session 4a ndpl ajai nirula[1]
Post on 08-Apr-2015
110 Views
Preview:
TRANSCRIPT
Capacity Building for Distribution System
North Delhi Power Limited
A Tata Power and Govt. of Delhi Joint Venture
Ajai Nirula (Head-Operations)
Hotel Le Meridian, DELHI19th Aug’2009
2
Structure of Presentation
• Delhi Reform Framework
• Profile of NDPL & Background
• Strategic Road Map and Key Strategic Decisions
• AT & C Loss Reduction – Initiatives
• Results & Recognition
• Challenges Ahead
• Suggesions
Delhi Reform Framework
Holding Company (DPCL)
GENCOIndraprastha
Power Generation
Company Ltd.
TRANSCODelhi Transco
Limited
DISCOM-IBSES Yamuna Power Limited
DISCOM-IIBSES Rajdhani Power Limited
DISCOM-IIINorth Delhi
Power Limited
GoNCTD
Delhi Vidyut Board (DVB)Assets
Liabilities & Equity
1. All the assets and liabilities of DVB are acquired by GoNCTD
2. All the liabilities of DVB are transferred to Holding Company, entire Equity of Holding Company is issued to GoNCTD
3. All the assets are transferred from GoNCTD to successor entities.
4. Equity and Debt in the successor entities is issued in favor of the Holding Company.
privatization - effective July 2002 License – Till 2029
51% Equity by Private Players
Business Model During Transition Period
Revenue from retail
supply
(Less due to present losses)
Loan From Government
The Transitional Support
to make up loss
Payment to GENCO TRANSCO
Balance amount for Bulk Supply Purchase
(DISCOM’s Paying capacity)
Expenses and return
Expenses – approved by Regulator
Return – Guaranteed – 16%
DISCOM
Financial Support Pre-estimated & Capped at Rs 3,450 Cr by GoNCTD to DTL over the
Five Years Transition Period Vs Rs 1,200 Cr. Gap / Annum
5
Geographic Description
NDPL
BSES
Rajdhani
BSES
Yamuna
NDMCMES
Joint Venture of TATA Group with Delhi Govt.
51:49%
NDPL Profile
Turnover (FY 08-09) : ~ Rs. 2,478 Cr
Peak Load : 1212 MW
Energy Requirement (FY 08-09) : 6,325 MUs
Total Registered Consumers : 10.2 Lakh
Number of Employees : 3,751
Area of Distribution : 510 Sq Kms
Population Serviced (approx) : 48 Lakh
Per Capita Consumption (Units) : 1,395 (National Average of 500,
Mumbai – close to 850)
Number of Consumers / Sqkm : 2,000 (Only Registered)
Employees / MU input : 0.6
Load / Energy Growth : 07% / 05%
6
7
Strategic Challanges: For 2002 - 07
Strategy for 2002-07
AT&C
Losses
<25%
Consumer
service & IT
Interface to
be
comparable
with world
standards
System
Reliability to
be
comparable
with best
utilities in
India.
Performance
Orientation
through
Change
Management
Strategic Decisions:
• Decentralization of O&M : zones / districts / circles
• Centralization of Commercial processes & Consumer
Services
• Commercial Business Processes Re-engineered
• CAPEX Program of Approx. Rs. 2000 Crore till FY 2008-09
(Load Growth, Loss Reduction, System Improvement &
Infrastructure Development)
• Network & Process Automation Road Map defined
(SCADA, GIS, GSAS……..)
8
Initiatives
• State of the Art Power System Control set up
• Dedicated Infrastructure for each of the Zones and Grids &
maintenance planning through ERP with tracking
• Cable jointing outsourced to OEM’s (Mahendra / Raychem).
• Call center enhanced for answering 100% complaints.
• SMS based system for quicker Fault Management / escalation.
• 24x7 Mobile Maintenance & Breakdown crews.
9
Contd…
• Technology intervention for fault diagnosis and Residual Life Assessment.
• All Substations Revamped & Automated between 2003 to 2005.
• State of the Art Ring Main Units installed for moving the trippings out of the Grid stations for integrated protection & isolation to lower level.
• Replacement of Old Electro-mechanical Meters by New Electronic Meters
• Energy Accounting through Consumer Indexing (DT Wise) & DT indexing (11 KV Feeder Wise)
• Automatic Meter Reading (AMR) initiated for High Revenue consumers. Presently ~ 30,000 Nos.
11
HVDS
(11/6.35)
High Loss
High
Resistance
Areas
Implemented in more
than 150 areas &
ongoing.
~ 600 Ckt KMs
High Loss
Low
Resistance
Areas
LT ABC
Schemes implemented
& ongoing.
~ 1800 Ckt. KMs
Metering
Solutions
Electronic
Meters, AMR,
Pre-Paid
Metering
Electronic meters
replaced, AMR 30K,
Prepaid GOI etc.
