SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT
17.2.4 GS9 CONSTRUCTION AND OPERATION OF 1-OCTENE 3 PLANT
13 JUNE 2019
CONFIDENTIAL
WSP Environmental (Pty) Ltd.
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT
17.2.4 GS9 CONSTRUCTION AND OPERATION OF 1-OCTENE 3 PLANT
SASOL CHEMICAL OPERATIONS:
SOLVENTS DIVISION
TYPE OF DOCUMENT (VERSION)
CONFIDENTIAL
PROJECT NO.: 41101534
DATE: JUNE 2019
WSP
BUILDING C
KNIGHTSBRIDGE, 33 SLOANE STREET
BRYANSTON, 2191
SOUTH AFRICA
T: +27 11 361 1392
F: +27 11 361 1381
WSP.COM
Q U A L I T Y M A N A G E M E N T
ISSUE/REVISION FIRST ISSUE REVISION 1 REVISION 2 REVISION 3
Remarks Draft for Review –
Compliance Audit
EA Ref: 17.2.4 GS 9
Final – Compliance
Audit
EA Ref: 17.2.4 GS 9
Date April 2019 June 2019
Prepared by Bronwyn Fisher Bronwyn Fisher
Signature -
Checked by Ashlea Strong Ashlea Strong
Signature
Authorised by Jenny Cope Jenny Cope
Signature
Project number 41101534 41101534
Report number 016 016
File reference file:///W:\000 NEW Projects\41101534 - Sasol EA and EMP Audits\42 ES\2-REPORTS\
S I G N A T U R E S
PREPARED BY
-
Bronwyn Fisher
Environmental Consultant
REVIEWED BY
Ashlea Strong
Principal Consultant
This Compliance Audit report (Report) has been prepared by WSP Environmental (Pty) Ltd (WSP) on behalf
and at the request of Sasol Synfuels: Secunda Operations (Client), to provide the Client with an understanding
of their compliance with the conditions included in the Environmental Authorisation.
Unless otherwise agreed by us in writing, we do not accept responsibility or legal liability to any person other
than the Client for the contents of, or any omissions from, this Report.
To prepare this Report, we have reviewed only the documents and information provided to us by the Client or
any third parties directed to provide information and documents to us by the Client. We have not reviewed any
other documents in relation to this Report, except where otherwise indicated in the Report.
P R O D U C T I O N T E A M
CLIENT
SHE: Environmental Compliance
Specialist
Broni van der Meer
Solvents Production Senior Manager,
Secunda Chemicals Operations
Adriaan Lambrechts
WSP
Associate Jenny Cope
Lead Auditor Anri Scheepers
Lead Auditor Ashlea Strong
Consultant Bronwyn Fisher
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
TABLE OF CONTENTS
1 INTRODUCTION ........................................ 1
1.1 Terms of Reference ................................................. 1
1.2 1-Octene 3 Plant (SASOL CHEMICAL
OPERATIONS: SOLVENTS DIVISION)
(Authorisation Number: 17.2.4 GS 9) .................... 1
2 AUDIT SCOPE ........................................... 3
3 AUDIT METHODOLOGY ........................... 4
3.1 Audit Checklist ........................................................ 4
3.2 Site Inspection ......................................................... 4
3.3 Documentation Considered ................................... 4
3.4 Audit Compliance Assessment .............................. 5
3.5 Audit Team ............................................................... 6
3.6 Assumptions and Limitations ................................ 6
4 AUDIT FINDINGS ...................................... 8
5 SUMMARY OF THE AUDIT FINDINGS ... 19
5.1 Environmental Authorisation ............................... 19
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
TABLES
TABLE 1: COMPLIANCE LEVEL DEFINITION AND TARGET COMPLETION DATES .................. 5
TABLE 2: AUDIT FINDINGS – ENVIRONMENTAL AUTHORISATION ......................... 8
TABLE 3: SUMMARY OF EA COMPLIANCE AUDIT FINDINGS ........................ 19
FIGURES
FIGURE 1: LOCATION OF THE 1-OCTENE 3 PLANT (RED BLOCK) (SOURCE: GOOGLE EARTH, 2018) ............... 2
FIGURE 2: NUMBER/COUNT CONTRIBUTION OF FINDINGS MADE TO THE EA CONDITIONS PER SECTION ............................ 20
FIGURE 3: OVERALL COUNT FINDINGS ON COMPLIANCE TO THE EA CONDITIONS .............................. 20
FIGURE 4: PERCENTAGE CONTRIBUTION OF FINDINGS MADE TO THE EA CONDITIONS PER SECTION ..... 21
FIGURE 5: OVERALL PERCENTAGE FINDINGS ON COMPLIANCE TO THE EA CONDITIONS ................ 21
APPENDICES
A ENVIRONMENTAL AUTHORISATION (17.2.4 GS 9)
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 1
1 INTRODUCTION
1.1 TERMS OF REFERENCE
Sasol South Africa (Pty) Limited operating through its Secunda Synfuels Operations (Sasol) appointed WSP
Environmental (Pty) Ltd (WSP) as an independent environmental consultant, to undertake a compliance audit
and compile an audit report according to the requirements of the National Environmental Management Act (No.
