project : construction of meghna-gumti bridge client : oriental...

Post on 21-Mar-2020

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

D3

12.0

7.0

9.0

8.0

10.0

11.0

6.0

5.0

4.0

3.0

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 68.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P7

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D2

D1

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

1 0 1

2.0

1.0

2010

1

50 6030 40

14.0

13.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

11.0

12.0

13.0

14.0

15.0

16.0

17.0

18.0

19

20.0

D4

D5

D6

D7

D8

D9

D10

D11

D12

D13

D14

D15

D16

D17

D18

D19

D20

15.0

16.0

17.0

18.0

19.0

20.0

Date Completed : 20-02-2012Date Started : 18-02-2012Ground/ Water Level : -3.11m

Note : Boring Terminated at 68.0m from EGLD for Disturbed sampleUD for Undisturbed sample

Cont'd...................Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

3 3 4 7

3 4 4 8

2 4 3 7

4 5 4 9

4 4 4 8

4 3 5 8

5 7 8 15

5 8 8 16

5 6 8 14

6 7 8 15

3 4 6 10

6 7 9 16

5 6 9 15

6 7 10 17

8 10 12 22

9 11 12 23

7 9 10 19

6 8 10 18

8 10 11 21

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

Existing Ground Level : -3.9m

GreyVery loose to loose

silty very fine SAND with trace of mica

Grey Medium dense

silty fine SAND with trace of mica

7.0

21.0

D23

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 68.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P7

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D22

D21

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

21.0

22.0

23.0

24.0

25.0

26.0

27.0

28.0

29.0

30.0

31.0

32.0

33.0

34.0

35.0

36.0

37.0

38.0

39.0

40.0

D24

D25

D26

D27

D28

D29

D30

D31

D32

D33

D34

D35

D36

D37

D38

D39

D40Note : Boring Terminated at 68.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

23.0

24.0

25.0

26.0

27.0

21.0

22.0

7 9 12 21

8 10 13 23

6 9 10 19

5 8 11 19

7 9 12 21

6 8 10 18

7 9 10 19

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

28.0 4 5 6 11

29.0 6 5 4 9

30.0 5 6 6 12

31.0 5 5 6 11

32.0 6 6 7 13

33.0 7 5 7 12

34.0 5 4 6 10

35.0 4 4 5 9

36.0 6 5 6 11

37.0 5 7 7 14

38.0 6 6 7 13

39.0 5 6 8 14

40.0 6 7 7 14Cont'd...................

GreyStiff

medium plastic CLAY

Date Completed : 20-02-2012Date Started : 18-02-2012Ground/ Water Level : -3.11mExisting Ground Level : -3.9m

Grey Medium dense

silty fine SAND with trace of mica

GreyStiff to very stiff

non plastic SILT with trace of mica

7.0

D43

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 68.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P7

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D42

D41

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

41.0

42.0

43.0

44.0

45.0

46.0

47.0

48.0

49.0

50.0

51.0

52.0

53.0

54.0

55.0

56.0

57.0

58.0

59.0

60.0

D44

D45

D46

D47

D48

D49

D50

D51

D52

D53

D54

D55

D56

D57

D58

D59

D60Note : Boring Terminated at 68.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

43.0

44.0

45.0

46.0

47.0

41.0

42.0

5 5 6 11

5 6 7 13

6 6 5 11

5 6 6 12

4 5 6 11

6 8 5 13

5 4 6 10

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

48.0 7 6 6 12

49.0 6 7 5 12

50.0 5 6 7 13

51.0 4 7 5 12

52.0 4 5 6 11

53.0 6 7 7 14

54.0 7 7 6 13

55.0 5 7 8 15

56.0 8 6 7 13

57.0 6 8 6 14

58.0 5 9 6 15

59.0 7 6 7 13

60.0 8 7 9 16Cont'd...................

Date Completed : 20-02-2012Date Started : 18-02-2012Ground/ Water Level : -3.11mExisting Ground Level : -3.9m

28.0GreyStiff to very stiff

non plastic SILT with trace of mica

D63

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 68.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P7

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D62

D61

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

61.0

62.0

63.0

64.0

65.0

66.0

67.0

68.0

69.0

70.0

71.0

72.0

73.0

74.0

75.0

76.0

77.0

78.0

79.0

80.0

D64

D65

D66

D67

D68

D69

D70

D71

D72

D73

D74

D75

D76

D77

D78

D79

D80Note : Boring Terminated at 68.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

End of Boring

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

63.0

64.0

65.0

66.0

67.0

61.0

62.0

9 8 7 15

7 9 10 19

10 10 12 22

63 - - 63

50 - - 50

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

68.0

Date Completed : 20-02-2012Date Started : 18-02-2012Ground/ Water Level : -3.11mExisting Ground Level : -3.9m

50 - - 50

50 - - 50

50 - - 50

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

Grey to light brownVery dense

fine SAND with trace of mica5.0

D3

12.0

7.0

9.0

8.0

10.0

11.0

6.0

5.0

4.0

3.0

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 71.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P8

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D2

D1

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

1 1 1

2.0

1.0

2010

2

50 6030 40

14.0

13.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

11.0

12.0

13.0

14.0

15.0

16.0

17.0

18.0

19

20.0

D4

D5

D6

D7

D8

D9

D10

D11

D12

D13

D14

D15

D16

D17

D18

D19

D20

15.0

16.0

17.0

18.0

19.0

20.0

Date Completed : 05-03-2012Date Started : 03-03-2012Ground/ Water Level : +1.43m

Note : Boring Terminated at 71.0m from EGLD for Disturbed sampleUD for Undisturbed sample

3.0

Cont'd...................Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

2 3 3 6

3 4 4 8

4 6 5 11

4 5 7 12

5 6 6 12

5 5 6 11

6 7 9 16

6 6 9 15

6 7 8 15

6 8 9 17

7 8 10 18

6 9 12 21

5 6 7 13

6 8 8 16

6 8 9 17

7 8 10 18

6 8 9 17

10 8 8 16

6 7 8 15

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

Existing Ground Level : -1.0m

Grey Very loose to loose

fine SAND with trace of mica

Grey to light grey Medium dense to dense

fine SAND with trace of mica

29.0

D23

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 71.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P8

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D22

D21

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

21.0

22.0

23.0

24.0

25.0

26.0

27.0

28.0

29.0

30.0

31.0

32.0

33.0

34.0

35.0

36.0

37.0

38.0

39.0

40.0

D24

D25

D26

D27

D28

D29

D30

D31

D32

D33

D34

D35

D36

D37

D38

D39

D40Note : Boring Terminated at 71.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

23.0

24.0

25.0

26.0

27.0

21.0

22.0

6 5 5 10

4 5 4 9

4 6 5 11

5 5 5 10

3 7 10 17

3 6 9 15

6 8 12 20

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

28.0 15 20 18 38

29.0 12 17 17 34

30.0 10 13 15 28

31.0 9 10 13 23

32.0 7 10 10 20

33.0 6 7 9 16

34.0 5 7 8 15

35.0 5 6 7 13

36.0 5 8 9 17

37.0 6 7 8 15

38.0 5 8 8 16

39.0 4 6 7 13

40.0 5 7 8 15Cont'd...................