AT & C Loss Reduction Strategy – Technical Intervention
• Electrification by using LT ABC
• Metering Arrangement – Split / Group metering (Pole /
Plinth mounted)
• Area Management – Through Franchisee (3 Nos.)
• Monthly Fixed Charge
• Provision of Incentive / penalty
12
J J Cluster / Slum areas
13
Workforce Management System
Call Received
at Call Centre
Consumer
informed & Call
closed
Complaint
attended & Call
Centre
informed
SMS Sent to
field crew
K. Kalra
32 Rohini
No Current
15minsSMS Based
Fault
Management
System
Significantly
reduced the fault
Restoration time
14
Network Cleaning – LT Lines
What was… What is…. Project Last Mile
15
Power Supply Improvement – LT Cables / FP / SP
BEFORE AFTER
Package Substation / HVDS
16
17
Power Supply Improvement - CENNET
Distribution Automation through SCADA
SCADA (A Snap Shot of Control Room)
18
Grid Station Automation System (GSAS)
New Panels Old Panels
19
20
Power Supply Improvement – Grid Stations
Unmanned Automated 66 kV, 33 kV Grid Stations
21
CMG RRG RDGMRG RBG RCGMMG
RAG
Policy Regulatory Bench Data Revenue Infrastructure
Advocacy Compliance Marking Analysis Protection Support
Consumers
Call
Center
Customer
Care CenterWebsite E mail Letters
Drop
boxes
SAMBANDH – Integrated Commercial Package software
Business Process Re-engineering (BPR)
CCG
22
Payment Avenues – Consumer Centricity
• Payment Avenues increased from 20
to 1100+ now.
• State of the art Collection centers
instituted with all civic amenities.
• Payment of Energy Bills through
Website also (by Credit Cards) -
Website Certified as secured by
‘Verisign’.
• Consumer Comfort –
Automatic Cash / ChequeCollection machines (12x7)
23
Upgraded Consumer Care Infrastructure
State-of-the -Art Collection Center Consumer Care Centre
Enterprise GIS
OMS
Network Analysis
DMS
SCADA
CRM
ERP
GIS - System Integration
The GIS centric system
integration makes use of
location specific information
through other systems.
System Integration majorly
requires:
Sharing attribute
information with other systems
like CRM and ERP.
Data delivery to other
systems like DMS and OMS
24
25
Saving to Government – The Victory Curve
Increase in NDPL paying capacity reduced TRANSCO dependence on Govt.
Domestic Tariff same since Jul 04.
Cumulative Savings in tune of Rs. 4187 Cr.
AT&C Loss Reduction – Saving to Government
Results – Few other parameters
Parameters Before
Takeover
At present
Operational Parameters
Capital Investment (Rs Crores) 1,210 Add. 2000
Transformer Failures w.r.t Installed Capacity (%) 11 ~1
Percentage Share in Load Shedding (In Delhi) 40 ~ 2
Commercial Parameters
Average Days for New Connection Energization (Days) 51.8 8.0
Number of Electronic Meters - All 10 Lacs
% Provisional Billing 22.5 < 1
DT – Wise Energy Auditing (%) - 100
Special Courts (Nos) - 2
AT&C Losses (%) 53 15
26
Challenges Ahead
Segregation of Challenges Strategic Challenges
Business Challenges
Power Availability at competitive cost
Reduction in AT&C Losses (overachievement of
regulatory targets)
Uninterrupted & Quality power supply
Enhancing Public perception with regard to service
delivery
Regulatory uncertainty
Operational Challenges
Performance based regulation
Cost control in line with MYT Targets
Competitive scenario post 2007 for high end consumers
HR ChallengesCost Saving Vs Quality of Man-Power
Talent Management for the future competitive scenario
•BA man-power quality
•Safety
•Multi-cultural integration
•Inter-regional corridor constraints
Power Procurement : Started 01-04-2007
• Interesting facts in Aug’09
Out of 96 time slots of 15 min each for a day, increase in
demand w.r.t 08-09 up by average 35% and 50-55% in
some slots.
Increase in demand w.r.t previous day (upto 20-27% in
many slots)
Average energy consumption per day in 09-10 is ~ 22%
higher w.r.t. last FY
Average Peak Demand is ~30% higher w.r.t last FY
Approx. 15 MUs purchased through power exchange at
rates between Rs. 4.50 to 15.43 per unit
• Power Procurement (Bilateral, Banking, Power Ex.) in 09-
10 ~ 580 MUs Approx. 20% of total power consumption in 09-10
29
Awards & Recognition - To name a few
National Award for Meritorious Performance
For Years 2004-2005, 2005-2006 & 2007-08
30
Edison Electric Institute (EEI) 2008 - Edison Award for
Implementation of Geographic Information Systems (GIS)
Award Bestowed For “ Distinguished Leadership, Innovation and Contribution
to the Advancement of the Electric Industry for the Benefit of All”
Awards & Recognition - To name a few
31
Thank You