prueba funcional optimux 16 e1 - ossoss.mx/data/documents/pruebas_16_e1_rad_optimux-34... · prueba...

Post on 07-Oct-2020

18 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

1

PRUEBA FUNCIONAL

Optimux 16 E1

LINEA:

S.E. LVD – S.E. LVN

FECHA:

June 1st, 2011

CONFIGURACION Y AJUSTES DEL MUX RAD 34 DEL ENLACE

LVD – LVN EL DIA 12 JUNIO 2012

ING. SAMUEL VALLE (samuel.valle@oss.mx)

ING. JOSE DE JESUS SANCHEZ MATUS (CFE SAT ISTMO jose.sanchez58@cfe.gob.mx)

RESULTADOS DEL EQUIPO DE PRUEBA SDH – PDH TEKTRONIX CTS 850

LVD – LVN

EL DIA 12 JUNIO 2012

ING. SAMUEL VALLE (RFL Electronics)

ING. JOSE DE JESUS SANCHEZ MATUS (CFE SAT ISTMO Comunicaciones)

top related