2011MajorFeature(s):◙ Buildings◙ AirfieldPavements◙ Roads◙ Infrastructure◙ SheltersProjectDescription:This project includes three C‐12, CH‐47, CV‐22 capable fabric maintenance hangars, reinforced concreteaviationmaintenancefacility,reinforcedconcretemissionplanningfacility,aircraftapronfor6rotorand2fixedwingaircraftandtaxiways.Supportingfacilitiesare,airfieldpavementmarkings,groundingpointsandtie‐downs,prefabricatedaircraftprotectiverevetmentsystem,electricalgeneratorsanddistributionsystem,waterandsewagedistributionsystem,miscellaneoussiteimprovementsanddrainage.
-
ProjectNumber#16
FY09‐10CASApronExpansion,ExpeditionaryFighterShelters,AviationOperationandMaintenanceBuildingBagramAB,KabulProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐CH2MHILL‐77 ClientPOC: mohidur.rahman@CH2M.comOverallContractValue ValueFirmResponsible
For
$32M ContractDuration
Nov2010‐MajorFeature(s):◙ Buildings◙ Shelters◙ Roads◙ Infrastructure◙ AirfieldPavementsProjectDescription:Thisprojectprovides50,000sqmofconcreteapron,twofightershelters,onehangarformaintenance.
-
ProjectNumber#15
CampBastionBLAHAHotCargoPad,CampBastionAB,HelmandProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USAFCEE‐CH2MHILL‐77CO ClientPOC: rormen@77construction.comOverallContractValue ValueFirmResponsible
For
$24M ContractDuration
01Sep2010‐01March2011MajorFeature(s):◙ Building◙ Runway◙ RoadProjectDescription:BasicLoadAmmoHoldingArea–ProjectNumber73100This project provides approximately a 22,500 square meters (m2) of aircraft ramp area dedicated forhandlinghazardouscargo(referredtoashotcargo)inCampBastion,Afghanistan.ThisfacilitysupportstheNorth Atlantic Treaty Organization (NATO) Coalition forces operations in the Helmand Province ofAfghanistan. Theramp is located to thenortheastofnewRunway01‐19.Theprimary facilities includesarampparkingarea,ladderconnectingtaxiway,andvehicularaccessroad.Supportfacilitiesincludeelectricalservice(edge lightsandhighmast lights), tie‐down/grounding,andsite improvements. Aircraftdesign fortherampisforC‐5.
-
ProjectNumber#14
CampBastionPhaseIVProject,CASApronExpansion,Armed/De‐armedApronExpansion,ISRApron,ExpeditionaryFighterShelters,AviationOperationsandMaintenanceHangar,CampBastionAB,HelmandProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USAFCEE‐LAKESHORE ClientPOC: nigel.cook@lakeshoreeng.comOverallContractValue ValueFirmResponsible
For
$32M ContractDuration
01Agu2010‐01July2011MajorFeature(s):◙ Building◙ Runway◙ RoadProjectDescription:CASApronExpansion–ProjectNumberCMBA10‐3200Thisprojectentailsconstructinga43,000squaremeters(m2)pavedaircraftparkingexpansion for12CASfighter‐typeaircraft.Additionally,theworkincludes12,600m2expansionstotwoexistingArm/De‐Armpadsforusebyaircraft.Theworkincludesapronandpaddesignandconstructionincludingpavementmarkings,tie‐down/grounding,edgelighting,utilitiesandothersiteimprovements.ISRApron–ProjectNumberCMBA10‐3300TheContractorconstructsa46,700m2pavedapronandshoulderssizedtoaccommodateparkingfor20ISRtypeaircraft.Theproject includesall connecting taxi lanes, shoulders, aircraft shelters, site improvements,pavementmarkings,tie‐down/grounding,utilitiesandallothernecessarysiteimprovements.ExpeditionaryFighterShelters–ProjectNumberCMBA10‐3700The Contractor constructs two 1,050 m2 expeditionary fighter shelters for conducting minor fieldmaintenanceondeployedaircraft. Work includespavements, fireprotectionsystem,supportingandothernecessarysiteimprovements.Thesheltersareexpeditionaryfabric‐type.AviationOperationsandMaintenanceFacilities–ProjectNumberCMBA10‐3600The scope of work for this project entails developing an aircraft maintenance facility to support fighteraircraft operations. The Contractor constructs a 2,400 m2 aviation and operations facility for flight linemaintenance.Work includespavements, supporting infrastructureandothernecessarysite improvements.This task is for theprovisionofanavionics,aircraftengineandaerospacegroundequipment (AGE)repairand maintenance facility at the Camp Bastion airfield to accommodate the expanded number of aircraftoperatingoutofthisbase.
