Spherical Tanks Erection Procedure

TRANSCRIPT

Yl. L-)r s-{- c.'y'DARYA PALA Eng. Co.

]ONTROLLEDDOCUMENT

:HECKED

:OR INFORMATION.ORFASRICATION

:ORERICTION

:OR PURCHASING:ORUSE

qSBUILD

0 FIRST ISSUE Mohammadi Moosavi H.Vanaki

REV DATE DESCRIPTION PREP./DESIGN CHECKED APPROVED

OIVNFR: g.figRt

N.t.G.C.NATIONAL IRANIANGAS COMPANY

DOCUMENT No. :PC EC TAG DIS TP SN HIRBODAN EPC CO.037 TK 3710 ME PR 003PROJECT NAME :

ILAM GAS TREATING PLANTSPHERICAL STORAGE TANKS CONTRACTOR

DOC. NAME :ERECTION PROCEDURE

SPHERICAL TANKS

ITEM NO/S TK-3710 A/B/C/D

:RICTION

]UALN CONTROL

:O[,IMERCIAL

]LIENT

Y OF AZARAS ND CO (AIC)

VAT. ENG.

ilffiI ueslcx c ENc. DEPr.

AZARAB wousrruxco

Azar Ab Ref. No. CUSTOMER JOB No. ]ETAILENG.

r'ESSELTEQUIP,2

DOC. No.vH-v0434101-tto3

File Name: Page Rev.r'ESSELAEQUIP,l

JRO PLANNINGAZARAIJ PROJECT No.

v0431 r 'z / g 0

qRCHIVE

]ECIPIENTS

AZAR-AB INDUSTRIES DOC NO.: vH-V043-0101-003

II,AI4 SPHERE_

TABLE OF CONTENTS

1 General

2 Foundation

3 Erection

Pagd 2/9

AZAR-AB TNDUSTRTES DOC NO.: VH_V043-0101-003ILAM SPHERE-

1- GeneralThis procedure applies to field erection work of 1047 m3 spherical tanksTK-3710 NBICID at ILAM GAS TREATING PLANT.All field erection shall be performed strictly in accordance with the drawingsapproved by the owner.

2- FoundationBefore erection work of tanks, Foundation shall be checked by the tank builderin accordance with field in specific manual. lf there were some obstracles ontank erection, such foundation should be repaired by foundation constructor.

3- Erection

3.1-The erection sequence shall be as follows:- Lower part of columns on the foundations.- Equator plates with upper columns.- Intermediate equator plates.- Bottom crown plates.- Top crown plates.

3.2-Prior to the erection of column, the level of foundation shall be adjustedto the specified level with shim plate. The clearance between foundationand column base shall be concreted before the hvdrostatic test.

3.3-Erection of lower columns.During erection of lower column, level and plumpness shall be checked.(note: The reference point shall be marked before erection, thispoint shall be determined from top of column.(FlG. 1)

3.4-Allowable tolerance of plumpness and level of each columns is asfollowing:

Plumpness : H/500 mm(Plus/Minus)Level : 3 mm(Plus/Minus)

P a g e ' 3 / 9

AZAR-AB INDUSTRIES DOC NO.: VII-V043-0101-003II,AM SPHERE-

3.5-Erection of equator plate with upper column.- Prior to the equator plate erection, erection tools must be installed. And

then staging shall be installed on the equator plates.typical layout is shown in FIG.2, but shape, number & location oferection tools may be changed if necessary.

- Two plates with upper column (Marked A) shall be erected.- The intermediate plate without upper column (Marked B) shall be erected.- Follow the same procedure for the remaining equalor plates.- After erection of the eouator olates inside diameter "D" shall be checked.

the out of roundness shall not exceed 1% of the nominal diameter shownin drawing (FlG. 3).

3.6-Erection of bottom and top crown plates.- Each bottom and top crowns consist of seven plates.- the adjacent plates (marked C) shall be assembled prior to 3 remaining plates.- the plates (marked D) shall be assembled prior to erection of center plate.

P a g e ' 4 / 9

AZAR-AB XNDUSIRXES

FIG, 1

DOC NO. : Vrr-V043-0101-003

Paqe 5/9

AZAR-AB IIIDUSTRIES DoC NO.: VH-V043-0101-003rr.Al,t SPHERE- ---!--------

AZAR-AB IIIDUSTRIES DOC NO.: vH-V043-0101-003rLAId SPEERE-

F IG , 3

Pag€ 7/9

AZAR-AB INDUSIRIES DOC NO.: VA-V043-0101-003IIAM SPIIERE-

FIG. 4

Page 8/9

AZAR-AB rNDusrRrEs Doc No': vH-V043-0101-003

II,AM SPHERE-

- F I G ' 5 ,Pasa 9/9

- t -