Project Detail: The Jama Masjid Redevelopment plan includes proposal for

redevelopment of the peripheral roads and the precinct within it. The Plan of precinct covers an area of around 12.7 Hectares around the Jama Masjid, and includes the peripheral streets of about 3kms, starting from Subhash Marg to back of Jama Masjid till Subhash Marg at Parade Ground car parking.

Issues Identified: Spatial organisation, Commercial activities, Circulation, Facilities for the worshippers of Jama Masjid, Present infrastructure utilities, Civic amenities

Redevelopment of Jama Masjid Precinct

Project Aim: Identifiable urban form for the

Precinct Contemporary environment befitting

the heritage of this Precinct Open up a visual and physical link to

the Red Fort Create democratic multi use civic

space and streetscapes Development of a new physical plan,

incorporating modifications in: Land use Built fabric Movement networks &

parking Urban infrastructure

services Rationalization of spaces

for commercial and other uses

Plan showing the precinct. 1850 AD

Redevelopment of Jama MasjidPrecinct

Proposed Master Plan as submitted by the consultant Shri Pradeep Sachdeva

Meena Bazar

Area of Intervention

Satellite Image of the Precinct

21st Century

Issues

Commercial activity spilling on public right of way

Visual corridor blocked by Meena Bazaar

Unregulated traffic and parkingInappropriately sited urban infrastructure

Present: Shahi entry to Jama Masjid

Proposed: Shahi entry to Jama Masjid

View of precinct from Minar Present

Proposed

Way Forward

Master Plan Approved

Master Plan Review and

Update

Approval of Revised

Master Plan

Detailed Design of Individual

Components

Operations and Maintenance

INPUTS FROM USERS, RESIDENT COMMUNITIES, CITY AGENCIES, UTILITY PROVIDERS, EXPERTS AND OTHER

STAKEHOLDERS

Bidding Process for Construction

Preparation of Estimates and

Tender Documents/

DPRs

Appointment of Consultant for Detailed

Design

Setting-up of Co-

ordination/ Monitoring

Group

CURRENT STATUS OF PROJECT

Construction and Supervision

Preparation of Working Drawings

Finalization of Implementation Framework