RFP for Network Cabling Installation for Two-Story Building Questions and Answers
Question El Rio Response 1. Regarding Communications structured
cabling. a) Are there any speaker locations
besides the bathrooms that are hardlid?
b) In the RFP documents it is stated that El Rio will provide 2 post racks and wire management. Does that include the horizontal wire management as well?
c) Are wrap around labels required behind the faceplates and patch panels?
d) Does the cabling need to be plenum rated?
A. I am including the Ceiling plans, this should answer this question
B. El Rio will provide the 2-post rack and vertical cable management. We will not be using horizontal wire management
C. Wrap around labels are not required, cables need to be marked and wrap around labels are preferred
D. Riser cable will be used at this building
2. F.III.a-Will El Rio supply the contractor with AutoCAD backgrounds for their use in documentation?
Yes
3. F.VII.b- The completion penalty clause calls for a 50% penalty per working day post agreed completion date. Is this correct?
.5% per working day
4. F.VIII.a Will El Rio also supply and install the rack and cable management on the 2nd floor IDF?
Yes we will provide and install the rack and vertical cable management in the MDF and IDF
5. F.VIII.g-Shall the spare cables be terminated with White jacks for them to be certified?
Yes, terminated with white jacks
6. General – Will El Rio provide Rack Elevations for the Contractors use for termination the cabling?
Yes, we will provide rack elevations
7. General – Will El Rio publish the Reflected Ceiling Plans for our use in Estimation?
Ceiling Plans have been attached
8. General – Will Riser, (CMR,) or Plenum, (CMP,) cabling be required for use in the facility.? If determined by the mechanical system, are the Mechanical Plans available?
Riser Cable will be used at this building
7 - 8' - 6" Ceiling - 878 SF
8 - 8' - 3" Ceiling - 236 SF
1st Floor Ceiling.pdf (98% of Scale); Takeoff in Active Area: All Areas; Ceiling Types; 5-22-2019 9-56-9; 5/6/2021 02:23 PM
1 2 3 4 5 6 7 8
A
B
C
D
E
F
2
A5.2
2
A5.2
1
A5.2
1
A5.2
4
A5.2
4
A5.2
3
A5.2
3
A5.2
LAB
211
DENTALSTERILIZATION
208
IMAGING
203
EQUIP.
202
D.O. 1
204
D.O. 2
206
D.O. 3
210
D.O. 4
213
D.O. 5
214
D.O. 6
212
D.O. 7
207
D.O. 8
205
DENTALSTORAGE
209
RECEPTION
201
WAITING
200
WOMEN'SRR
229
MEN'S RR
228
UNISEX RR
225 UNISEX RR
226
LOCKERS
227
IDF
220
VENDING
224C
ELECT.
223
CUSTODIAL
219
OPENOFFICE
218 CORRIDOR
216A
BREAKROOM
224
MOM'SROOM
221
DENTALMGR.
215
CORRIDOR
224B
GWB8' - 9" AFF
GWB8' - 9" AFF
ACP-19' - 6" AFF
BOTTLESTORAGE
217
PRINTING &DEVELOPING
216
E.T.S.
E.T.S.
E.T.S.
16
A8.1
ACP-19' - 6" AFF
3
A3.3
7
A3.3
4
A3.3
7
A3.3
3
A3.3
3
A3.3
3' - 0"
3' -
0"
CEILING TYPES:
A
B E.T.S.
C
D
GWB
EXPOSED TO
STRUCTURE
CEILING EQUIPMENT:
LIGHT FIXTURE - RECESSED IN
CEILING.
LIGHT FIXTURE - CEILING OR
PENDENT MOUNT.
LIGHT FIXTURE - WALL MOUNT.
LIGHT FIXTURE - RECESSED IN
CEILING.
GENERAL NOTES:
1. CEILING HEIGHTS SHOWN IN PLAN ARE NOMINAL AND SHOULD BE COORDINATED WITH DETAILS AND
SECTIONS
E
2x2 SUSPENDED
ACCOUSTICAL CEILING
MECH - SUPPLY DIFFUSER
MECH - RETURN DIFFUSER
MECH - EXHAUST
EXTERIOR LIGHT FIXTURE - WALL
MOUNT.
EXIT LIGHT
CEILING EQUIPMENT:
EB
EMERGENCY BATTERY PACK -
WALL MOUNT.