-
ProjectNumber#13
CampBastionPhaseIIIProject,StrategicRampExpansionandLinkTaxiway,RSOIPassengerTerminalBuilding&Facility,CargoHandlingYard,CargoWarehouse&Facility,CampBastionAB,HelmandProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USAFCEE‐LAKESHORE ClientPOC: steve.burns@lakeshoreeng.comOverallContractValue
ValueFirmResponsibleFor
$27M ContractDuration
01June2010‐01July2011MajorFeature(s):◙ Building◙ Runway◙ RoadProjectDescription:StrategicAirliftApronExpansion–ProjectNumberCMBA10‐310044,600 square meter (m2) Portland Cement Concrete (PCC) paved apron with asphalt paved shouldersexpansion and other necessary site improvements. The project consists of enlarging an existing strategicairlift apron (under construction) to accommodate two additional parking for C‐5/An‐124 or equivalentaircraft.Anadditionalladderconnectingtaxiwayofapproximately3,900m2isconstructedformoreefficientdirectaccesstotheapron. Appropriateedge lights,grounding/tie‐down,marking,sitedrainage,andothersiteimprovementsisrequiredtocompletethisproject.
SecureRSOIFacility–ProjectNumberCMBA10‐3400TheprojectconsistsofconstructingapassengerterminalaspartoftheRSOIfacility.Workincludesaparkingarea,roadwaysconnectingotherareas,andbusloopsattheterminal.TheprimaryfacilityisthesecureRSOIbuilding, accommodatedwithina2,400m2pre‐engineeredbuilding (PEB). It isdesigned toaccommodateAmerican,British, andvery importantpersonnel (VIP) ina secureand functionalmanner. Thesupportingfacilitiesincludeaparkingareaforvehiclesandbuses.Aserviceroadisincludedtoconnectthefacilitywiththestrategicairliftapronexpansionandthecargohandlingarea. Utilitiesincludeapointsourceforpowercreatedbyageneratorfarm.Siteimprovementsincludedrainageandsitelevelingandgrading.CargoHandlingArea–ProjectNumberCMBA10‐3500Theprojectconsistsofa35,000m2pavedcargohandlingyard,cargowarehousewithutilities,lighting,siteimprovements,drainage,andfiresuppression.Theprimaryfacilityconsistsofan1,000m2cargowarehousewith offices for the United States (U.S.) personnel and operations and large paved handling yard. Thesupporting facilities include fencingandgatessuitable for trucks,a firesuppressionsystem,andhighmastlighting.Utilitiesincludepointsourcepowergeneration,securityfence,siteimprovements,anddrainage.
-
ProjectNumber#12
CampBastionMSA&ASPProject,MunitionsStorageAreaandAmmunitionSupplyPointCampBastionAB,HelmandProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USAFCEE‐LAKESHORE ClientPOC: mark.quin@lakeshoreeng.comOverallContractValue ValueFirmResponsible
For
$57M ContractDuration
01June2010‐01July2011MajorFeature(s):◙ Building◙ Runway◙ RoadProjectDescription:MunitionsStorageArea–ProjectNumber:CMBA09‐3975TheContractorconstructsanewMSAtoincludeperimeterfence,pavedroadways,pre‐engineeredbuildings,concretepavedmunitionsstoragepads,lightningprotection,sitelighting,electricalpowergeneration,andallsite works, earthworks and drainage improvements for a fully functional MSA. Work includes civil,mechanical,electrical,andcommunicationsinfrastructurerequiredforafullyoperationalfacility.AmmunitionStoragePoint–ProjectNumber:77159TheContractorconstructsanewASPtoincludestoragebuildings,workshops,concretepavedstoragepads,sitework,drainageimprovements,roads,lightningprotection,sitelighting,fencing,andelectricalgeneration.Workincludescivil,mechanical,electrical,guardtowers,andcommunications.