Date Completed : 05-03-2012Date Started : 03-03-2012Ground/ Water Level : +1.43mExisting Ground Level : -1.0m

Grey to light grey Medium dense to dense

fine SAND with trace of mica

Grey Stiff to very stiff

non plastic SILT with trace of mica

D43

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 71.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P8

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D42

D41

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

41.0

42.0

43.0

44.0

45.0

46.0

47.0

48.0

49.0

50.0

51.0

52.0

53.0

54.0

55.0

56.0

57.0

58.0

59.0

60.0

D44

D45

D46

D47

D48

D49

D50

D51

D52

D53

D54

D55

D56

D57

D58

D59

D60Note : Boring Terminated at 71.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

43.0

44.0

45.0

46.0

47.0

41.0

42.0

5 6 8 14

7 9 7 16

6 8 8 16

5 7 6 13

5 6 7 13

5 7 8 15

6 9 8 17

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

48.0 5 7 9 16

49.0 6 8 10 18

50.0 7 7 9 16

51.0 6 8 8 16

52.0 7 7 8 15

53.0 6 8 9 17

54.0 9 10 8 18

55.0 8 9 8 17

56.0 5 7 9 16

57.0 6 7 8 15

58.0 7 8 8 16

59.0 5 6 8 14

60.0 7 7 9 16Cont'd...................

Date Completed : 05-03-2012Date Started : 03-03-2012Ground/ Water Level : +1.43mExisting Ground Level : -1.0m

Grey Stiff to very stiff

non plastic SILT with trace of mica21.0

Grey Stiff to very stiff

low plastic CLAY7.0

D63

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 71.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P8

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D62

D61

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

61.0

62.0

63.0

64.0

65.0

66.0

67.0

68.0

69.0

70.0

71.0

72.0

73.0

74.0

75.0

76.0

77.0

78.0

79.0

80.0

D64

D65

D66

D67

D68

D69

D70

D71

D72

D73

D74

D75

D76

D77

D78

D79

D80Note : Boring Terminated at 71.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

End of Boring

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

63.0

64.0

65.0

66.0

67.0

61.0

62.0

5 9 12 21

4 7 6 13

6 7 6 13

5 5 10 15

8 7 8 15

10 13 13 26

50 - - 50

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

68.0

69.0

70.0

71.0

Date Completed : 05-03-2012Date Started : 03-03-2012Ground/ Water Level : +1.43mExisting Ground Level : -1.0m

50 - - 50

50 - - 50

50 - - 50

50 - - 50

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

Grey to light grey Medium dense to very dense

fine SAND with trace of mica

Grey Stiff

medium plastic CLAY

4.0

4.0

Grey Stiff to very stiff

non plastic SILT3.0

D3

12.0

7.0

9.0

8.0

10.0

11.0

6.0

5.0

4.0

3.0

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 75.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P9

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D2

D1

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2 3 4

2.0

1.0

2010

7

50 6030 40

14.0

13.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

11.0

12.0

13.0

14.0

15.0

16.0

17.0

18.0

19

20.0

D4

D5

D6

D7

D8

D9

D10

D11

D12

D13

D14

D15

D16

D17

D18

D19

D20

15.0

16.0

17.0

18.0

19.0

20.0

Date Completed : 13-03-2012Date Started : 11-03-2012Ground/ Water Level : +0.81m

Note : Boring Terminated at 75.0m from EGLD for Disturbed sampleUD for Undisturbed sample

32.0

Cont'd...................Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

2 2 3 5

2 3 5 8

3 5 4 9

4 5 6 11

3 4 4 8

3 5 6 11

4 4 5 9

4 5 8 13

5 8 10 18

5 9 10 19

7 10 12 22

8 12 14 26

8 13 15 28

10 14 15 29

9 12 14 26

7 10 12 22

6 7 10 17

6 6 9 15

7 7 9 16

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

Existing Ground Level : -0.1m

Grey to light greyLoose to medium dense

silty fine SAND with trace of mica

D23

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 75.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P9

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D22

D21

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

21.0

22.0

23.0

24.0

25.0

26.0

27.0

28.0

29.0

30.0

31.0

32.0

33.0

34.0

35.0

36.0

37.0

38.0

39.0

40.0

D24

D25

D26

D27

D28

D29

D30

D31

D32

D33

D34

D35

D36

D37

D38

D39

D40Note : Boring Terminated at 75.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

23.0

24.0

25.0

26.0

27.0

21.0

22.0

5 7 10 17

6 8 9 17

5 7 9 16

7 8 10 18

5 8 9 17

6 9 9 18

6 7 8 15

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

28.0 7 8 9 17

29.0 6 9 10 19

30.0 8 10 14 24

31.0 8 11 12 23

32.0 7 9 10 19

33.0 4 5 6 11

34.0 4 5 7 12

35.0 5 6 5 11

36.0 5 5 7 12

37.0 4 6 7 13

38.0 3 4 6 10

39.0 4 6 7 13

40.0 4 5 6 11Cont'd...................

Date Completed : 13-03-2012Date Started : 11-03-2012Ground/ Water Level : +0.81mExisting Ground Level : -0.1m

Grey to light greyLoose to medium dense

silty fine SAND with trace of mica

Grey to light greyStiff

non plastic SILT with trace of mica23.0

D43

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 75.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P9

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D42

D41

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

41.0

42.0

43.0

44.0

45.0

46.0

47.0

48.0

49.0

50.0

51.0

52.0

53.0

54.0

55.0

56.0

57.0

58.0

59.0

60.0

D44

D45

D46

D47

D48

D49

D50

D51

D52

D53

D54

D55

D56

D57

D58

D59

D60Note : Boring Terminated at 75.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

43.0

44.0

45.0

46.0

47.0

41.0

42.0

3 4 6 10

3 5 6 11

3 5 5 10

4 5 6 11

5 5 6 11

6 8 7 15

5 6 8 14

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

48.0 4 7 9 16

49.0 5 5 7 12

50.0 6 5 8 13

51.0 5 5 6 11

52.0 6 7 6 13

53.0 4 6 5 11

54.0 5 5 7 12

55.0 6 6 8 14

56.0 5 7 9 16

57.0 5 6 7 13

58.0 6 7 8 15

59.0 6 9 10 19

60.0 8 10 13 23Cont'd...................

