…rebuilding an icon: paul rudolph’s sarasota high school…
…rebuilding an icon: paul rudolph’s sarasota high school…
…sarasota school of architecture…
…sarasota school of architecture…
…sarasota school of architecture…
…sarasota school of architecture…
…existing conditions…
…existing conditions…
…existing conditions…
…existing conditions…
…existing conditions…
…our journey…
…our journey…
0
500
1000
1500
2000
2500
3000
3500
School Year
Current Campus Capacity = 3273SHS Enrollment
…our promise…
Riverview High School
…our journey…
Access to 21st century science labs
Need for one central food service cafeteria
Need an appropriately sized gym with ancillary facilities
Considerations for Building 4
Safe and secure campus
Concern for historic preservation
…interview proposal…
…interview proposal…
…community involvement…
…sarasota county schools objectives…
Vision Ensure SHS staff and students have access to
facilities that support 21st century learning
Improve Safety & Security—Front Door Ensure 21st Century Instruction Decrease Operational Costs Respect History & Architecture
Project Objectives
…objective 1: enhance safety and security…
…objective 1: enhance safety and security…
…objective 2: ensure 21st century instruction…
…objective 2: ensure 21st century instruction…
…objective 3 &4: decrease operational cost & respect history and architecture…
Electricity $0.99+ Maintenance $1.14+ Custodial $1.83
Total $3.96$3.96 * 15,000 = $59,400
Cost Per Square Foot
Commitments Rehab building 4 Continue use for educational
purposes
Expressed Concerns Glassing in Entryways Demolition of west gym
…charrette…
…charrette…
Option 1… Option Price = Base Cost
…charrette…
Option 2… Option Price = Base Cost + $1.5 million
…charrette…
Option 3… Option Price = Base Cost + $1.2 million
…charrette…
Option 1 Option 2
Option 3
Introduce yourselves Use the “Active-Vote” device to
share your #1 issue Discuss the stated Project Objectives
Safety & Security 21st C. learning spaces Operational costs History and Architecture
Table Exercise #1 Discuss pros and cons of each Option
Reflect on the four project objectives and budget
Comment on Existing Options and identify Significant variations Refer to the posted options, as necessary
Select a representative to speak for the table
Table Exercise #2
…one of the most interesting evenings…
…charrette…
Option 4…
…charrette…
Option 5…
…charrette…
Option 6…
…charrette…
…charrette…
Option 5…
…existing conditions…
…original conditions…
…original conditions…
…new conditions…
…existing conditions…
…existing conditions…
…existing conditions…
The following products were used for this waterproofng system: Existing Substrate Condition MasterEmaco N 425 (Gel Patch) – Used to build
corners and level imperfections in columns, panels, walls and ceilings. MasterEmaco 581 (Thoroseal) MasterEmaco 584 (Thoroseal Plaster Mix) MasterProtect HB 400 (Thorocoat) Fine – 1st
Coat was done with HB 400 Fine with aggregate MasterProtect HB 200 - 2nd Coat was done with
HB 200 *MasterEmaco P-124 (Emaco P 24) – It was
used at all exposed rebar prior to repairs being performed
…existing conditions…
…existing conditions…
…existing conditions…
…existing conditions…
…existing conditions…
…existing conditions…
…existing conditions…
…existing conditions…
…existing conditions…
…existing conditions…
…existing conditions…
…b4 transformation…
…4a…
…4a…
…4a…
…4a…
…4a…
…4a…
…4a…
…4a…
…4a…
…4a…
…4a…
…4a…
…4a…
…4a…
…4a…
…4a…
…4a…
…4a…
…4a…
…4a…
…completed b4 and future phases…
Animation-CompletedProject Lessons Learned-Owner’s Perspective Lessons Learned-CM’s Perspective Lessons Learned-Architect’s Perspective
Lessons Learned