107 of 1998) as amended (NEMA). This report presents the findings of the compliance audit completed for the
Environmental Authorisation (EA) (Reference number: 17.2.4 GS 9 issued on 23 November 2005) for the
period for the period December 2014 to February 2019.
1.2 1-OCTENE 3 PLANT (SASOL CHEMICAL OPERATIONS:
SOLVENTS DIVISION) (AUTHORISATION NUMBER:
17.2.4 GS 9)
The Octene plant process several feed streams to produce 1- Octene. The plant consists of the following
sections:
— Train 1
— Train 2
— Train 3
1-Octene 3 Plant (Figure 1) has three different heptene-containing streams, which are fed to the Plant, namely:
— Octene Train 1 pre-fractionator overheads, which is acid-free;
— Octene Train 2 pre-fractionator overheads, which contains acids; and
— Hexene Train 1 and 2 de-heptaniser column distillate, which is acid-free.
The acid-containing feed from Octene Train 2 undergoes a water wash in order to extract acids prior to feed
fractionation. The acid-free streams, however, are routed directly to the feed fractionation section. In total there
are 10 processes in the plant, namely acid removal, feed fractionation, modified-rhodium hydroformylation,
hydrogenation, alcohol fractionation, dehydration, product work-up, product polishing and a hot oil system.
The output streams from 1-Octene 3 Plant are:
— 1-octene final product;
— By-product streams to the Synfuels Refinery; and
— By-product wash water stream to Chemical Work-up
The construction and operation of the 1-Octene 3 Plant was granted authorisation on 23 November 2005
(Reference number: 17.2.4 GS 9).
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 2
Figure 1: Location of the 1-Octene 3 Plant (red block) (Source: Google Earth, 2018)
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 3
2 AUDIT SCOPE The 7 April 2017 amendment to the Environmental Impact Assessment (EIA) regulations introduced the
requirement for the auditing for all EAs and EMPrs in effect on 8 December 2014 and submission of audit
reports to the Department of Environmental Affairs (DEA) by 7 December 2019 and every five years thereafter.
This audit is designed to meet the requirements of Regulation 34 of the EIA Regulations, 2014.
The audit period runs from December 2014 to February 2019, therefore any construction related conditions that
would have been relevant pre-December 2014 are considered not applicable (outside audit period).
The objective of the audit was to:
— Assess the level of compliance with the conditions of the EA;
— Identify and assess any new impacts and risks that result from undertaking the activity;
— Make recommendations in order to achieve compliance in terms of the EA; and
— Ensure the commitments contained in Condition 7.1 of the EA are completed, more specifically:
— “Records relating to the compliance and non-compliance to the conditions of this authorisation must
be kept in good order. Such records must be made available to this Department within five (05)
working days from the date of a written request by the Department for such records”.
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 4
3 AUDIT METHODOLOGY The International Organisation of Standardisation (ISO) 14010, ISO 14011 and ISO 14012 guideline documents
were utilised as a template during the compliance audit process. This methodology ensures that the compliance
audit was conducted in a systematic and independent manner that was documented and objectively evaluated to
determine compliance to the EA conditions.
