Solution – Hotel
Content
1. Company description
2. Requirements
3. Specification
4. How does the solution look like?
5. Controls
6. Customer benefit
7. Costs
8. Summary
2 © Hoval / Mar-14 Hoval
The company
Jolie Ville Hotels
(former Mövenpick Jolie Ville)
Founded 1991 in Aegypten
Owner buys the brand Jolie Ville from Mövenpick and
starts expansion
Today cooperation with the German Hotel chain Maritim
3 © Hoval / Mar-14 Hoval
The company
International Congress Center (Sharm) 2006
© Hoval / Mar-14 Hoval 4
The company
Golf Hotel (Sharm): 1998 hot water and 2006 steam
system
© Hoval / Mar-14 Hoval 5
The company
Resort and Casino – Naama Bay (Sharm) 1990 ModulPlus
© Hoval / Mar-14 Hoval 6
Requirements
Efficient hot water and steam system (Split)
for expansion of Jolie Ville Hotel in Luxor – Kings
Island
400 additional rooms
Pool heating
Replacement of 42 electric heated tanks
Pool boiler house stand-by
Very tight time schedule: Finishing of the complete
project by X-mas (Guests have already bookings!)
Proofed system
Quality - Safety
4 © Hoval / Mar-14 Hoval
Description
Hot water system: 3-zones
Zone 1: 5 Bungalows and 3 Villas
Zone 2: 5 Bungalows
Zone 3: 34 Villas
21 existing Bungalows Replacement of 42 DHW-tanks
New pool with boiler, heat exchanger and filters
Steam system for most modern laundry
8
© Hoval / Mar-14 Hoval
Plant description
6 © Hoval / Mar-14 Hoval
Solution?
2 x THD-U 3000 11bar
7 © Hoval / Mar-14 Hoval
Solution?
Armatures steam header and steam reducing stations
11 © Hoval / Mar-14 Hoval
Solution?
12
2 x THW-I 45/35 NTE
6bar
6 x Modul-Plus F52
Correx
Expansions System
pumpen 264 m3/std
40m Höhe
PLC - Steuerung
© Hoval / Mar-14 Hoval
Hoval System Solution (P&ID)
8 © Hoval / Mar-14 Hoval
Hoval System Solution (P&ID
heat exchanger
14 © Hoval / Mar-14 Hoval
Hoval System Solution (P&ID)
steam boiler plant
15 © Hoval / Mar-14 Hoval
Hoval System Solution (Controls)
9 © Hoval / Mar-14 Hoval
Main Display of Touch Panel S7-200
17 © Hoval / Mar-14 Hoval
Benefit
Easy design "turnkey" solution
Time-saving
Low risk
Hotwater boilers THW-I 45/35 and
hotwater suppy devided in 3 zones:
Very high operating reliability
No interruptions
Hoval system One-stop solution
Time-saving thanks to easy projecting
16 © Hoval / Mar-14 Hoval
Investment cost
Total investment cost (exw) EUR 852‘000,--
Consisting of:
- 2 x THW-I 45/35 NTE 6bar
- 2 x THD-U 3000 E 11bar
- 6 x Modul Plus F52 Correx solution
- 2 x THD-U 3000 E 11bar (Sharm El Sheik)
19 © Hoval / Mar-14 Hoval
Conclusion
© Hoval / May-11 22
Competence as solution supplier
Hoval