-
ProjectNumber#11
KandaharAirfieldFY09andFY10Projects,StrategicAirliftApron,TacticalApronKandaharAB,HelmandProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACE‐CONTRACKINT ClientPOC: kawakibi@contrack.comOverallContractValue ValueFirmResponsible
For
$27M ContractDuration
01AGU2010‐01March2011MajorFeature(s):◙ Building◙ Runway◙ RoadProjectDescription:StrategicAirliftApronConcrete Paved Airlift Ramp approximately 100,000m2, parking space for two strategic and nine tacticalairliftaircrafts,pavementmarkings,edgelighting,highmastlightingandutilities(powerandstormwater).TacticalAirliftApronConcretePavedAirliftRampapproximately39,000m2,parkingspaceforsixtacticalairliftaircrafts,pavementmarkings,edgelighting,highmastlightingandutilities(powerandstormwater).
-
ProjectNumber#10
CampBastionUKStrategicAirliftRampCharlieCampBastionAB,HelmandProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: UKWORKGROUPS‐
LAKESHOREClientPOC: steve.burns@lakeshoreeng.com
OverallContractValue
ValueFirmResponsibleFor
$30M ContractDuration
01Feb2010‐01Nov2010MajorFeature(s):◙ Building◙ Runway◙ RoadProjectDescription:StrategicAirliftApronConcrete Paved Airlift Ramp approximately 100,000m2, parking space for 3 strategic and 3 tactical airliftaircrafts,andutilities(powerandstormwater).DesignfollowsUKCodes.
-
ProjectNumber#9
CampBastionPhaseIProject,StrategicAirliftApronandLinkTaxiways,Runway,ParallelTaxiwayandLateralTaxiwaysAandE,RotaryWingApronandLinkTaxiways,CirculationRoad,VaultBuilding,CompleteAirfieldLightingCampBastionAB,HelmandProvince,AfghanistanFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USAFCEE‐LAKESHORE ClientPOC: nigel.cook@lakeshoreeng.comOverallContractValue ValueFirmResponsible
For
$165M ContractDuration
01May2009‐01March2011MajorFeature(s):◙ Building◙ Runway◙ RoadProjectDescription:Theprojectiscomposedofaparalleltaxiwayextension(anextensiontotheexistingrunway01‐19),threenewconnectingtaxiways,anewrunway01‐19,astrategicrampandarotarywingparkingapron.Theparalleltaxiwayextensionisa1350m(900mBaseBidLength+450mOptionalBidLength)additiontothe existing runway in north‐south direction. In this case, the existing runway is planned to be used asparallel taxiwayandconnected to thenewrunway.Thenewtaxiwayextension is28mwideandhas15mpavedshoulders.Itmatchesthegeometryandconstructionoftheexistingrunwayinallaspects.Theexistingrunwayshoulderareonly3mwidebutisextendedto15mwideinaccordancewiththeRFP.Three connecting taxiwaysare the facilitieswhichareaiming to connect thenewparallel taxiway tonewrunway.Theseare23mwideandhave15mpavedshoulders.Thenewrunwayis3500mlongrunway.Itis46mwideandhas15mpavedshoulderand15mwideunpavedshoulder.It is locatedonnorthsouthdirectionandparalleltotaxiwayextension.Thedirectionofthenewrunwayis01‐19thatisthesameastheexistingrunway.Thestrategicramphasapproximately66.500SMplanareaandaccommodates twoC‐5orAN‐124aircraftand4C‐130aircraft. It is locatedwestofexisting runwayandconnected toexisting runwayandparalleltaxiwayextensionwithtwoaccesstaxiways.Thereis15meterwidepavedshoulderontheperimeteroftheapronandtheaccesstaxiways.Therotarywingparkingapronhasapproximately70.000SMplanareaandaccommodates15CH47/CH53aircraft.Itislocatedeastofnewrunwayandconnectedtonewrunwaywithtwoaccesstaxiways.Alsothereis a connection roadwhich is located at the center of east edge of the apron. It provides a connection tocirculationroad that isapartof thisproject.Thereare7.5widepavedshoulderson theperimeterof theapronandtheaccesstaxiways.Inaddition,thereareacirculationroadandaccessroadsinordertoprovideaccesstothefacilitiesfornewandfutureplannedaprons.Thecirculationroadispassingthroughtheperimeterofthecamponthesouthoftheairbaseandthenrunsparalleltothenewrunwayandprovideaccesstotheapronsconnectingtothenew
-
runway. There is a new fence line installed at the south, east and north side of the facilities for securityrequirement.ThereisatemporaryperimeterroadrunningparalleltothenewfencelineinordertoprovideaccesstotheLSAcampandBatchPlantthatareonlocatedontheeastofthenewrunway.TheprojectaccesshasbeenplannedtobeattheentranceofthesouthsideoftheBatchPlant.