The audit process comprised the following:
— Confirmation of the audit checklist;
— Site inspection (14 March 2019);
— Review of documentation relevant to the conditions of the EA (e.g. records, permits/certificates/maintenance
logs/monitoring results/previous reports etc.); and
— Compilation of an audit report.
3.1 AUDIT CHECKLIST
WSP compiled an audit checklist to assist with the EA compliance audit (Section 4).
3.2 SITE INSPECTION
Bronwyn Fisher conducted the site inspection on 14 March 2019. The findings and observations of the site visit
are recorded and summarised in Section 4 with evidence included in Table 2. Key personnel interviewed
included:
— Nivashnee Francois (Production Area Manager Octene 3).
3.3 DOCUMENTATION CONSIDERED
The following documentation was provided and considered:
— Solvents_EA_17.2.4.GS.9_1_Octene_3b_2005-11-23;
— SCO DQS ISO 14001 2015;
— 2018 DQS 3rd Party Audit Report_Sasol Secunda Chemicals Operations;
— 1.3.1 APPA Registration Review;
— 1.3.1 Environmental Legal Compliance;
— 1.3.1 Hazardous Chemicals and Substances;
— 1.3.3 Environmental Report-Noise Survey;
— 1.3.3 Health Impact Assessment;
— APPA Registration Certificate;
— AEL Sasol Solvents 0017-2015-F02 (2015);
— EA_EX Handover_SCO_Solvents_SAF_OC3;
— 3.2 Ambient Air Quality Data;
— Progress report for FY19 SCO Sampling Plan_04 - rev 20190219;
— SCO Atmospheric Emission Monitoring Schedule;
— 3.3 Process Description;
— 3.4_17.2.4.GS.9_1_Octene_3b_HIA_2007-07;
— Induction_Mod3_Environment;
— Induction_Mod4_ProcessSafetyManagement;
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 5
— Induction_Mod5_WorkPlaceSafety;
— Induction_Mod6_EmergencyManagement;
— Octene III_SAS490_2017-06-15;
— Waste Management Procedure_SGR-SHE-000017_Rev10_2017-09;
— 3.8 Bundwall Procedure;
— 3.8 Operational Procedures;
— 3.9 Requirements for site location;
— SA Regional Procedure - Generic SHE Training.docx Rev.01 July 2018;
— Labour_SasolSupplierLocalRecruitment_2018-08;
— Labour_Sasol IRM Suppliers Industrial Relations Procedure;
— Air Quality Management;
— 5.1 Bundwall Procedure;
— IWWMP SIC 2015 Final_2018-05-15;
— 5.1 Water Management;
— Environmental Complaints Register_2019-02-18; and
— Various email correspondence.
3.4 AUDIT COMPLIANCE ASSESSMENT
WSP utilised a pre-prepared audit checklist to assist with the audit execution (Table 2). The checklist included
the conditions and associated requirements as specified in the EA.
Each condition was verified, either by reviewing documentation, interviewing employees and/or visually
inspecting the facility. Each condition was rated in accordance with Table 1 below, and recommendations with
associated target completion dates included.
It should be noted that some of the EA conditions were apportioned according to the elements requiring
compliance assessment therein. Although some elements of the condition may have been compliant, if one of
the elements was determined to be non-compliant, the entire condition has been reported as such (and counted
as such during percentage compliance calculation). This apportionment further allowed for the development of
focussed recommendations and timeframes.
Table 1: Compliance Level Definition and Target Completion Dates
COMPLIANCE LEVEL DEFINITION
Compliant (C) Sasol could provide evidence for compliance with the commitment and condition and/or
relevant actions were implemented.
Non-compliant (NC) Specified commitments, conditions and documents were not in place or implemented
according to the requirements of the EA. Non-complaint conditions are given target
completion dates, as follows:
— Short term: 0 – 6 months.
— Medium term: 6 – 12 months.
— Long term: 12 – 18 months.
Not applicable (N/A) These are commitments are either not required yet or not applicable to Sasol.
— Conditions marked as “Noted” are considered information points only.
— Where conditions are considered “not auditable” within the scope of this assessment this
is stated and explained within the condition commentary.
