public meeting #3 | site plan...jun 02, 2018  · public meeting #3 | precedent imagery park entry...

Post on 04-Sep-2020

3 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

BE’ER SHEVA PARK IMPROVEMENTS JUNE 2, 2018

PUBLIC MEETING #3 | SITE PLAN

BE’ER SHEVA PARK IMPROVEMENTS JUNE 2, 2018

PUBLIC MEETING #3 | SITE PLAN

22.5’ - CONC. STAGE W/ POWER SUPPLY, RAMP, AND SHELTER.

5’ - CRUSHED ROCK PATH, TYP.

CONC. PAD W/ CUSTOM EXERCISE FEATURE

EXIST. MAPES CREEK RESTORATION, TYP.

BENCH, TYP.

BIKE REPAIR STATION

PARK ENTRY SIGN/SEATWALL

INTERPRETIVE ART

6’ - ASPAHLT PATH

CONC. PAD W/ TABLES & BBQ, TYP.

EXIST. LAWN, TYP.

CONCESSIONS STAGING AREA

NATIVE PLANT RESTORATION

RAISED PLANTER SEATWALL, TYP.

EXIST. CONC. PATH, TYP.

EXIST. ASPHALT PATH, TYP.

8’ - CIP CONC. W/ SPECIAL FINISH

RESTORED BEACH W/ AGGREGATE & LOGS

ESTIMATED OLWM

OHWM 18.6’

GATHERING/FISHING ALCOVE

PED. BOAT LAUNCH

GROUP TABLES & BBQ

RELOCATED AND NEW BOULDERS, TYP.

CONC. SEATWALL

RECONFIGURED PARKING STALLS, TYP.

+20.8

+21.8

+22.8

+20.5

+23

+23

+22

+27.5

+27.8

+23.4+23.4

+24.5+23

+23.4

BE’ER SHEVA PARK IMPROVEMENTS JUNE 2, 2018

PUBLIC MEETING #3 | SITE PLAN

BE’ER SHEVA PARK IMPROVEMENTS JUNE 2, 2018

PUBLIC MEETING #3 | SITE PLAN

BE’ER SHEVA PARK IMPROVEMENTS JUNE 2, 2018

PUBLIC MEETING #3 | SITE PLAN

BE’ER SHEVA PARK IMPROVEMENTS JUNE 2, 2018

PUBLIC MEETING #3 | SITE SECTIONS

1

3

4

BE’ER SHEVA PARK IMPROVEMENTS JUNE 2, 2018

PUBLIC MEETING #3 | PERSPECTIVE VIEWS

BE’ER SHEVA PARK IMPROVEMENTS JUNE 2, 2018

PUBLIC MEETING #3 | PRECEDENT IMAGERY

Park Entry Sign Garden Planting Aggregate Beach Sister City Interpretive Signage

Interactive Art Pole Art Ribbon Exercise Equipment Exercise Equipment

Open Air Stage Traditional Shelter Concrete Paving with Special Finish BBQ

top related