-
ProjectNumber#8
ConvoySupportCenter,PhaseIIAliAB,TallilProvince,IraqFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACEE‐KBR‐KULAK ClientPOC: Michael.Thurner2@kbr.comOverallContractValue ValueFirmResponsible
For
$15M ContractDuration
01June2009‐01March2010MajorFeature(s):◙ Building◙ Runway◙ RoadProjectDescription:‐PavingofOption‐2Roads‐Constructing12MWPowerPlant‐WasteWaterCollectionSystemincludingliftstations,sewertanks,manholes.‐PotableWaterDistributionLoopwith12firehydrants‐TwoNewReverseOsmosisWaterPurificationUnitswithrequiredtanks,pumpsandpipings
-
ProjectNumber#7
StrategicAirliftRamp,ArmedHelicopterApron,UnarmedHelicopterApronAliAB,TallilProvince,IraqFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACEE‐KBR‐KULAK ClientPOC: Michael.Thurner2@kbr.comOverallContractValue ValueFirmResponsible
For
$35M ContractDuration
01Oct2008‐01March2009MajorFeature(s):◙ Building◙ Runway,Aprons◙ RoadProjectDescription:ISRAirlift183x208m,UnarmedHelicopterApron195x795mArmedHelicopterApron228X428m
‐Layouts,‐Jointing,Grading,Drainage,‐Marking,UtilityRelocations,‐StructuralUtilityBridging,‐T‐wallandBob‐wallLayoutforForceProtection,‐Floodlighting,StaticGrounding,‐Tie‐downandEdgeLightingDesignandDrawings.‐RigidPavementThicknessDesign.
-
ProjectNumber#6
AirTrafficControlTower,AliAB,TallilProvince,IraqFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACEE‐KBR‐KULAK ClientPOC: Michael.Thurner2@kbr.comOverallContractValue ValueFirmResponsible
For
$8M ContractDuration
01Oct2008‐01March2009MajorFeature(s):◙ Building◙ Runway◙ RoadProjectDescription:AirTrafficControlTower,8storey‐28mhighreinforcedconcretebuildingwithsteelcabportion.
‐Architectural‐Civil‐Structural‐Plumbing‐MechanicalHVAC‐FireProtection‐Electrical‐Communication
-
ProjectNumber#5
DFACFacilityDeltaAB,TallilProvince,IraqFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACEE‐KBR‐KULAK ClientPOC: Michael.Thurner2@kbr.comOverallContractValue ValueFirmResponsible
For
$21M ContractDuration
01Oct2008‐01March2009MajorFeature(s):◙ Building◙ Runway◙ RoadProjectDescription:DFACdiningfacilitybuilding,6000m2ofsteelstructure,hastoserve5900personnelwith5cyclesof1,180personnel..Supportfacilitiesare,powerproductionanddistributionsystems,waterandsewagedistributionsystems,mechanicalsystemsandotherfeaturessuchas,roads,curbs,walkways,parkingpavement,walkwaysandsitedrainage.
-
ProjectNumber#4
FighterRamp&TaxiwayFoxtrotAnacondaAB,BaladProvince,IraqFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACEE‐KBR‐YUKSEL ClientPOC: Michael.Thurner2@kbr.comOverallContractValue ValueFirmResponsible
For
$14M ContractDuration
01Oct2008‐01March2009MajorFeature(s):◙ Building◙ Runway11◙ RoadProjectDescription:FighterRamp183x208m,Taxiway800x23m
‐Layouts,‐Jointing,Grading,Drainage,‐Marking,UtilityRelocations,‐StructuralUtilityBridging,‐T‐wallandBob‐wallLayoutforForceProtection,‐Floodlighting,StaticGrounding,‐Tie‐downandEdgeLightingDesignandDrawings.‐RigidPavementThicknessDesign.