Refer to Section 4 for the detailed audit findings (including evidence, recommendations and target completion
dates).
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 6
3.5 AUDIT TEAM
The Auditor, Bronwyn Fisher, was hosted by Broni van der Meer and Nivashnee Francois to whom we express
our gratitude for their time and attention during our visit. A brief summary of the external auditors’ experience
is provided below.
— Auditor: Bronwyn Fisher
Bronwyn Fisher has 6 years of experience as an Environmental Consultant, undertaking Environmental
Impact Assessments (EIAs) and Basic Assessments. She has experience in developing Environmental
Management Programmes (EMPrs), undertaking site audits (ECO), Water Use Licence Applications and
undertaking Public Participation. Bronwyn’s project experience includes construction of pipelines, diesel
storage installations, waste disposal sites, water treatment facilities, oil refineries, tank farm installations,
recycling facilities, mixed-use developments, industrial developments and renewable energy technology
projects.
— Lead Auditor and Quality Assurance: Ashlea Strong
Ashlea has 16 years’ experience and holds a Masters in Environmental Management; a BTech (Nature
Conservation), and a National Diploma (Nature Conservation); She is also a Certified Environmental
Assessment Practitioner of South Africa (CEAPSA). She currently provides technical and strategic
expertise on a diverse range of projects in the environmental management field, including environmental
scoping and impact assessment studies, environmental management plans, waste and water management, as
well as the provision of environmental management solutions and mitigation measures. She has been
involved in the management of a number of large EIAs within South Africa and has environmental auditing
and training experience and expertise. Ashlea has carried out over 50 compliance audits and is well versed
in the audit process.
— Project Manager and Quality Assurance: Jenny Cope
Jenny is an environmental due diligence specialist, with over 11 years’ experience in the Environmental
Sector. Jenny’s experience includes managing and completing projects and portfolios internationally;
undertaking both detailed and broad Environmental, Health & Safety compliance and audits of across a
range of sectors. Jenny’s recent experience includes completion and management of several pan-European
and global projects requiring reviews of extensive virtual data rooms, on a very rapid turnaround, and
providing clients with ‘red flag’ reports to give clear commercial advice. Jenny has worked both in
environmental consultancies and with a developer, giving context to understanding the practicalities of
implementing recommendations.
3.6 ASSUMPTIONS AND LIMITATIONS
This Report has been prepared by WSP on behalf and at the request of Sasol, to provide the Client an
understanding of the Relevant Documents.
Unless otherwise agreed by us in writing, we do not accept responsibility or legal liability to any person other
than the Client for the contents of, or any omissions from, this Report.
To prepare this Report, we have reviewed only the documents and information provided to us by the Client or
any third parties directed to provide information and documents to us by the Client. We have not reviewed any
other documents in relation to this Report and except where otherwise indicated in the Report.
The findings, recommendations and conclusions given in this report are based on the author’s best scientific and
professional knowledge, as well as available information. This report is based on survey and assessment
techniques which are limited by time and budgetary constraints relevant to the type and level of investigation
undertaken; WSP and its staff reserve the right to modify aspects of the report including the recommendations if
and when new information may become available from on-going research or further work in this field, or
pertaining to this investigation.
Although WSP exercises due care and diligence in rendering services and preparing documents, WSP accepts
no liability, and Sasol, by receiving this document, indemnifies WSP and its directors, managers, agents and
employees against all actions, claims, demands, losses, liabilities, costs, damages and expenses arising from or
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 7
in connection with the services rendered, directly or indirectly by the use of the information contained in this
document.
This report must not be altered or added to without the prior written consent of the author. This also refers to
electronic copies of this report which are supplied for the purposes of inclusion as part of other reports.
Similarly, any recommendations, statements or conclusions drawn from or based on this report must make
reference to this report. If this report is used as part of a main report, the report in its entirety must be included
as an appendix or separate section to the main report.
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 8
4 AUDIT FINDINGS Table 2: Audit Findings – Environmental Authorisation
REF: COMMITMENT COMPLIANCE FINDING RECOMMENDATION
1. GENERAL CONDITIONS
1.01 This authorisation refers only to the project specified above
and described in Record of Decision. Separate applications
must be lodged for any other development and /or activity at
or near the proposed development, which is covered by
Section 21 and 22 of the Act and Government Notice R1182
of 5 September 1997.