Date Completed : 13-03-2012Date Started : 11-03-2012Ground/ Water Level : +0.81mExisting Ground Level : -0.1m

Grey to light greyMedium dense

silty fine SAND with trace of mica

Grey to light greyStiff

non plastic SILT with trace of mica

10.0

D63

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 75.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P9

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D62

D61

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

61.0

62.0

63.0

64.0

65.0

66.0

67.0

68.0

69.0

70.0

71.0

72.0

73.0

74.0

75.0

76.0

77.0

78.0

79.0

80.0

D64

D65

D66

D67

D68

D69

D70

D71

D72

D73

D74

D75

D76

D77

D78

D79

D80Note : Boring Terminated at 75.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

End of Boring

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

63.0

64.0

65.0

66.0

67.0

61.0

62.0

6 10 12 22

8 9 14 23

5 7 9 16

6 9 10 19

5 8 10 18

5 7 9 16

6 9 12 21

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

68.0 7 9 10 19

69.0 8 10 12 22

70.0 14 18 24 42

71.0 18 50 - 50

72.0 50 - - 50

73.0

74.0

75.0

Date Completed : 13-03-2012Date Started : 11-03-2012Ground/ Water Level : +0.81mExisting Ground Level : -0.1m

50 - - 50

50 - - 50

50 - - 50 For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

Grey to light greyMedium dense

silty fine SAND with trace of mica

GreyVery stiff to hard

non plastic SILT5.0

5.0

Light greyVery dense

silty fine SAND with trace of mica

D3

12.0

7.0

9.0

8.0

10.0

11.0

6.0

5.0

4.0

3.0

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 74.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P10

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D2

D1

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

1 1 1

2.0

1.0

2010

2

50 6030 40

14.0

13.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

11.0

12.0

13.0

14.0

15.0

16.0

17.0

18.0

19

20.0

D4

D5

D6

D7

D8

D9

D10

D11

D12

D13

D14

D15

D16

D17

D18

D19

D20

15.0

16.0

17.0

18.0

19.0

20.0

Date Completed : 11-03-2012Date Started : 09-03-2012Ground/ Water Level : +0.29m

Note : Boring Terminated at 74.0m from EGLD for Disturbed sampleUD for Undisturbed sample

2.0

Cont'd...................Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

1 1 1 2

1 1 1 2

1 1 1 2

1 1 1 2

2 3 4 7

2 3 5 8

3 4 5 9

1 2 2 4

3 4 5 9

3 5 5 10

4 4 6 10

4 5 6 11

5 5 7 12

5 6 7 13

6 6 8 14

6 8 10 18

6 9 10 19

5 8 9 17

5 7 8 15

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

Existing Ground Level : +1.2m

GreyVery soft

Low plastic CLAY

29.0

Grey to light greyVery loose to medium dense

silty fine SAND with trace of mica

D23

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 74.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P10

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D22

D21

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

21.0

22.0

23.0

24.0

25.0

26.0

27.0

28.0

29.0

30.0

31.0

32.0

33.0

34.0

35.0

36.0

37.0

38.0

39.0

40.0

D24

D25

D26

D27

D28

D29

D30

D31

D32

D33

D34

D35

D36

D37

D38

D39

D40Note : Boring Terminated at 74.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

23.0

24.0

25.0

26.0

27.0

21.0

22.0

5 6 7 13

6 8 9 17

6 9 10 19

7 9 12 21

6 8 9 17

7 8 8 16

7 8 10 18

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

28.0 6 7 8 15

29.0 7 7 10 17

30.0 8 10 11 21

31.0 8 9 10 19

32.0 6 8 7 15

33.0 5 5 12 17

34.0 6 7 9 16

35.0 5 6 8 14

36.0 4 7 9 15

37.0 4 6 7 13

38.0 5 6 7 13

39.0 5 6 8 14

40.0 4 7 8 15Cont'd...................

Date Completed : 11-03-2012Date Started : 09-03-2012Ground/ Water Level : +0.29mExisting Ground Level : +1.2m

Grey to light greyStiff to very stiff

non plastic SILT with trace of mica

Grey to light greyVery loose to medium dense

silty fine SAND with trace of mica

23.0

D43

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 74.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P10

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D42

D41

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

41.0

42.0

43.0

44.0

45.0

46.0

47.0

48.0

49.0

50.0

51.0

52.0

53.0

54.0

55.0

56.0

57.0

58.0

59.0

60.0

D44

D45

D46

D47

D48

D49

D50

D51

D52

D53

D54

D55

D56

D57

D58

D59

D60Note : Boring Terminated at 74.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

43.0

44.0

45.0

46.0

47.0

41.0

42.0

6 6 7 13

5 7 7 14

6 7 8 15

5 7 7 14

6 6 9 15

6 7 8 15

5 6 7 13

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

48.0 5 7 7 14

49.0 5 6 7 13

50.0 5 6 6 12

51.0 6 5 5 10

52.0 5 6 6 12

53.0 5 5 6 11

54.0 6 6 7 13

55.0 5 6 7 13

56.0 5 5 7 12

57.0 5 6 8 14

58.0 6 7 9 16

59.0 8 13 16 29

60.0 10 14 18 32Cont'd...................

