1
MW Site CompletionReport
Site ID (Near end): 0078
Site ID (Opposite end): 0390
Site Name: Kamran chowrangi
Region: Karachi
Project: MW South
Submission Date: 26-09-2013
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 2/19
2
About This cument:
This document is intended to regulate the site installation documents at each step of a microwave project
specify the quantity and format of output documents at each phase and provide guide lines on the integrity
and specification of output documents.
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 3/19
3
Table of Contents
Link Budget.......................................................................................................................... 4
Board Plan ........................................................................................................................... 5
Media Plan .......................................................................................................................... 5
SW Commissioning ............................................................................................................. 6
HW Installation Pictures ................................................................................................... 08
MW Installation Check list ................................................................................................ 11
Confirmation Check List …………………………………………………………………………………………..….15
1- Link Budget
Designed RSL: -39.24(dBm) Tx Power: 20.0(dBm)
Achieved RSL: -41.2(dBm) Tx Frequency:15047.0/ 14557.0(MHz)
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 4/19
4
S-KHI-0078 S-KHI-0390
Elevation (m) 63.67 46.31 Latitude 24 55 39.10 N 24 56 32.30 N
Longitude 067 07 50.40 E 067 11 57.30 E True azimuth (°) 76.69 256.72 Vertical angle (°) -0.16 0.12
Antenna model A15D12HS A15D12HS Antenna height (m) 25.00 25.00 Antenna gain (dBi) 42.60 42.60
Circ. branching loss (dB) 3.60 3.60
Frequency (MHz) 15000.00 Polarization Vertical
Path length (km) 7.12
Free space loss (dB) 133.04 Atmospheric absorption loss (dB) 0.20 Field margin (dB) 1.00
Net path loss (dB) 56.24 56.24
Radio model 15G_HP_128Q_28M_159M 15G_HP_128Q_28M_159M TX power (watts) 0.10 0.10 TX power (dBm) 20.00 20.00
EIRP (dBm) 59.00 59.00 Emission designator 28M0D7W 28M0D7W
TX Channels 24B28H 15047.0000H 24B28L 14557.0000H 24B28H 15047.0000V 24B28L 14557.0000V
RX threshold criteria BER 10-6 BER 10-6 RX threshold level (dBm) -70.00 -70.00
RX signal (dBm) -39.24 -39.24 Thermal fade margin (dB) 33.76 33.76 XPD fade margin - multipath (dB) 29.07 29.07 Flat fade margin - multipath (dB) 27.80 27.80
Geoclimatic factor 1.53E-03 Path inclination (mr) 2.44
Fade occurrence factor (Po) 6.49E-03 Average annual temperature (°C) 26.00
Worst month - multipath (%) 99.99892 99.99892 (sec) 28.35 28.35
Annual - multipath (%) 99.99960 99.99960 (sec) 127.58 127.58
(% - sec) 99.99919 - 255.16
Rain region ITU Region K 0.01% rain rate (mm/hr) 42.00
XPD fade margin - rain (dB) 41.10 41.10 Flat fade margin - rain (dB) 33.03
Rain rate (mm/hr) 128.25 Rain attenuation (dB) 33.03 Annual rain (%-sec) 99.99964 - 112.06
Annual multipath + rain (%-sec) 99.99884 - 367.22
Tue, Jun 04 2013 S-KHI-0078-S-KHI-0390.pl4 Reliability Method - ITU-R P.530-12 Ran - ITU-R P530-7
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 5/19
5
2- Board Plan
Site ID: 0078
PIU-
10FAN-
11
7 CSH 8
5—IFX2->0390-V 6—IFX2->0390-H
PIU-
9
3—IFX2->0390-V 4—IFX2->0390-H
1- 2—SL1D
3- Media Plan
Route
Site ID Rout Site-1 Rout Site-2 Rout Site-3 Warid Tie
E1
4. SW Commissioning pictures
After completion of Hardware installation and Software commissioning following pictures will be required.
1. Software Commissioning (Pictures).
Main Window
(Select NE from NE Explorer >> Click Slot Layout
from main Window)
TX Frequency
(Select ODU from NE Explorer >> Click ODU
Interface>> Radio Frequency Attribute)
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 6/19
6
IF Attributes
(Select IF1A from NE Explorer >> Click IF
Attribute>> Radio Working Mode)
TX Power & RSL
(Select ODU from NE Explorer >> Click ODU
Interface>> Power Attribute)
N/A
Node Name & Node ID
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 7/19
7
(Select NE from NE Explorer >> Expend NE Configuration >> Click NE Attribute)
Cross Connections
(Please capture after expanding cross connections)
Protection (If applicable)
(Select NE from NE Explorer >>ExpendNE Configuration >> Click Cross connect Configuration)
N/A
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 8/19
8
5. MW Installation pictures
Antenna Fixing
(Must Cover antenna assembly while capturing)
ODU Fixing and waterproof
(Must cover both IF Connectors in case of 1+0)
ODU Grounding
(Show Grounding termination)
IF Cable grounding
(Show IF End)
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 9/19
9
IF Cable Grounding
(Show Bus Bar end)
IF Cable Grounding
(If Bus Bar installed)
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 10/19
10
MW Rack& DDF& DCDB
(Cover all Three in one frame) IF cableloop
(Near to ODU)
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 11/19
11
Cable Routing on Vertical Ladder
(Identify Recently Installed cable) IDU Grounding
(Cover termination end)
Near to tower brases use the mounting bracket bolts
in revarce path Use Of the labels for DC power breakers
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 12/19
12
DDF
(Identify Recently Installed cable with proper
labeling)
DCDB
(Cover your Cable connection at Breaker in right
sequence)
N/A N/A
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 13/19
13
Grounding cable should be routed & printed labeled Power cable should be routed & printed labeled
IF connector of ODU should be waterproofed and
face downward.