LED EXIT FIXTURE - CEILING MOUNT.
LED EXIT FIXTURE - WALL MOUNT.
LIGHT FIXTURE - WALL MOUNT.
LIGHT FIXTURE - SURFACE,
PENDANT OR CHAIN MOUNT FROM
CEILING.
UNDERCOUNTER FIXTURE -
SURFACE MOUNT.
2x4 SUSPENDED
ACCOUSTICAL CEILING
LIGHT FIXTURE - RECESSED IN
CEILING.
LIGHT FIXTURE - RECESSED IN
CEILING.
DENTAL LIGHTS ATTACHMENT POINT
HEXAGONAL
ACOUSTICAL CEILING
CLOUD
1. SEE GENERAL NOTES ON SHEET G1.1 FOR SUSPENDED CEILING GRID
LAYOUT AND PLACEMENT OF CEILING MOUNTED DEVICES.
2. SEE FLOOR PLAN FOR PARTITION TYPES.
3. COORDINATE CEILING PLANS WITH MECHANICAL, FIRE PROTECTION AND
ELECTRICAL PLANS.
4. ALL GWB CEILINGS AND SOFFITS SHALL BE TEXTURED AND PAINTED.
5. REFER TO SHEET A3.3 FOR CEILING DETAILS.
6. CEILING HEIGHTS SHALL BE 9'-0" AFF, U.N.O.
7. CENTER LIGHT FIXTURES IN CEILING, U.N.O.
8. "CJ" INDICATES A GWB CONTROL JOINT - TO BE INDICATED IN FINAL SPEC.
SOUNDSCAPES HEX 5444 - STONE
SOUNDSCAPES HEX 5444 - SKY
SOUNDSCAPES HEX 5444 - WHITE
1/8" = 1'-0"102 - CEILING PLAN - SECOND FLOOR
REG
ISTERED ARCHITECT
A
RI Z O N A , U . S
.
A.
Da t e S ig n ed . . .
.
...
CERTIFICATE NO.23533
ROBIN A.SHAMBACH
EXPIRES 06/30/2022
ARCHITECTS
JOB NO:
DATE:
REVISIONS
DRAWN BY:
CO
NSU
LTA
NTS
261
Nor
th C
ourt
Ave
nue
Tucs
on, A
rizo
na 8
5701
520.
795.
2705
Fa
x 52
0.79
5.61
71
ww
w.b
wsa
rchs
.com
BU
RN
S W
ALD
-H
OP
KIN
S S
HA
MB
AC
HA
RC
HIT
EC
TS
3/29
/202
1 1
2:47
:00
PM
CONSTRUCTION DOCUMENTS
A3.2
REFLECTED CEILING PLAN -
SECOND FLOOR
25 JAN 2021
2003.000
El
Rio
Healt
h
Gra
nt
Road C
linic
CIV
IL
Per
ry E
ngin
eeri
ng
501
W. W
etm
ore
Roa
d
Tucs
on, A
Z 85
716
Pho
ne: 5
20.6
20.9
870
LAN
DS
CA
PE
Nor
ris
Des
ign
418
N. T
oole
Ave
Tucs
on, A
Z 85
701
Pho
ne: 5
20.6
22.9
565
STR
UC
TUR
AL
Turn
er S
truc
tura
l
Engi
neer
ing
Co
3026
N. C
ount
ry C
lub
Roa
d
Tucs
on, A
Z 85
716
Pho
ne: 5
20.3
23.3
422
MEC
HA
NIC
AL
Ada
ms
& A
ssoc
iate
s
6422
E. S
peed
way
#13
0
Tucs
on, A
Z 85
712
Pho
ne: 5
20.3
23.3
858
ELEC
TRIC
AL
M3
Engi
neer
ing
& T
echn
olog
y
2051
W. S
unse
t Roa
d, S
uite
101
Tucs
on, A
Z 85
716.
Pho
ne: 5
20.2
93.1
488
3655
E G
rant
Roa
d, T
ucso
n, A
Z
Author
3/29/
21
REFLECTED CEILING PLAN LEGEND 2
REFLECTED CEILING PLAN GENERAL NOTES
0' 4' 8' 16'
PLANNORTH
1 ASI 01 03/29/21
1
ACOUSTIC PANEL LEGEND
top related