Date Completed : 11-03-2012Date Started : 09-03-2012Ground/ Water Level : +0.29mExisting Ground Level : +1.2m

Grey to light greyStiff to very stiff

non plastic SILT with trace of mica

Grey Stiff to very stiff

medium plastic CLAY4.0

D63

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 74.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P10

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D62

D61

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

61.0

62.0

63.0

64.0

65.0

66.0

67.0

68.0

69.0

70.0

71.0

72.0

73.0

74.0

75.0

76.0

77.0

78.0

79.0

80.0

D64

D65

D66

D67

D68

D69

D70

D71

D72

D73

D74

D75

D76

D77

D78

D79

D80Note : Boring Terminated at 74.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

End of Boring

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

63.0

64.0

65.0

66.0

67.0

61.0

62.0

6 12 15 27

7 13 17 30

5 7 9 16

4 6 8 14

5 8 9 17

6 8 10 18

7 9 10 19

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

68.0 8 10 12 22

69.0 10 12 13 25

70.0 18 23 27 50

71.0 50 - - 50

72.0

73.0

74.0

Date Completed : 11-03-2012Date Started : 09-03-2012Ground/ Water Level : +0.29mExisting Ground Level : +1.2m

50 - - 50

50 - - 50

50 - - 50 For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 275mm penetratiom

Grey to light greyStiff to very stiff

non plastic SILT with trace of mica12.0

Light greyVery dense

silty fine SAND with trace of mica4.0

D3

12.0

7.0

9.0

8.0

10.0

11.0

6.0

5.0

4.0

3.0

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P11

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D2

D1

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

1 1 1

2.0

1.0

2010

2

50 6030 40

14.0

13.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

11.0

12.0

13.0

14.0

15.0

16.0

17.0

18.0

19

20.0

D4

D5

D6

D7

D8

D9

D10

D11

D12

D13

D14

D15

D16

D17

D18

D19

D20

15.0

16.0

17.0

18.0

19.0

20.0

Date Completed : 09-03-2012Date Started : 06-03-2012Ground/ Water Level : -1.07m

Note : Boring Terminated at 72.0m from EGLD for Disturbed sampleUD for Undisturbed sample

10.0

Cont'd...................Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

1 1 1 2

1 1 1 2

1 1 1 2

1 1 2 3

1 2 2 4

1 1 2 3

1 1 2 3

3 4 4 8

4 5 6 11

5 7 8 15

5 7 9 16

6 8 10 18

6 8 11 19

5 7 8 15

6 7 7 14

5 8 7 15

5 6 8 14

4 4 7 11

4 5 8 13

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

Existing Ground Level : +0.3m

GreySoft to medium stiff

non plastic SILT with trace of mica

Grey to light greyMedium dense

silty very fine SAND with trace of mica

22.0

D23

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P11

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D22

D21

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

21.0

22.0

23.0

24.0

25.0

26.0

27.0

28.0

29.0

30.0

31.0

32.0

33.0

34.0

35.0

36.0

37.0

38.0

39.0

40.0

D24

D25

D26

D27

D28

D29

D30

D31

D32

D33

D34

D35

D36

D37

D38

D39

D40Note : Boring Terminated at 72.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

23.0

24.0

25.0

26.0

27.0

21.0

22.0

5 6 7 13

5 7 8 15

6 8 10 18

6 9 10 19

5 8 9 17

5 8 8 16

6 7 7 14

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

28.0 7 6 8 14

29.0 7 9 11 20

30.0 6 8 10 18

31.0 6 7 9 16

32.0 5 6 7 13

33.0 4 6 8 14

34.0 5 5 7 12

35.0 6 7 6 13

36.0 5 6 8 14

37.0 4 5 8 13

38.0 5 6 9 15

39.0 6 8 7 15

40.0 6 7 9 16Cont'd...................

Date Completed : 09-03-2012Date Started : 06-03-2012Ground/ Water Level : -1.07mExisting Ground Level : +0.3m

12.0Grey to light greyStiff to very stiff

non plastic SILT with trace of mica

Grey to light greyMedium dense

silty very fine SAND with trace of mica

D43

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P11

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D42

D41

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

41.0

42.0

43.0

44.0

45.0

46.0

47.0

48.0

49.0

50.0

51.0

52.0

53.0

54.0

55.0

56.0

57.0

58.0

59.0

60.0

D44

D45

D46

D47

D48

D49

D50

D51

D52

D53

D54

D55

D56

D57

D58

D59

D60Note : Boring Terminated at 72.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

43.0

44.0

45.0

46.0

47.0

41.0

42.0

7 8 9 17

7 9 8 17

6 7 8 15

6 8 10 18

5 8 9 17

7 8 8 16

7 7 8 15

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

48.0 6 9 10 19

49.0 7 9 11 20

50.0 6 7 10 17

51.0 7 8 10 18

52.0 7 10 11 21

53.0 8 9 10 19

54.0 6 7 8 15

55.0 6 8 8 16

56.0 8 8 9 17

57.0 8 9 9 18

58.0 7 8 9 17

59.0 7 9 10 19

60.0 6 9 11 20Cont'd...................

Date Completed : 09-03-2012Date Started : 06-03-2012Ground/ Water Level : -1.07mExisting Ground Level : +0.3m

2.0Grey to light greyMedium dense

silty fine SAND with trace of mica

21.0 Grey Stiff to very stiff

non plastic SILT with trace of mica

D63

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P11

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D62

D61

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

61.0

62.0

63.0

64.0

65.0

66.0

67.0

68.0

69.0

70.0

71.0

72.0

73.0

74.0

75.0

76.0

77.0

78.0

79.0

80.0

D64

D65

D66

D67

D68

D69

D70

D71

D72

D73

D74

D75

D76

D77

D78

D79

D80Note : Boring Terminated at 72.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

End of Boring

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

63.0

64.0

65.0

66.0

67.0

61.0

62.0

8 9 12 21

8 8 12 20

5 7 8 15

5 7 7 14

6 8 8 16

6 8 9 17

5 6 8 14

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

68.0 50 - - 50

69.0

70.0

71.0

72.0

Date Completed : 09-03-2012Date Started : 06-03-2012Ground/ Water Level : -1.07mExisting Ground Level : +0.3m

50 - - 50

50 - - 50

50 - - 50

50 - - 50 For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

Grey Stiff to very stiff

non plastic SILT with trace of mica

4.0

Light grey Very dense

silty very fine SAND with trace of mica

D3

12.0

7.0

9.0

8.0

10.0

11.0

6.0

5.0

4.0

3.0

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P12

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D2

D1

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

1 1 1

2.0

1.0

2010

2

50 6030 40

14.0

13.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

11.0

12.0

13.0

14.0

15.0

16.0

17.0

18.0

19

20.0

D4

D5

D6

D7

D8

D9

D10

D11

D12

D13

D14

D15

D16

D17

D18

D19

D20

15.0

16.0

17.0

18.0

19.0

20.0

Date Completed : 17-02-2012Date Started : 16-02-2012Ground/ Water Level : +0.44m

Note : Boring Terminated at 72.0m from EGLD for Disturbed sampleUD for Undisturbed sample