N/A Noted. Sasol advised the auditor that they are aware of this
condition, and no subsequent development that would require
separate authorisation has commenced.
None.
1.02 Authorisation is only granted in terms of Section 22(3) of the
Environment Conservation Act, No. 73 of 1989 and does not
exempt the holder from compliance with any other relevant
legislation.
N/A Noted. A full legal review does not form part of the scope of this
Audit.
The site is operated under ISO14001:2015, which requires the
compilation of a legal register. Furthermore, WSP has been
provided with the 2018 ISO audit for review, which specifically
states “the development of the compliance risk management
protocol (CRMP) to assist the organization to reach a higher level
of legal compliance is commendable”.
Evidence:
— SCO DQS ISO 14001 2015;
— 2018 DQS 3rd Party Audit Report_Sasol Secunda Chemicals
Operations
None.
1.03 Ensure that the necessary permits/approvals and/or service
and/or lease agreements, where it is relevant, from or
between the following institutions are in place:
1.3.1 CAPCO
1.3.2 DWAF
C Sasol provided the auditor with the proof of the APPA permit as
well as the AAPA permit review and the exiting AEL. In addition,
Sasol have engaged with the Department of Water and Sanitation
(DWS), formally known as DWAF, and have a Sasol Secunda
Integrated Water and Waste Management Plan (IWWMP) which
has been issued to DWS. A Health Impact Assessment was also
None.
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 9
REF: COMMITMENT COMPLIANCE FINDING RECOMMENDATION
1.3.3 Provincial Department of Health
1.3.4 Department of Labour
undertaken for the 1-Octeme Train 3 and submitted to the
Department of Health as part of the EIA process.
Evidence:
— 1.3.1 APPA Registration Review;
— 1.3.1 Environmental Legal Compliance;
— 1.3.1 Hazardous Chemicals and Substances;
— 1.3.3 Environmental Report-Noise Survey;
— 1.3.3 Health Impact Assessment;
— APPA Registration Certificate;
— AEL Sasol Solvents 0017-2015-F02 (2015).
1.04 This Department may change and/or amend any of the
conditions in this authorisation if, in the opinion of the
Department, it is environmentally justified.
N/A Noted. Sasol have confirmed that, to their knowledge, no
conditions within the EA have been changed or amended.
None.
1.05 A copy of this authorisation must be available at the
premises of the applicant at all times and all staff,
contractors and sub-contractors shall be acquainted with the
contents of the authorisation.
C Copies of all authorizations and licences are sent to, and details
communicated with, relevant business units. Copies of these
documents are also available at the SHE: Environment department
and on SAP EC and SharePoint. Sasol provided the auditor with
the evidence that the responsible persons, Francois du Plessis
(Senior Manager of SAFOL & Octene 3 Production) and Willem
Jacobs (legal appointee of Solvents), were made aware of the EA
on in September / October 2016.
Evidence:
— EA_EX Handover_SCO_Solvents_SAF_OC3
None.
1.06 The contents of this authorisation must be known to all
interested and affected parties within five (5) days from the
date of authorisation.
N/A This condition is considered outside of the audit period
(construction pre-2014). It is therefore considered not applicable.
None.
1.07 The applicant must advertise this ROD in a local newspaper
within five (05) days after the issue of this authorisation. N/A This condition is considered outside of the audit period
(construction pre-2014). It is therefore considered not applicable.
None.
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 10
REF: COMMITMENT COMPLIANCE FINDING RECOMMENDATION
2. ESTABLISHMENT OF THE ENTERPRISE
2.01 This authorisation is repealed if the proposed 1-Octene Plant
has not been constructed within two (2) years from the date
of the authorisation.
N/A This condition is considered outside of the audit period
(construction pre-2014). It is therefore considered not applicable.
None.
2.02 In case of closure of the site, this Department will evaluate
and monitor and approve the closure and rehabilitation plan
of the site.
N/A Noted. Sasol advised that there are no plans to make this site
redundant in the foreseeable future.
None.
