…sharing knowledge

Post on 07-Jan-2016

34 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

AQUARIUS ENGINEERS PVT . LTD. PRESENTS - PowerPoint PPT Presentation

TRANSCRIPT

…Sharing knowledge

PRESENTS CONCRETE PUMPING SOLUTION FOR HIGH RISE AND LONG DISTANCE PUMPING WITH 1407 D HR CONCRETE PUMP…………….

…Sharing knowledge

1407 D HR

AQUARIUS 1407 D HR IS MARKET LEADER IN IT’S CLASS, IT IS SUITABLE FOR HIGH RISE AND LONG DISTANCE PUMPING WITH LOW MAINTAINANCE COST AND WITH HIGH FUEL EFFICANCY…………..

…Sharing knowledge

…Sharing knowledge

Very Comfortable Operations up to

200 meter VerticalOr

800 meter Horizontal.

Practically Achieved 165 meter vertical and

800 meter long distance Concrete

Pumping.

Does BIG Work; Eats lesser Fuel. 6 to 7 liter per Hour with 135 kw

Big Engine

SAVE FUEL with AQUARIUS 1407D HR

…Sharing knowledge

PROJECT DETAIL

CLIENT:-DELHI METRO RAIL CORPORATION LTD,NEW DELHIPROJECT:- AIRPORT METRO EXPRESS LINE (AMEL),DELHI IGI AIRPORT TO NEW DELHI RLY STATION. CONTRACTOR:- RELIANCESUB CONTRACTOR:- KALINDEE RAIL NIRMAN (ENGINEERS) LTD.CONTACT PERSON:- MR. SULABH RAWAT

(Chief Project Manager) 09990299912 MR.ARIF KHAN(Chief Engineer) 09313210834

OUR CUSTOMERS NAME:- (1)KALINDEE RAIL NIRMAN (ENGINEERS) LTD. MACHINE 1407D, SR. NO. 2108250514 (2) N.S. CONCRETE PVT. LTD. MACHINE 1407 D HR, SR. NO. 2110250727CONTACT PERSON:- MR. ANOOP ARORA (OWNER)

Mb. No.09971690103

…Sharing knowledge

M/s Kalindee Rail Nirman Engineers Ltd. has requirement of a Concrete pump who has able to pump the concrete 800 mtr horizontal practically, to complete the project of Delhi Metro’s Airport Express Line, Track concrete (inside the tunnel), with in a very short and bounded time period due to Common Wealth Game in Delhi. . In this connection M/s N. S Concrete has purchased the AQUARIUS machine 1407 D HR & given to M/s Kalindee Rail Nirman on hire basis.

PROJECT SUMMERY

…Sharing knowledge

ACHIEVMENTWith the help and support of M/s Aquarius Machine and Aquarius Service team efforts, customer has achieved great success. Airport Exp. Line Project completed before it’s time. Practically achieved 800 mtr horizontal pumping without any problem. The persons of M/s N.S. Concrete Pvt. Ltd. and M/s Kalindee Rail Nirman (Engineers) Ltd. both were happy with machine’s performance and service support . Due to the high achievement of machine performance and service support they have issued performance and appreciation certificates also. AQUARIUS MOTO

CUSTOMER SATISFACTION

AQUARIUS TEAM IS ALWAYS READY FOR SUPPORT ………

…Sharing knowledge

PERFORMANCE CERTIFICATE REECIVED FROM MR. ANOOP ARORA (OWNER) OF M/S N.S.CONCRETE, GURGAON,DELHI NCR.

…Sharing knowledge

PERFORMANCE CERTIFICATE REECIVED FROM MR. SULABH RAWAT (CPM) OF M/S KALINDEE RAIL NIRMAN (ENGINEERS) LTD.,DELHI NCR.

…Sharing knowledge

APPRICIATION CERTIFICATE REECIVED FROM MR. SULABH RAWAT (CPM) OF M/S KALINDEE RAIL NIRMAN (ENGINEERS) LTD.,DELHI NCR.

Successfully Pumped the concrete with 800mtr Horizontal pipe line in Delhi Metro Air Port to New Delhi Railway Station Tunnel Work.

…Sharing knowledge

800 mtr Horizontal pipe length

1407 HRD Inside the Tunnel With 800 meter Horizontal pipe line Metro Tunnel

AQUARIUS 1407 D Upper Pump with 200mtr horizontal+30 meter Downward Pipeline

Concrete Pipe Line Diagram (New Delhi Site)

1407 D

1407 D HR

Successfully Pumped the concrete with 800mtr Horizontal pipe line in Delhi Metro Air Port to New Delhi Railway Station Tunnel Work.

…Sharing knowledge

800 mtr Horizontal pipe length

1407 HRD Inside the Tunnel With 800 meter Horizontal pipe lineMetro Tunnel

AQUARIUS 1407 D Upper Pump with 250mtr horizontal+30 meter Downward Pipeline

Concrete Pipe Line Diagram (Shivaji Stadium Site)

Double stage pumping

1407 D HR

1407 D

…Sharing knowledge

Slurry Mix Design a) Cement - 150Kgb) Fly Ash - 300Kgc) Natural Sand -75Kgd) Water - 140Litree) Admixture - 1.5litref) Water / Cement

Ratio - 0.31

NOTE: - This slurry was very good & very thick like honey.

…Sharing knowledge

M - 35 Concrete Mix Design with fly ash (Rich Concrete)

a) Cement - 380Kgb) Fly Ash - 100Kgc) Natural Sand - 622Kgd) 20mm - 650Kge) 10mm - 434Kgd) Water - 172Litere) Admixture - 5.760literf) Water / Cement Ratio - 0.35g) Slump – 190-200mm (In the Plant) M- 35 Concrete Mix Design without fly ash a) Cement - 410Kgb) Fly Ash - Nilc) Natural Sand - 755Kgd) 20mm - 644Kge) 10mm - 430Kgd) Water - 164Litere) Admixture – 4.700literf) Water / Cement Ratio - 0.40g) Slump – 190-200mm (In the Plant)

…Sharing knowledge

ACTUAL SITE PHOTOGRAPHS 1407D HR INSIDE THE TUNNEL

CONCRETE FLOW AT END WITH 800 MTR HORIZONTAL LINE

…Sharing knowledge

AQUARIUS ENGINEERS PVT. LTD.H.O. “AQUARIUS”,Sheelavihar Colony , Off Karve Road, Pune 411038. INDIATel.:+912025445227 Fax:+912025445228E-mail: info@aquariusengineers.biz Web:www.aquariusengineers.bizDelhi Office.:AQUARIUS ENGINEERS PVT. LTD.D- 155,First Floor ,Okhla Industrial Area ,Phase I ,Behind Honda Showroom ,New Delhi 110020.INDIATel.:+011-32928709 Fax:+011-41716963E-mail: delhi@aquariusengineers.biz Web:www.aquariusengineers.bizMfd.by: Putzmeister India Pvt. Ltd.190,191,Kundaim Industrial Estate, Ponda , Goa 403115 India.Tel.:+91 0832 239 6334 Fax.:+91 0832 239 6253

FOR ANY QUARY PLEASE FELL FREE TO CONTACT.

…Sharing knowledge

THANK YOU

…Sharing knowledge

top related