10.0

Cont'd...................Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

GreyVery loose to loose

silty fine SAND with trace of mica

1 - 1 1

1 1 2 3

1 1 2 3

1 - 1 1

1 1 1 2

1 2 2 4

2 2 3 5

3 5 6 11

2 5 5 10

2 4 3 7

1 2 3 5

4 6 5 11

5 7 6 13

5 7 7 14

5 6 8 14

4 7 6 13

4 6 8 14

5 6 7 13

4 7 8 15

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

Existing Ground Level : +1.2m

GreyMedium dense

silty fine SAND with trace of mica

3.0

Light greyMedium stiff to stiff

non plastic SILT with trace of mica

D23

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P12

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D22

D21

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

21.0

22.0

23.0

24.0

25.0

26.0

27.0

28.0

29.0

30.0

31.0

32.0

33.0

34.0

35.0

36.0

37.0

38.0

39.0

40.0

D24

D25

D26

D27

D28

D29

D30

D31

D32

D33

D34

D35

D36

D37

D38

D39

D40Note : Boring Terminated at 72.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

23.0

24.0

25.0

26.0

27.0

21.0

22.0

6 8 9 17

6 7 8 15

6 8 9 17

6 9 8 17

4 6 6 12

3 4 4 8

2 3 4 7

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

28.0 3 4 5 9

29.0 4 4 7 11

30.0 5 6 8 14

31.0 4 5 7 12

32.0 5 6 6 12

33.0 6 6 7 13

34.0 3 5 6 11

35.0 4 5 7 12

36.0 3 5 5 10

37.0 4 6 5 11

38.0 4 5 6 11

39.0 6 6 6 12

40.0 4 4 7 11Cont'd...................

Date Completed : 17-02-2012Date Started : 16-02-2012Ground/ Water Level : +0.44mExisting Ground Level : +1.2m

Light greyStiff to very stiff

non plastic SILT, few sand

GreyMedium stiff to stiff

medium plastic CLAY

Light greyMedium dense

silty fine SAND with trace of mica

Light grey to greyMedium stiff

low to medium plastic CLAY

3.0

5.0

1.0

15.0

D43

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P12

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D42

D41

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

41.0

42.0

43.0

44.0

45.0

46.0

47.0

48.0

49.0

50.0

51.0

52.0

53.0

54.0

55.0

56.0

57.0

58.0

59.0

60.0

D44

D45

D46

D47

D48

D49

D50

D51

D52

D53

D54

D55

D56

D57

D58

D59

D60Note : Boring Terminated at 72.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

43.0

44.0

45.0

46.0

47.0

41.0

42.0

3 5 6 11

3 5 4 9

4 4 6 10

4 6 5 11

5 5 7 12

5 6 6 12

4 6 5 11

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

48.0 6 7 7 14

49.0 4 6 6 12

50.0 3 4 4 8

51.0 3 3 4 7

52.0 5 7 8 15

53.0 5 8 8 16

54.0 4 7 7 14

55.0 6 6 8 14

56.0 6 5 7 12

57.0 5 7 8 15

58.0 7 6 7 13

59.0 5 5 6 11

60.0 5 6 7 13Cont'd...................

Date Completed : 17-02-2012Date Started : 16-02-2012Ground/ Water Level : +0.44mExisting Ground Level : +1.2m

GreyStiff

non plastic SILT trace of mica

GreyStiff

medium to high plastic CLAY

Light grey to greyMedium stiff

low to medium plastic CLAY

Light grey to greyStiff to very stiff

medium to high plastic CLAY

GreyVery stiff

non plastic SILT

1.0

4.0

2.0

14.0

D63

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P12

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D62

D61

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

61.0

62.0

63.0

64.0

65.0

66.0

67.0

68.0

69.0

70.0

71.0

72.0

73.0

74.0

75.0

76.0

77.0

78.0

79.0

80.0

D64

D65

D66

D67

D68

D69

D70

D71

D72

D73

D74

D75

D76

D77

D78

D79

D80Note : Boring Terminated at 72.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

End of Boring

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

63.0

64.0

65.0

66.0

67.0

61.0

62.0

4 6 7 13

4 4 7 11

4 5 6 11

4 5 7 12

5 6 8 14

5 7 8 15

6 8 9 17

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

68.0 55 - - 55

69.0 50 - - 50

70.0 50 - - 50

71.0 60 - - 60

72.0 60 - - 60

Date Completed : 17-02-2012Date Started : 16-02-2012Ground/ Water Level : +0.44mExisting Ground Level : +1.2m

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

Light grey to light brownVery dense

silty fine SAND with trace of mica

Light grey to greyStiff to very stiff

medium to high plastic CLAY

5.0

D3

12.0

7.0

9.0

8.0

10.0

11.0

6.0

5.0

4.0

3.0

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 74.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P13

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D2

D1

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

1 2 3

2.0

1.0

2010

5

50 6030 40

14.0

13.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

11.0

12.0

13.0

14.0

15.0

16.0

17.0

18.0

19

20.0

D4

D5

D6

D7

D8

D9

D10

D11

D12

D13

D14

D15

D16

D17

D18

D19

D20

15.0

16.0

17.0

18.0

19.0

20.0

Date Completed : 09-02-2012Date Started : 07-02-2012Ground/ Water Level : +0.74m

Note : Boring Terminated at 74.0m from EGLD for Disturbed sampleUD for Undisturbed sample

Cont'd...................Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

1 1 1 2

1 0 1 1

1 1 2 3

3 5 7 12

2 3 3 6

2 3 4 7

2 4 4 8

4 5 5 10

4 5 6 11

3 4 6 10

3 4 5 9

4 5 6 11

4 6 7 13

5 7 7 14

5 6 7 13

4 7 8 15

5 6 6 12

7 9 12 21

6 8 9 17

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

Existing Ground Level : +1.8m

Grey to brownVery soft to medium stiff

non plastic SILT with trace of mica

Grey Loose to medium dense

very fine to fine SAND with trace of mica

4.0

22.0

D23

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 74.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P13

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D22

D21

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

21.0

22.0

23.0

24.0

25.0

26.0

27.0

28.0

29.0

30.0

31.0

32.0

33.0

34.0

35.0

36.0

37.0

38.0

39.0

40.0

D24

D25

D26

D27

D28

D29

D30

D31

D32

D33

D34

D35

D36

D37

D38

D39

D40Note : Boring Terminated at 74.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

23.0

24.0

25.0

26.0

27.0

21.0

22.0

6 8 5 13

5 5 6 11

3 4 5 9

3 4 6 10

3 5 7 12

4 6 9 15

3 3 5 8

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

28.0 3 3 4 7

29.0 2 4 5 9

30.0 2 5 5 10

31.0 4 6 8 14

32.0 5 8 10 18

33.0 6 7 9 16

34.0 5 6 6 12

35.0 5 5 7 12

36.0 6 7 6 13

37.0 4 5 6 11

38.0 5 6 8 14

39.0 6 6 7 13

40.0 5 6 7 13Cont'd...................

