proposed bus terminal at sector 29, gurgaon, haryana

Post on 10-Feb-2017

89 Views

Category:

Design

3 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Assumptions:•Caters Volvo & other A/C interstate buses.•Avg loading & unloading time-15 mins•No of bus bays provided=6•Total capacity=4X6=24 buses/hr

Terminal BlockCheck-In Block

Thank You.

This is a tentative proposal for Bus Terminal at Sector 29. Actual proposal will be finalized after discussion with actual users and understanding their day-to-day needs for use of building.

Bus Terminal at Sector 29

top related