project: race road parkbloximages.chicago2.vip.townnews.com/cecildaily.com/content/tnc… ·...

Post on 26-May-2020

11 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Project:

Race Road Park

Project No.LP513_40869514410_1Drawn: 2011-11-22

Presented By:

John AmiciBosco Associates, Inc.410-939-2557

This play equipment complies with the safety performance specifications of ASTM for children 2-12 years old. Not all equipment may be appropriate for all children. Supervision is required.

PlayPower LT Farmington, Inc.800-325-8828 www.ltcps.com

top related