Date Completed : 09-02-2012Date Started : 07-02-2012Ground/ Water Level : +0.74mExisting Ground Level : +1.8m

GreyMedium stiff to stiff

low to medium plastic CLAY

GreyStiff

non plastic SILT

GreyLoose to medium dense

fine SAND with trace of mica

GreyMedium dense

fine SAND with trace of mica

5.0

2.0

5.0

D43

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 74.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P13

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D42

D41

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

41.0

42.0

43.0

44.0

45.0

46.0

47.0

48.0

49.0

50.0

51.0

52.0

53.0

54.0

55.0

56.0

57.0

58.0

59.0

60.0

D44

D45

D46

D47

D48

D49

D50

D51

D52

D53

D54

D55

D56

D57

D58

D59

D60Note : Boring Terminated at 74.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

43.0

44.0

45.0

46.0

47.0

41.0

42.0

6 7 7 14

6 6 7 13

5 5 6 11

6 7 7 14

5 6 7 13

5 5 7 12

6 7 8 15

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

48.0 9 8 7 15

49.0 6 7 7 14

50.0 5 6 7 13

51.0 6 7 8 15

52.0 5 7 9 16

53.0 6 7 8 15

54.0 7 7 8 15

55.0 5 6 7 13

56.0 6 8 8 16

57.0 6 8 9 17

58.0 7 8 8 16

59.0 5 6 7 13

60.0 5 6 8 14Cont'd...................

Date Completed : 09-02-2012Date Started : 07-02-2012Ground/ Water Level : +0.74mExisting Ground Level : +1.8m

GreyStiff to very stiff

low to high plastic CLAY30.0

D63

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 74.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P13

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D62

D61

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

61.0

62.0

63.0

64.0

65.0

66.0

67.0

68.0

69.0

70.0

71.0

72.0

73.0

74.0

75.0

76.0

77.0

78.0

79.0

80.0

D64

D65

D66

D67

D68

D69

D70

D71

D72

D73

D74

D75

D76

D77

D78

D79

D80Note : Boring Terminated at 74.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

End of Boring

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

63.0

64.0

65.0

66.0

67.0

61.0

62.0

6 7 8 15

5 7 7 14

6 7 9 16

7 8 9 17

8 7 8 15

9 9 8 17

8 8 10 18

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

68.0 8 9 11 20

69.0 67 - - 67

70.0 50 - - 50

71.0 50 - - 50

72.0 50 - - 50

73.0 50 - - 50

74.0 50 - - 50

Date Completed : 09-02-2012Date Started : 07-02-2012Ground/ Water Level : +0.74mExisting Ground Level : +1.8m

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

Light greyVery dense

fine SAND with trace of mica

6.0

GreyStiff to very stiff

low to high plastic CLAY

D3

12.0

7.0

9.0

8.0

10.0

11.0

6.0

5.0

4.0

3.0

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P14

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D2

D1

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

1 1 1

2.0

1.0

2010

2

50 6030 40

14.0

13.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

11.0

12.0

13.0

14.0

15.0

16.0

17.0

18.0

19

20.0

D4

D5

D6

D7

D8

D9

D10

D11

D12

D13

D14

D15

D16

D17

D18

D19

D20

15.0

16.0

17.0

18.0

19.0

20.0

Date Completed : 15-02-2012Date Started : 14-02-2012Ground/ Water Level : -0.56m

Note : Boring Terminated at 72.0m from EGLD for Disturbed sampleUD for Undisturbed sample

8.0

Cont'd...................Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

GreyVery soft to soft

low plastic CLAY

1 1 1 2

1 1 1 2

1 1 1 2

1 0 1 1

1 0 1 1

1 0 1 1

1 0 1 1

3 4 5 9

2 3 4 7

3 4 5 9

2 3 7 10

2 3 3 6

2 4 4 8

3 3 4 7

4 6 6 12

5 6 7 13

5 7 8 15

4 6 7 13

5 7 8 15

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

Existing Ground Level : +0.2m

GreyVery loose to loose

silty fine SAND with trace of mica

GreyMedium dense

fine SAND with trace of mica

7.0

11.0

D23

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P14

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D22

D21

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

21.0

22.0

23.0

24.0

25.0

26.0

27.0

28.0

29.0

30.0

31.0

32.0

33.0

34.0

35.0

36.0

37.0

38.0

39.0

40.0

D24

D25

D26

D27

D28

D29

D30

D31

D32

D33

D34

D35

D36

D37

D38

D39

D40Note : Boring Terminated at 72.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

23.0

24.0

25.0

26.0

27.0

21.0

22.0

5 6 8 14

4 5 7 12

3 5 6 11

3 4 5 9

3 4 7 11

4 4 6 10

4 5 7 12

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

28.0 7 6 9 15

29.0 9 13 13 26

30.0 11 15 16 31

31.0 4 6 8 14

32.0 3 5 6 11

33.0 3 5 5 10

34.0 3 5 7 12

35.0 4 4 6 10

36.0 6 6 5 11

37.0 3 4 6 10

38.0 3 4 5 9

39.0 4 5 6 11

40.0 5 6 7 13Cont'd...................

Date Completed : 15-02-2012Date Started : 14-02-2012Ground/ Water Level : -0.56mExisting Ground Level : +0.2m

GreyMedium dense

fine SAND with trace of mica

GreyStiff

medium plastic CLAY

GreyMedium dense

fine to medium SAND with trace of mica

GreyStiff to very stiff

non plastic SILT with trace of mica

3.0

4.0

15.0

D43

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P14

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D42

D41

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

41.0

42.0

43.0

44.0

45.0

46.0

47.0

48.0

49.0

50.0

51.0

52.0

53.0

54.0

55.0

56.0

57.0

58.0

59.0

60.0

D44

D45

D46

D47

D48

D49

D50

D51

D52

D53

D54

D55

D56

D57

D58

D59

D60Note : Boring Terminated at 72.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

43.0

44.0

45.0

46.0

47.0

41.0

42.0

4 5 7 12

5 6 6 12

3 5 5 10

4 5 3 8

6 5 4 9

4 6 6 12

4 5 5 10

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

48.0 3 4 7 11

49.0 3 6 5 11

50.0 3 6 7 13

51.0 4 5 6 11

52.0 5 7 7 14

53.0 6 6 5 11

54.0 6 5 6 11

55.0 6 6 7 13

56.0 6 7 7 14

57.0 6 7 8 15

58.0 7 7 6 13

59.0 6 7 7 14

60.0 16 14 10 24Cont'd...................

