Shoreline Master Program Update
Shoreline Master Program Update: Process Overview
City of Benton CityAugust 30, 2012
1
Shoreline Master Program Update
Agenda• What is an SMP?• How long will it take?• What are the steps?• What are your visions for the future of Benton
City’s shorelines?
2
Shoreline Master Program Update
3
Shoreline Management Act (SMA)RCW 90.58
To prevent harm caused by uncoordinated and piecemeal development of the state’s major shorelines
Shoreline Master Program (SMP) GuidelinesWAC 127-26
SMP--Carries out provisions of SMAMust be approved by Dept. of Ecology, using policy of RCW
90.58.020 and Guidelines as approval standards/criteria
Shoreline Master Program Update
Key Principles of the SMP• Balance
—Environmental protection—Public access—Water-oriented uses
• Preferred Uses• No Net Loss of Ecological Function
4
Shoreline Master Program Update
Updated Shoreline Jurisdiction
• Stream flows ≥ 20 cubic feet per second
• Upland areas 200 feet from ordinary high water mark
• Floodways and adjacent floodplain area
5
Shoreline Master Program Update
Steps and Status
Inventory&
Analysis
SMP- Environment Designations- Goals- Policies- Regulations
Cumulative Impacts Analysis
Local Adoption
Restoration Plan
Determine Jurisdiction
Ecology Review and Adoption
Public Participation
6
Shoreline Master Program Update
SMP Contents• Environment Designations• General Provisions
—e.g., critical areas, flood hazard reduction, public access, vegetation conservation
• Shoreline Modifications —e.g., shoreline stabilization, dredging
• Shoreline Uses —e.g., residential, recreational, transportation
7
Shoreline Master Program Update
Inventory Topics• Jurisdiction
—Proposed Shoreline Management Area
• Natural Environment
8
—Soils—Geology—Floodplain & Wetlands—Landslide and Seismic
Hazard Areas
—Priority Habitats/Species and Fish Distribution
—Vegetation—Shoreline Ecological Function—Restoration Opportunities
Shoreline Master Program Update
Inventory Topics• Built Environment
9
—Comprehensive Land Use Designations
—Zoning—Current Land Use—Sanitary Sewer System—Surface Water System & Outfalls—Impervious Surfaces—Shoreline Modifications
—Public Access—303d Listed Waters &
Permitted Sites • Other
—Reach Map
Shoreline Master Program Update
Restoration Actions• Can be important for no net
loss• Can include watershed level
improvements• Can include program and
voluntary actions• Can serve as source of
required mitigation measures when there are shoreline impacts
Types of Opportunities
• Enhancement of riparian vegetation
• Address possible sources of fecal coliform contamination
10
Shoreline Master Program Update
11
Targeted Workshop Dates• August 30, 2012 – SMP process overview • October 25, 2012 – Visioning workshop• November 20, 2012 – Goals, policies, and regulations
workshop• January 24, 2013 – Review draft SMP• March 28, 2013 – Revisit draft SMP, cumulative impacts,
and restoration• May 23, 2013 – Planning Commission recommends SMP
to City Council
Shoreline Master Program Update
Key Public Participation Milestones• Shoreline Visioning – October 25, 2012• Draft SMP Workshop – January 24, 2013• Hearings and Local Adoption – Late Spring 2013
12
Keep Informed• Attend public meetings and workshops• Learn about Benton City’s shoreline• Ask questions and provide comments
Shoreline Master Program Update
Discussion Questions• Public access• Shoreline use• Restoration
• How do you currently use Benton City shorelines?
• What additional or improved public access could be provided?
• What future uses you would like to see along Benton City shorelines?
• What shoreline areas should be: Protected? Restored?
13
Shoreline Master Program Update
Contact Information:Ben Floyd, Anchor QEA
509-392-4548bfloyd@anchorqea.com
Ferdouse Oneza, Oneza & Associates509-845-2453
foneza@onezaassociates.com
14
top related