south elevation 1:200€¦ · and british standard (bs en 12056-3: 2000) elsa rhs elevation form...

Post on 06-Feb-2021

5 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

  • Elsa RecyclingElsa RecyclingElsa Recycling

    neighbouring commercial unit

    U1

    render

    render

    profiled metal profiled metal

    New profiled cladding to

    reformed gable end.

    existing profiled cladding

    front gable retained

    New access

    from Durham st

    Durham Street

    terraced residential

    Station Rd.Make good existing brickelevation to retained

    staircase area.

    STATION ROAD ELEVATION

    Remove two storey

    brick building to form

    access.

    500

    diff

    Elsa Recycling

    New Profiled

    metal cladding

    New profiled metal

    cladding to reformed solid

    blockwork gable end of U1

    Cement

    render finish

    existing

    corrugated

    sheets

    Existing

    door

    40

    00

    4.0m high

    acoustic

    fence

    Internal wall to include full

    height 100mm block wall

    over cladd 120mm Knauf

    or similar approved (16.12

    kg/m2) insulation with

    profiled metal cladding to

    external face.

    New Cement

    render finish

    existing

    corrugated sheets

    F.G.L

    Rear of

    Carna

    Road

    neighbouring unit

    block up

    existing doorway

    form new

    ramp

    New access from

    Durham st

    Unit 1OfficeBlock

    REAR ELEVATION ELSA AND CLIMAX WORKS

    Form new external wall to existing

    warehouse following demolition of

    section of warehouse to create

    access route and ramp.

    finished floor level 500mm lower

    existing ramped

    access retained

    Existing

    door

    Durham St

    corrugated asbestos roof retained

    existing cement sheet

    New cement

    render finish

    making good to

    staircase

    New profiled metal

    cladding to retained Unit

    10 elevations

    New profiled metal

    cladding to retained Unit

    elevations

    Existing two storey brick building retained

    corrugated asbestos roof retained

    Removal of a single bay

    portal frame to Unit 1

    gable and make good

    Make good existing brick

    elevation to retained two

    storey building.

    CLIMAX WORKS LHS ELEVATIONTypical view from from rear of Carna Road

    Concrete Works

    Existing

    concrete

    fence

    acoustic fence

    40

    00

    New

    door

    New

    RWP

    New

    RWP

    40

    00

    New

    door

    New

    RWP

    New

    door

    New

    RWP

    baler conveyor hatch New profiled metal cladding to

    retained Sections of Unit 1

    baler outlet

    existing corrugated asbestos roof

    cement sheet

    Make good retained building elevation

    including new profiled metal cladding

    to retained sections existing units

    New profiled metal

    cladding to retained

    sections existing units

    Retain existing brick

    elevations

    New

    door

    New

    RWP

    New

    RWP

    New

    RWP

    CLIMAX WORKS RHS ELEVATION 1:200

    Concrete Works

    Existing concrete

    fence

    Typical view from from

    rear of Carna Road

    Full length acoustic fence

    New

    door

    New

    RWP

    New

    door

    New profiled metal

    cladding to retained

    sections existing units

    40

    00

    Full length acoustic fenceFull length acoustic fence

    40

    00

    40

    00

    500

    diff

    Existing UnitsSection

    Elsa Recycling

    New Access

    Route

    New profiled cladding to

    reformed gable end.

    Existing two storey brick building retained

    New insulated

    Access Up & Over

    Doors

    Make good existing brick

    elevation to retained

    staircase area

    Existing shutter

    4.0m high

    acoustic fence

    F.G.L

    Rear of

    Carna Road

    UNIT 1 FRONT ELEVATION OFFICE BLOCK FRONT ELEVATIONELSA TYPICAL SECTION

    U1

    40

    00

    Install aluminium gutters and

    downpipes sized in accordance

    with the Approved Document H

    and British Standard (BS EN

    12056-3: 2000)

    ELSA RHS ELEVATIONform new ramped access

    into existing elsa unit and

    install roller shutter door

    ELSA LHS ELEVATIONForm new external wall

    to existing warehouse.

    Job Description:

    Site Reconfiguration

    DWG Title:

    PROPOSED ELEVATIONS

    Drawn:

    Date:

    Checked:

    Scale:

    Job Number:

    DWG Number:

    DWG Reference:

    Property Address:

    Client: Elsa Recycling Group

    1:200 on A1

    269 - DWG

    Climax Works

    Station Road Industrial Estate

    Stockport

    SK5 6ND

    Units 1 - 3 Station Road

    Station Road Industrial Estate

    Stockport

    SK5 6ND

    013

    June 2020

    LPM PWM

    269

    MGRA CONSULTING LTD

    346 DEANSGATE

    MANCHESTER

    M3 4LY

    Contact us

    Tel: 0161 835 9936

    Twitter: @MGRAConsulting

    © MGRA Consulting Ltd:Reproduction is prohibited in whole or in part without the

    express agreement of MGRA.

    SOUTH ELEVATION 1:200

    NORTH ELEVATION 1:200

    WEST ELEVATION 1:200

    EAST ELEVATION 1:200

    SOUTH ELEVATION & SECTIONS

    EAST ELEVATION 1:400

    WEST ELEVATION 1:400

    Rev A: August 2020 :Baler access points

    AutoCAD SHX TextALL BOARDS SUPPLIED AT 4.8m Lg END BOARDS CUT TO 2.4m Lg BOARD JOINS ARE STAGGERED & ARE CO-INCIDENT WITH POST POS'NS

    AutoCAD SHX TextALL BOARDS SUPPLIED AT 4.8m Lg END BOARDS CUT TO 2.4m Lg BOARD JOINS ARE STAGGERED & ARE CO-INCIDENT WITH POST POS'NS

    Sheets and Views269-13 PElevSymbols

top related