Sarasota Memorial HospitalCampus Improvement Plan
Neighborhood Advisory Council October 12, 2010
Construction Update
Project Phasing 1 & 2: Demolish CEP, Pre-Moves, New Garage Entry/Exit
Demolish Old CEPTemporary Entry/Exit at Waldemere Garage
Central Receiving Complete – 1-Waldemere
New CEP Completed
Information Systems Complete – 5-Service
Wound Care – 2-Waldemere
Observation Complete – 9-East
Surgery/CS Vertical Expansion
On-Call – 4-Central
Interim Moves for Surgery Support & Pathology
Temporary ECC Turn-around & Canopy
Temporary Main Entrance Canopy
2
Legend: Green box means that portion will be completed in that phase. Beige box is ongoing.
2
Project Phasing 3 & 4: Temporary Drive, Complete Fall 2010
Temporary ECC Turn-around & Canopy Complete
Wound Care – 2-Waldemere
Surgery/CS Vertical Expansion
Moves for Surgery Support & Pathology Complete
Sitework & Temporary Drive
Demolish Portion of Critical Care Tower
3
Legend: Green box means that portion will be completed in that phase. Beige box is ongoing.
3
Temp Main Entry Turn-around & Canopy
On-Call 3-East
Project Phasing 5: Demolish Northeast Wing and Main Entry, Begin Bridge
Sitework & Temporary Drive
Temp Main Entry Turn-around & Canopy
ECC Vestibule, Canopy and Drop-off Complete
Demolish Northeast Tower Main Entry Canopy
Structure for Bridge, Elevator & Stair
Surgery/CS Vertical Expansion
4
Legend: Green box means that portion will be completed in that phase. Beige box is ongoing.
4
Project Phasing 6: Patient Tower Foundations, South Connector
Complete Winter 2010 - 2011
Surgery/CS Vertical Expansion & Connector to So. Garage
New Patient Tower Foundations
Structure for Bridge, Elevator & Stair
5
Legend: Beige box is ongoing.
5