3. CONSTRUCTION AND OPERATION
3.01 Any emissions levels of the pollutants (NOx, SO2,
H2S,VOC, PM2.5 and PM10) must be approved by CAPCO
before construction and operation commences.
N/A This condition is considered outside of the audit period
(construction pre-2014). It is therefore considered not applicable.
None.
3.02 Monitoring of ambient air quality and characterisation of
pollutant concentrations for the entire Sasol Complex must
be carried out in order to assess the cumulative pollutant
concentrations and its impact on the receptor areas (Sasol
Complex, Secunda, eMbalenhle, etc.)
C Sasol makes use of an integrated approach to air quality
management as governed by National Environmental
Management: Air Quality Act. Sasol works closely with the local
authority and operates units in line with the relevant AEL and
minimum legal emission requirements.
The auditor was informed that continuous ambient air quality
measurements are done at two monitoring station (Secunda Club
and Langverwacht) which are close to the Secunda and
eMbalenhle residential areas respectively. Ambient air quality is
also managed within the Secunda Complex.
All monitoring data is stored on the Sasol IMS and on the
Sharepoint.
Evidence:
— 3.2 Ambient Air Quality Data
— Progress report for FY19 SCO Sampling Plan_04 - rev
20190219
None.
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 11
REF: COMMITMENT COMPLIANCE FINDING RECOMMENDATION
— SCO Atmospheric Emission Monitoring Schedule
3.03 The dispersion potential of the pollutants must be measured
and characterised in various receptor areas (Sasol Complex,
Secunda, eMbalenhle, etc.
C Sasol makes use of an integrated approach to air quality
management as governed by National Environmental
Management: Air Quality Act. Sasol works closely with the local
authority and operates units in line with the relevant AEL and
minimum legal emission requirements.
The auditor was informed that the dispersion potential was
calculated as 5km and was included in the AEL application.
Evidence:
— 3.3 Process Description
None.
3.04 The adverse human effects that may be caused by the
proposed development including emissions of pollutants
must be documented and be made available to this
Department when needed.
C Sasol provided the auditor with the Health Impact Assessment,
dated July 2017. The impact assessment deals only with the 1-
Octene Train 3.
Evidence:
— 3.4_17.2.4.GS.9_1_Octene_3b_HIA_2007-07
None.
3.05 Workers must be made aware of the harmful effects of
emissions and must be trained on the dangers and safety
measures that must be taken should such a situation arise.
C Every person entering the Sasol site is subject to a SHE induction
process to ensure that all persons are familiar with the Safety,
Health & Environmental aspects and requirements of that
site/plant.
In addition, there is specific induction training for entry into the
Sasol Solvents Operational areas. No unaccompanied person or
unauthorised person will be allowed access to the solvents area
without undertaking solvents induction training. Sasol advised the
auditor that the training includes risks associated with working in
the solvents area, operational and emergency procedures.
Evidence:
— Induction_Mod3_Environment;
— Induction_Mod4_ProcessSafetyManagement;
— Induction_Mod5_WorkPlaceSafety;
None.
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 12
REF: COMMITMENT COMPLIANCE FINDING RECOMMENDATION
— Induction_Mod6_EmergencyManagement.
3.06 All waste material must be placed in suitable containers and
disposed of in a suitable site C The auditor was advised that waste management is completed via
implementation of a Waste Management procedure (SGR-SHE-
000017 REV10) that addresses the approach to manage waste in
line with the internationally accepted waste hierarchy, whereby
disposal to land is considered the last management option to
undertake once avoidance, re-use, recycling, recovery and
treatment options have been considered / eliminated. The
procedure further details waste disposal and management through
characterisation and classification that is detailed in site specific
waste registers.
Waste Registers were made available to the auditor. A sample of
the registers specifically related to the facility operations were
checked during the audit. All hazardous waste streams are disposed
of at Holfontein Hazardous Landfill Site, with the exception of
certain spent catalysts which are collected by external service
providers (such as Golden Pond) and are processed to recover
metals from the spent catalyst.
Evidence:
— Octene III_SAS490_2017-06-15;
— Waste Management Procedure_SGR-SHE-
000017_Rev10_2017-09.
