What is Formwork,Shuttering, Centring,

Scaffolding and Staging

Formwork All Arrangements Made to Contain and Support the

liquid Slurry in building construction Project Till The Time it Hardens Enough to Support Itself and Take the Desired Shape is Called Formwork.

Cenetring• It is That Part of Formwork Which Supports the

Horizontal part of Surface. Like Beam Bottom, Slab Bottom

Shuttering • It is That Part Of Formwork Which Supports

and Holds Vertical Part of Formwork. Like Beam Side,Slab Side,Column Side

Scaffolding It is Temperory Structure Created to Make a Plateform

for Men to Work at Heights and Hold the Materials at Heights.

Staging A Base Created to Hold Shuttering and Centring in

Construction. It could Be Props, Cuplocks, or Wooden Ballies to hold Shuttering and Centtring at Heights.