since 1975 since 1975. step 1 foundation foundation

Post on 26-Mar-2015

237 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Since 1975Since 1975

Step 1Step 1

FoundationFoundation

4 X 8 Foot Panels4 X 8 Foot Panels

Chalking Base ChannelChalking Base Channel

Installing RedheadsInstalling Redheads

Engineering, Designing, Shipping!Engineering, Designing, Shipping!

Bolting The RoofBolting The Roof

Nothing Faster Or Easier!Nothing Faster Or Easier!

Elite Prefab Addition Kits for developers, Elite Prefab Addition Kits for developers, do it yourselfers & contractors.do it yourselfers & contractors.

You can build an addition out of a You can build an addition out of a material as resistant as block, as material as resistant as block, as

versatile as wood and faster, easier versatile as wood and faster, easier plus, allot more economical to build.plus, allot more economical to build.

We will be glad to address your questions, answered on the phone or in person.We will be glad to address your questions, answered on the phone or in person.

http://www.ElitePrefabHomes.comhttp://www.ElitePrefabHomes.comJoel Leitson President Joel Leitson President Elite Prefab Homes Inc.Elite Prefab Homes Inc.17051 Northeast 23rd Ave.17051 Northeast 23rd Ave.Suite 1 FSuite 1 FMiami, Florida. 33160Miami, Florida. 33160Joel@ElitePrefabHomes.comJoel@ElitePrefabHomes.comOffice = 305 897 2899Office = 305 897 2899Cell = 786 704 2878Cell = 786 704 2878

top related