None.
3.07 A suitable ablution facility for workers must be provided
during construction. N/A This condition is considered outside of the audit period
(construction pre-2014). It is therefore considered not applicable.
None.
3.08 Bunded areas and a fast drainage system must be put in place
to recover feed, chemicals, solvents, products, and by-
products during loading and off-loading
C The auditor noted that the plant, including the loading and off-
loading zone is sufficiently bunded with a fast draining system to
ensure that any spilled substances is cleared quickly. Sasol have
developed a bundwall procedure for the 1-Octene 3 Plant, which
has been reviewed by the auditor.
The 1-Octene 3 Plant is situated inside the Sasol Primary area,
which is served with an Oily Water Sewer (“OWS”) and a Clean
None.
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 13
REF: COMMITMENT COMPLIANCE FINDING RECOMMENDATION
Stormwater Sewer (“CSS”), which comprises a set of open drains,
canals and pipelines to collect process effluents generated in the
different manufacturing processes, and to collect contaminated
surface run-off.
Evidence:
— 3.8 Bundwall Procedure;
— 3.8 Operational Procedures;
— IWWMP SIC 2015 Final_2018-05-15;
An example of bunding at the loading/ off loading zone
at the Octene Storage Tank farm.
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 14
REF: COMMITMENT COMPLIANCE FINDING RECOMMENDATION
An example of the OWS within the Octene plant.
3.09 Fire-fighting equipment must be installed according to
relevant legislation on the proposed site. C The auditor observed a number of fire hoses and extinguishers
located around the plant. In addition, Sasol have installed a fire
deluge system across the complex.
Evidence:
— 3.9 Requirements for site location
None.
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 15
REF: COMMITMENT COMPLIANCE FINDING RECOMMENDATION
An example of a fire extinguisher within the Octene
plant.
3.10 Local labour and local materials, where possible must be
used. C Sasol advised the auditor that it has implemented a Supplier
Industrial Relations Procedure (SIRP) that aims to provide the
greatest degree of uniformity, consistency and to standardisation of
procedures and practices pertaining to security / site access and
Industrial Relations matters to all Suppliers, their Agents, Sub-
contractors and Labour brokers/TES. Suppliers are required to
ensure that the SIRP, its procedures and practices are
communicated, understood, observed and followed by them and all
their constituents at all times. Non-compliance with the procedure
may result in the termination of the commercial agreement
between the parties. The procedure covers the preference for local
labour.
Evidence:
None.
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 16
REF: COMMITMENT COMPLIANCE FINDING RECOMMENDATION
— SA Regional Procedure - Generic SHE Training.docx Rev.01
July 2018;
— Labour_SasolSupplierLocalRecruitment_2018-08;
— Labour_Sasol IRM Suppliers Industrial Relations Procedure.
3.11 If any changes need to be made to the site and/or associated
infrastructure, this Department must be informed thirty (30)
days in advance, to be able to decide whether the changes
need authorisation.
N/A Noted. Sasol advised the auditor that no changes have been to the
development or associated infrastructure.
None.
4. AIR POLLUTION
4.1 The necessary air permits must be obtained and forwarded to
this department before the plant is put in operation. N/A — This condition is considered outside of the audit period
(construction pre-2014). It is therefore considered not
applicable.
None.
5. WATER POLLUTION
5.1 Any pollution of the surface as well as groundwater must be
prevented at all cost. C Sasol have an Integrated Waste and Water Management Plan
(IWWMP) which aims to identify the activities related to Sasol’s
operations within the context of the receiving environment (with a
focus on water resource protection), identify the risks associated
with these operations, and subsequently manage these risks by
means of an action plan committed to by Sasol management.
In addition, the plant was designed and operated in accordance
with the 1-Octene 3 Plant bundwall procedure.
Surface water monitoring is done on a weekly basis as well as real
time for the various Receiving Environmental Surface water
Monitoring points (RESMs).
Ground water monitoring is conducted biannually and quarterly.
The is no groundwater monitoring specific to the 1-Octene 3 Plant,
however there are 6 active boreholes located within the Primary
area which are utilised for monitoring. The auditor note a number
of exceedances in the November 2017 sampling run, however
None.
