risk management tips for completing risk registers
Post on 08-Jan-2018
223 Views
Preview:
DESCRIPTION
TRANSCRIPT
Risk ManagementTips for completing risk registers
Donna Dark, Manager Risk and Performance
June 2009 reports- timeframe• Are due Monday 15 June by 4pm to Manager Risk
and Performance. • This means you need to get the registers to your
Area Operations Managers by Friday 12th June 5pm so that they can check the register and discuss any issues with you that need additional information or correction, before the register is sent on for collation.
June 2009 reports-full review
• For June reports we will be reviewing the central register (what we also call our risk profile). Therefore all services and departments will need to send their complete risk register for the review.
• This means that services cannot state that they have no risks to report on, as everyone will have either risks already identified and/or new risks to report on.
• The register should include a review of central register risks (including their rating). Any local strategies used to mitigate the risk are to be included.
• Risks relevant or unique to the service only, and new risks not previously identified on the central register should also be included.
Central Register-location
• The central register can be located at:
W:\Risk Management\Central Risk Register\CentralRisk RegisterJul08.doc
Report process• The register needs to be sent to your Area
Operations Manager in electronic format, using either the risk register (Form 630) or the excel sheet. Form 630 is in the forms register.The excel sheet can be found at:W:\Risk Management\risk register example 2008.xlsHardcopy faxed/mailed will not be accepted. If you are unable to complete and send your register electronically, you will need to discuss administration assistance with your Area Operations Manager before the due date.
Feedback from reports received so far
• In general, report content is improving considerably each quarter.
• However, there are some areas of confusion. The information provided in this presentation is expected to assist services in successfully completing their risk register and quarter risk reports on an ongoing basis.
Tip 1Be familiar the Risk Management ManualIt is available on the Intranet, and you have received a copy from your training. Get it out when you are completing risk assessments and the risk register.
Tip 2Risk Categories-check the definitions before you use the category.
Tip 3- complete a risk assessment form
• Risk assessment forms help you clarify the issue, and give you room to write down all relevant information about the risk.
• The risk register is supposed to just be a summary. You can be more brief in this (ie dot points) and refer to your completed risk assessment for more information (eg refer to risk assessment WBG0109 for more info).
• If you are an IT whiz, you can even store your completed risk assessment forms (either scanned in or completed electronically) in the same folder and hyperlink the assessment forms to your register.
The risk assessment form
All risks initially assessed as moderate or above should have a risk assessment completed.
Tip 4-clarify the risk issue
• Think about what the issue is, and then what the risk is.
• For example, the issue is:“ Trees might fall in the village”
• The risk is:“ Risk of property damage/injury to persons (from falling trees)”
Tip 5 Use the risk rating description, not just the number
CONSEQUENCE
Insignificant1
Minor2
Moderate3
Major4
Catastrophic5
LIKELIHOOD
Almost Certain5 Significant Significant High High High
Likely4 Moderate Significant Significant High High
Possible3 Low Moderate Significant High High
Unlikely2 Low Low Moderate Significant High
Rare1 Low Low Moderate Significant Significant
When completing your risk register, describe the risk rating using the words in the risk rating table, not the number you have calculated.
Tip 6- share your knowledgeYou could work as a team across your area group, and:1. Select a central risk that you will work on2. Work through the central risk using a risk
assessment form3. Summarise this on your risk register4. Place your risk register in an agreed place on the W
drive so that your colleagues can use this information and adapt it for their registers.. and provide you with their examples.Also look at new risks identified by others and consider whether they could be relevant for you (eg snakes, fire risk, loss of key personnel).
Tip 8 -Completing Form 630
• The following slide provides a summary of what to think about when completing the risk register.
Completing the risk registerIdentify the risk, not just the issue.
You can also put a
register number in
here.
What are we already doing to control the
risk?
Rate the risk using the table-
put the rating
description, not a
number.
What else could be done to control the
risk?
See the mitigation
table to work out the grade
(A,B,C)
Who is responsible to oversee that the controls occur?
Do they know about the risk? Have they been part of the
assessment process?
The risk that is left after all possible
controls implemented. Again it is the
description, not the number
Needs to be realistic but timely according to the risk
This may be the same
person, or the
relevant senior
manager
Tip 7-Act local, think and plan global• When you identify an individual staff/resident/client
risk, try and think about this at a broader or global level.
• For example:“ A new resident has absconded from the facility 3
times using a pool gate near the southern end of the garden. Risk is resident absconding”
Could be“ Risk of injury/harm to residents with
confusion/dementia via easy access to exits”.
This way you can develop a number of strategies to assist variations of this type of risk, rather than just focusing on the one incident or specific resident.
Excel risk register
• The excel sheet asks for some more information, but is self-explanatory.
• It allows you to continue to review risks, whereas form 630 is limited in this aspect.
• If you use the excel sheet, you can send this as your report for each quarter, as it provides all information required.
• Tip for use-do not delete rows as this will disrupt the formulas used to calculate risk ratings.
Risk Register-using the excel sheet
Checklist for completing risk registerHave we:1. Reviewed all relevant risks from the central risk register?2. Assessed and documented all new or emerging risks
identified locally and/or by other services?3. Completed risk assessments for all risks with an initial risk
rating of moderate or above?4. Documented the risks on the risk register appropriately (as
provided in this presentation).5. Advised our Manager if we cannot complete the risk register
electronically before the due date?6. Provided completed risk assessments for all risks assessed
as high and significant (residual risk rating) to the Area Operations Manager?
Ongoing risk management training
• Ongoing risk management training for new and existing staff is available via the Central Training calendar.
• Site or area specific training is no longer available, as this was provided only for the implementation of the risk management framework.
• Please ensure staff requiring training are booked into central training dates.
Questions?
• Please contact your Manager in the first instance if you have any further questions.
• Good Luck and keep up the good work!
top related