Mention the Faceing ID at both end
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 14/19
14
6- Microwave Installation Check List
Site Supervisor Name: Adnan Cell Number:03003672767
Signature: ____________________________ Date:_________26-09-2013___________________
mation
e ID (A) 0078 Site ID (B) 0390 Subcon Symbia
MW Design Detail Checklist
nk Type (PDH/SDH) PDH
Indoor Installations OK Not OK Remarks
19 inch Rack Installation N/A
ability of 19" Rack mounting and alignment as per drawing. N/A
oper Leveling and Drilling works N/A
oper tightening of all nuts and bolts and No nuts and bolts missing N/A
ounding Bus Bar Mounting & DCDB installation. N/A
IDU Check List
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 15/19
15
mly installed (Best suitable place) OK
ftware Check (using WEB LCT) OK
L Check & Snapshots (using WEB LCT) OK
tenuation Values & TX Power Check & Snapshots as per Link Budget OK
eck Far end Visibility (NMS) OK
oper IF Cable Connector & tightness OK
cuit Breakers of proper rating installed OK
Grounding
oper thimbles used at Grounding Bus Bar OK
rge Arrestors properly installed & grounded (If applicable) N/A
st OK Not OK Remarks
U properly grounded OK
'' rack properly grounded N/A
DF properly grounded N/A
Cable Laying/ Labeling
cables properly cut, laced and terminated OK
oper Routing of IF Cables, PCM Cables and Power Cables OK
Cables and Power Cables laid separately OK
Us properly labeled OK
e Tags used at IDU end for labeling OK
B and Circuit Breakers labeled OK
/ PCM/ Power Cables labeled OK
beling of E1 terminations done on DDFs N/A
utdoor Installations
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 16/19
16
Antenna/Mounting Works OK NOK Remarks
crowave Dish and Mounting Bracket installed properly OK
tra IF cable should be twisted to 2 or 3 circles near ODU/Antenna OK
oper weather proof taping at ODU/ Antenna side OK
tenna Water drain hole detaches rubber cap and drain hole must be at bottom OK
tenna height as per the link budget OK
Nuts and Bolts properly tightened OK
W Antenna Side Support properly mounted OK
tenna Pole Fixed Properly OK
tenna Bracket Fixed in Pole Properly OK
nnectors properly made and securely tightened OK
stec properly sealed N/A
Grounding OK NOK Remarks
oper thimbles used OK
DU properly grounded with scratched paint tower OK
Cables grounded with all outdoor bus bars available OK
ot more than one grounding termination on a single point on bus bars OK
Cable Laying/ Labeling
oper Routing of IF Cables OK
uminum tags used for labeling at ODU side for IF Cables N/A
grounding wires/ cables in downward direction from ODU/ IF Cables on tower OK
cables properly tied on tower OK
aveguide/IF cable termination (antenna to ODU/equipment side) OK
beling for each PCM cable and for each E1 N/A
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 17/19
17
Tests Performed
witch over function success N/A
/ Rx Mute function success OK
oopback success OK
ear-End loop back success OK
r-End loop back success OK
OW function success N/A
arm Generation and Reporting success OK
op visible on NMS OK
hours BERT Test N/A
tching of all E1s checked N/A
Items to be attached with Pre-PAT document OK NOK Remarks
Hours BERT Test Report N/A
nk Performance Report OK
ommissioning Documents OK
stallation Pictures (Indoor/Outdoor) OK
L & Configuration Snapshots (tx power, attenuation etc.) OK
ard Inventory Information OK
0- House Keeping
e properly cleaned OK
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 18/19
18
quipment Serial #
IDU ODU HYBRID DISHite A
ite B
REMARKS
TP done
7. Confirmation Check List
Item Description Yes No Remarks
Combine PR Received (BTS+MW) NO
Site RFI checked and confirmed to Project Team for
equipment delivery, NO
DN received before equipment delivery, Yes
8/13/2019 Site Compeletion Report 0078
http://slidepdf.com/reader/full/site-compeletion-report-0078 19/19
19
Combine Equipment received at site (BTS+MW), YES
Link Budget, Board plan & Media plan was shared before
team movement, YES
Missing Equipment reported timely YES
top related