Date Completed : 15-02-2012Date Started : 14-02-2012Ground/ Water Level : -0.56mExisting Ground Level : +0.2m

GreyStiff to very stiff

medium plastic CLAY with very thin layer12.0

GreyStiff to very stiff

non plastic SILT with trace of mica

of fine sand

GreyStiff to very stiff

medium plastic organic CLAY with very thin layer of fine sand2.0

D63

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P14

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D62

D61

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

61.0

62.0

63.0

64.0

65.0

66.0

67.0

68.0

69.0

70.0

71.0

72.0

73.0

74.0

75.0

76.0

77.0

78.0

79.0

80.0

D64

D65

D66

D67

D68

D69

D70

D71

D72

D73

D74

D75

D76

D77

D78

D79

D80Note : Boring Terminated at 72.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

End of Boring

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

63.0

64.0

65.0

66.0

67.0

61.0

62.0

9 10 10 20

7 8 9 17

4 5 5 10

5 8 9 17

6 10 10 20

6 12 11 23

7 9 11 20

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

68.0 70 - - 70

69.0 60 - - 60

70.0 60 - - 60

71.0 70 - - 70

72.0 72 - - 72

Date Completed : 15-02-2012Date Started : 14-02-2012Ground/ Water Level : -0.56mExisting Ground Level : +0.2m

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

BlackVery stiff

medium plastic organic CLAY

BrownVery dense

fine SAND with trace of mica

3.0

5.0

GreyVery stiff

medium plastic CLAY with very thin layer of fine sand4.0

D3

12.0

7.0

9.0

8.0

10.0

11.0

6.0

5.0

4.0

3.0

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P15

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D2

D1

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

1 1 1

2.0

1.0

2010

2

50 6030 40

14.0

13.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

11.0

12.0

13.0

14.0

15.0

16.0

17.0

18.0

19

20.0

D4

D5

D6

D7

D8

D9

D10

D11

D12

D13

D14

D15

D16

D17

D18

D19

D20

15.0

16.0

17.0

18.0

19.0

20.0

Date Completed : 10-02-2012Date Started : 09-02-2012Ground/ Water Level : +1.14m

Note : Boring Terminated at 72.0m from EGLD for Disturbed sampleUD for Undisturbed sample

2.0

Cont'd...................Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

GreyVery soft

low plastic silty CLAY

1 - 1 1

1 - 1 1

1 - 1 1

1 - 1 1

1 - 1 1

1 - 1 1

1 1 1 2

1 1 1 2

4 5 7 12

5 6 8 14

6 3 3 6

4 4 5 9

4 4 6 10

4 5 7 12

3 5 6 11

4 6 6 12

4 5 7 12

7 9 10 19

5 6 7 13

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

Existing Ground Level : +1.9m

Grey to light greyLoose to medium dense

fine SAND with trace of mica27.0

GreyVery soft

non plastic SILT with trace of mica

7.0

D23

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P15

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D22

D21

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

21.0

22.0

23.0

24.0

25.0

26.0

27.0

28.0

29.0

30.0

31.0

32.0

33.0

34.0

35.0

36.0

37.0

38.0

39.0

40.0

D24

D25

D26

D27

D28

D29

D30

D31

D32

D33

D34

D35

D36

D37

D38

D39

D40Note : Boring Terminated at 72.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

23.0

24.0

25.0

26.0

27.0

21.0

22.0

4 6 10 16

4 6 7 13

4 5 7 12

6 9 8 17

8 10 9 19

7 8 10 18

6 7 9 16

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

28.0 6 7 8 15

29.0 6 7 7 14

30.0 6 7 9 16

31.0 6 7 8 15

32.0 5 7 7 14

33.0 5 6 8 14

34.0 7 8 8 16

35.0 6 7 8 15

36.0 7 8 9 17

37.0 5 6 8 14

38.0 6 7 8 15

39.0 7 7 6 13

40.0 8 8 7 15Cont'd...................

Date Completed : 10-02-2012Date Started : 09-02-2012Ground/ Water Level : +1.14mExisting Ground Level : +1.9m

Grey to light greyLoose to medium dense

fine SAND with trace of mica

24.0Grey Stiff to very stiff

non plastic SILT with trace of mica

D43

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P15

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D42

D41

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

41.0

42.0

43.0

44.0

45.0

46.0

47.0

48.0

49.0

50.0

51.0

52.0

53.0

54.0

55.0

56.0

57.0

58.0

59.0

60.0

D44

D45

D46

D47

D48

D49

D50

D51

D52

D53

D54

D55

D56

D57

D58

D59

D60Note : Boring Terminated at 72.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

43.0

44.0

45.0

46.0

47.0

41.0

42.0

7 6 8 14

6 6 7 13

5 5 6 11

6 7 6 13

5 6 6 12

6 6 5 11

6 6 7 13

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

48.0 5 5 7 12

49.0 6 8 6 14

50.0 8 6 7 13

51.0 7 7 5 12

52.0 6 6 7 13

53.0 5 5 6 11

54.0 6 5 4 9

55.0 5 6 7 13

56.0 6 8 7 15

57.0 5 8 9 17

58.0 6 6 8 14

59.0 6 7 8 15

60.0 5 6 6 12Cont'd...................

Date Completed : 10-02-2012Date Started : 09-02-2012Ground/ Water Level : +1.14mExisting Ground Level : +1.9m

Dark grey Stiff to very stiff

high plastic CLAY

Grey Stiff to very stiff

non plastic SILT with trace of mica

4.0

D63

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P15

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D62

D61

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

61.0

62.0

63.0

64.0

65.0

66.0

67.0

68.0

69.0

70.0

71.0

72.0

73.0

74.0

75.0

76.0

77.0

78.0

79.0

80.0

D64

D65

D66

D67

D68

D69

D70

D71

D72

D73

D74

D75

D76

D77

D78

D79

D80Note : Boring Terminated at 72.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

End of Boring

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

63.0

64.0

65.0

66.0

67.0

61.0

62.0

8 15 21 36

10 17 22 39

5 5 7 12

6 7 7 14

7 9 7 16

6 10 10 20

8 12 10 22

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

68.0 50 - - 50

69.0 52 - - 52

70.0 50 - - 50

71.0

72.0

Date Completed : 10-02-2012Date Started : 09-02-2012Ground/ Water Level : +1.14mExisting Ground Level : +1.9m

