State College Area School District

January 22, 2018

Overall Progress

Building View from Westerly Parkway

Main Lobby

Finished Benches in the Main Entrance Lobby

Main Entrance Courtyard

Main Entrance Courtyard view from the LGI Room

Classroom Finishes

Childhood Development classroom with furniture set up

Classroom Finishes

Learning Enrichment classroom decorated for class

Temporary Library

All 1,200 boxes from the libraries have been moved and unpacked

Interior Finishes

The temporary Food Service Café is set up and operational on 1st Floor Pod C

Shop Areas

Electricians working in the Auto Lab

Shop Areas

Equipment Being hooked up in the Woodshop Lab as seen from the Storage Mezzanine

LGI Room

Final touches being completed in the LGI Room

Main Stairwell

The “hat” or temporary floor built in the 2nd Floor Main Stairwell

Existing Building Renovation

Drywall finishing is ongoing in the Culinary Arts classroom

Existing Building Renovation

Framing, drywall, and MEP work ongoing outside of the Culinary Dining Area

Phase 3 Construction

Subsurface soil stabilization in progress for future Auditorium area

New Feb. 2018 Traffic Pattern

Upcoming Work• Punch List – Phase 1• Kitchen / Cafeteria• Asbestos abatement • Foundations – Phase 3• North Building Demo

Project Stats• Safety = 84 Days with

Zero Recordable Accidents

Schedule• North Abatement = On Schedule• South Abatement = On Schedule• Area F1/F2 = Mid March turn over