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 17
REF: COMMITMENT COMPLIANCE FINDING RECOMMENDATION
these exceedances cannot be directly attributed to 1-Octene 3
Plant.
In addition, all staff, contractors and visitors are provided with
induction training, which includes pollution of the environment.
Evidence:
— 5.1 Bundwall Procedure;
— IWWMP SIC 2015 Final_2018-05-15;
— 5.1 Water Management.
6. MONITORING
6.01 The Department of Health, DWAF, Department of Labour
and the CAPCO will further monitor compliance to this
authorisation.
N/A Noted. Sasol advised the auditor that they are aware of this
condition.
None.
7. REPORTING
7.01 Records relating to the compliance/non-compliance with the
conditions of the authorization must be kept in good order.
Such records must be made available to this Department
within five (5) working days of the date on a written request
by the Department for such records.
N/A This audit represents the first required audit for this Exemption.
Prior to the introduction of the 7 April 2017 amendment to the
Environmental Impact Assessment (EIA) regulations, no audit
against this Exemption was required.
None.
7.02 Non-compliance with, or any deviations from the conditions
as set out in the authorisation, is regarded as an offence and,
after reasonable provision has been made for remedial
action, will be dealt with in terms of Sections 29, 30 and 31A
of the Act.
N/A Noted. Sasol have advised the auditor that they are aware of this
condition.
None.
7.03 Any complaints regarding the said development must be
brought to the attention of the Department within 24 hours
after receiving the complaint.
C The auditor has reviewed the complaints register maintained by
Sasol. No complaints have been received in relation to the
operating of the 1-Octene 3 Plant for the audit period.
None.
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 18
REF: COMMITMENT COMPLIANCE FINDING RECOMMENDATION
Evidence:
— Environmental Complaints Register_2019-02-18
7.04 A complaints register must be kept up to date for inspection
by members of this Department. C The auditor has reviewed the complaints register maintained by
Sasol. No complaints have been received in relation to the
operating of the 1-Octene 3 Plant for the audit period.
Evidence:
— Environmental Complaints Register_2019-02-18
None.
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 19
5 SUMMARY OF THE AUDIT FINDINGS
5.1 ENVIRONMENTAL AUTHORISATION
The audit findings have been summarised into the following categories: compliance, non-compliance and not
applicable. The overall audit findings concerning compliance to the EA conditions are as listed in Table 3
below.
Table 3: Summary of EA Compliance Audit Findings
SECTION OF THE EA NO. COMMITMENTS C NC N/A
GENERAL CONDITIONS 7 2 0 5
ESTABLISHMENT OF THE ENTERPRISE 2 0 0 2
CONSTRUCTION AND OPERATION 11 8 0 3
AIR POLLUTION 1 0 0 1
WATER POLLUTION 1 1 0 0
MONITORING 1 0 0 1
REPORTING 4 2 0 2
Total Count 27 13 0 14
Total Percentage 48% 0% 52%
Percentage Compliance with Applicable Conditions 100%
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 20
Figure 2 illustrates the number/count contribution of the findings of the EA per section while Figure 3 presents
the total proportion of compliance for the facility.
Figure 2: Number/Count contribution of findings made to the EA conditions per Section
Figure 3: Overall count findings on compliance to the EA conditions
0
2
4
6
8
10
12
Sectional Count Contribution
C
NC
N/A
13
0
14
Total Compliance
C
NC
N/A
ENVIRONMENTAL AUTHORISATION COMPLIANCE AUDIT REPORT Project No. 41101534 SASOL CHEMICAL OPERATIONS: SOLVENTS DIVISION
WSP June 2019
Page 21
Figure 4 illustrates the percentage contribution of the findings of the EA conditions. Figure 5 presents the total
percentage compliance for the facility.
Figure 4: Percentage contribution of findings made to the EA conditions per Section
Figure 5: Overall percentage findings on compliance to the EA conditions
0102030405060708090
100
Sectional Percentage Contribution
C
NC
N/A
48%
0%
52%
Total Percentage Compliance
C
NC
N/A
APPENDIX
A ENVIRONMENTAL AUTHORISATION
(17.2.4 GS 9)