-
ProjectNumber#3
SatherAirbaseAirfieldPavementRepairProjectsSatherAB,BaghdadProvince,IraqFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: USACEE‐KBR‐77Co ClientPOC: rormen@77construction.comOverallContractValue ValueFirmResponsible
For
$27M ContractDuration
01Oct2008‐01March2009MajorFeature(s):◙ Building◙ Runway◙ RoadProjectDescription:Therearemanylocationsoverthemainrunwayandapronswherepavementrepairswillbedone.23repairscenarioshavebeendevelopedforrepairworks.
-
ProjectNumber#2
TokatWasteWaterTreatmentPlantTokat,TürkiyeFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: TokatMunicipality ClientPOC: d.bas@hidrotek.com.trOverallContractValue ValueFirmResponsible
For
EUR7.5M ContractDuration
01Oct2008‐01March2009MajorFeature(s):◙ WaterTanks◙ BuildingsProjectDescription:TheoverallaimofthisprojectistoaccelerateTurkey'saccessionbyenablingTurkeytoachieveahighlevelofenvironmentalprotectionandcompliancewiththeEUdirectivesconcerningqualityinthewatersector.The specific purpose is to improve the environmental condition of the Yeşilirmak River by reducing thepollutionloadthroughtheconstructionofTokatWastewaterTreatmentPlant(TokatWWTP).Thetreatmentplantwillbeamechanical‐biologicalplant(BiologicalNitrogenRemovalBNR)withphysicalandbiological stages servicingapopulationof200,000personsand33,000 industrialp.e. (Stageone)Theplantshallbedesignedforanexpansiontocover270,000personsand44,000industrialp.e.(Stagetwo).Thisplantincludesmanywaterretainingstructurestogetherwithbuildingtypeofstructureslistedbelow.AerationTanksFinalSedimentationTanksPrimarySedimentationTanksDigestersScreensCollectionandDistributionChambers””ReturnSludgePumpingStationsGritandGreaseRemovalTanksSludgeBufferTanksScumPumpingStationSludgeThickeningUnitsSludgeHomogenisationTanks
-
CascadeAerationUnitsParshallFlumeChlorinationBuildingSludgeDewateringBuildingAdministrationBuildingBlowerandTransformerBuildingGuardHouse
-
ProjectNumber#1
NevşehirWasteWaterTreatmentPlantNevşehir,TürkiyeFirm: STATICAPROJECTENGINEERING PrimeContractor: Subcontractor: Client/Owner: NevşehirMunicipality ClientPOC: o.ozgul@hidrotek.com.trOverallContractValue ValueFirmResponsible
For
EUR5.5M ContractDuration
01June2008‐01December2008MajorFeature(s):◙ WaterTanks◙ BuildingsProjectDescription:TheoverallaimofthisprojectistoaccelerateTurkey'saccessionbyenablingTurkeytoachieveahighlevelofenvironmentalprotectionandcompliancewiththeEUdirectivesconcerningqualityinthewatersector.The specific purpose of this project is to improve the environmental condition of theKaraağaç Creek andKızılırmakRiverbyreducingthepollutionloadthroughtheconstructionofNevşehirWastewaterTreatmentPlant(NevşehirWWTP).Thetreatmentplantwillbeanextendedaerationactivatedsludgeplantwithphysicalandbiologicalstagesservicingapopulationof125,000personsand9,000industrialp.e.(stageone)Theplantshallbedesignedforanexpansiontocover170,000personsand14,000industrialp.e.(stage2).Thisplantincludesmanywaterretainingstructurestogetherwithbuildingtypeofstructureslistedbelow.AerationTanksFinalSedimentationTanksScreensCollectionandDistributionChambersReturnSludgePumpingStationsGritandGreaseRemovalTanksSludgeBufferTanksScumPumpingStationCascadeAerationUnitsParshallFlumeChlorinationBuilding
-
SludgeDewateringBuildingAdministrationBuildingBlowerandTransformerBuildingGuardHouse
COVERStatica PE Cover LetterSTATICA PE_LIST of PROJECTS Rev07
top related