50 - - 50

50 - - 50

For 100mm penetratiom

For 125mm penetratiom

For 100mm penetratiom

For 100mm penetratiom

For 100mm penetratiom

Grey Very dense

silty very fine SAND with trace of mica

Grey Dense

silty very fine SAND with trace of mica

Grey Stiff

non plastic SILT

Grey Very stiff

medium plastic CLAY

2.0

2.0

3.0

5.0

D3

12.0

7.0

9.0

8.0

10.0

11.0

6.0

5.0

4.0

3.0

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P16

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D2

D1

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

6 7 8

2.0

1.0

2010

15

50 6030 40

14.0

13.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

11.0

12.0

13.0

14.0

15.0

16.0

17.0

18.0

19

20.0

D4

D5

D6

D7

D8

D9

D10

D11

D12

D13

D14

D15

D16

D17

D18

D19

D20

15.0

16.0

17.0

18.0

19.0

20.0

Date Completed : 11-02-2012Date Started : 10-02-2012Ground/ Water Level : +0.96m

Note : Boring Terminated at 72.0m from EGLD for Disturbed sampleUD for Undisturbed sample

Cont'd...................Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

Light brown Medium dense

fine SAND with trace of mica

4 6 7 13

1 1 1 2

1 - 1 1

1 - 1 1

1 - 1 1

1 1 1 2

1 1 2 3

2 2 2 4

2 3 3 6

2 3 4 7

6 7 8 15

5 6 8 14

6 7 6 13

5 6 10 16

4 5 6 11

3 4 5 9

3 4 6 10

3 6 7 13

4 7 8 15

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

Existing Ground Level : +2.33m

Light grey Soft to medium stiff

non plastic SILT

Light grey to greyLoose to medium dense

silty fine SAND with trace of mica

2.0

8.0

17.0

D23

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P16

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D22

D21

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

21.0

22.0

23.0

24.0

25.0

26.0

27.0

28.0

29.0

30.0

31.0

32.0

33.0

34.0

35.0

36.0

37.0

38.0

39.0

40.0

D24

D25

D26

D27

D28

D29

D30

D31

D32

D33

D34

D35

D36

D37

D38

D39

D40Note : Boring Terminated at 72.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

23.0

24.0

25.0

26.0

27.0

21.0

22.0

4 7 10 17

5 8 8 16

3 5 7 12

3 4 6 10

3 4 7 11

3 5 8 13

4 6 8 14

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

28.0 2 4 3 7

29.0 3 4 5 9

30.0 5 4 8 12

31.0 4 5 6 11

32.0 4 6 7 13

33.0 3 5 7 12

34.0 3 4 6 10

35.0 3 4 5 9

36.0 3 3 5 8

37.0 3 4 5 9

38.0 4 5 5 10

39.0 3 4 4 8

40.0 3 5 6 11Cont'd...................

Date Completed : 11-02-2012Date Started : 10-02-2012Ground/ Water Level : +0.96mExisting Ground Level : +2.33m

Light grey to greyLoose to medium dense

silty fine SAND with trace of mica

Light grey Medium stiff to stiff

non plastic SILT with trace of mica21.0

D43

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P16

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D42

D41

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

41.0

42.0

43.0

44.0

45.0

46.0

47.0

48.0

49.0

50.0

51.0

52.0

53.0

54.0

55.0

56.0

57.0

58.0

59.0

60.0

D44

D45

D46

D47

D48

D49

D50

D51

D52

D53

D54

D55

D56

D57

D58

D59

D60Note : Boring Terminated at 72.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

43.0

44.0

45.0

46.0

47.0

41.0

42.0

3 5 5 10

4 5 6 11

4 6 7 13

5 6 7 13

5 7 7 14

5 6 7 13

4 5 5 10

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

48.0 5 6 5 11

49.0 4 5 5 10

50.0 5 5 6 11

51.0 3 4 5 9

52.0 3 4 6 10

53.0 4 5 6 11

54.0 6 5 6 11

55.0 6 7 6 13

56.0 5 6 8 14

57.0 6 6 6 12

58.0 7 6 7 13

59.0 5 5 7 12

60.0 6 7 7 14Cont'd...................

Date Completed : 11-02-2012Date Started : 10-02-2012Ground/ Water Level : +0.96mExisting Ground Level : +2.33m

Grey Stiff

medium plastic CLAY 7.0

Grey Stiff

non plastic SILT with trace of mica

5.0

Light grey Medium stiff to stiff

non plastic SILT with trace of mica

D63

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 72.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : P16

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D62

D61

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

61.0

62.0

63.0

64.0

65.0

66.0

67.0

68.0

69.0

70.0

71.0

72.0

73.0

74.0

75.0

76.0

77.0

78.0

79.0

80.0

D64

D65

D66

D67

D68

D69

D70

D71

D72

D73

D74

D75

D76

D77

D78

D79

D80Note : Boring Terminated at 72.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

End of Boring

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

63.0

64.0

65.0

66.0

67.0

61.0

62.0

6 7 9 16

6 8 10 18

7 10 15 25

6 9 12 21

7 10 12 22

8 9 10 19

7 10 12 22

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

68.0 50 - - 50

69.0

70.0

71.0

72.0

Date Completed : 11-02-2012Date Started : 10-02-2012Ground/ Water Level : +0.96mExisting Ground Level : +2.33m

50 - - 50

50 - - 50

50 - - 50

50 - - 50

For 150mm penetratiom

For 150mm penetratiom

For 125mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

Grey Stiff to very stiff

medium plastic CLAY

Light greyVery dense

fine SAND with trace of mica5.0

D3

12.0

7.0

9.0

8.0

10.0

11.0

6.0

5.0

4.0

3.0

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 78.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : A2

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D2

D1

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

6 7 8

2.0

1.0

2010

15

50 6030 40

14.0

13.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

11.0

12.0

13.0

14.0

15.0

16.0

17.0

18.0

19

20.0

D4

D5

D6

D7

D8

D9

D10

D11

D12

D13

D14

D15

D16

D17

D18

D19

D20

15.0

16.0

17.0

18.0

19.0

20.0

Date Completed : 13-02-2012Date Started : 12-02-2012Ground/ Water Level : +0.09m

Note : Boring Terminated at 78.0m from EGLD for Disturbed sampleUD for Undisturbed sample

14.0

Cont'd...................Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

6 8 10 18

5 6 12 18

3 3 5 8

2 3 2 5

2 2 3 5

2 1 2 3

2 2 2 4

2 2 3 5

2 3 3 6

2 3 4 7

2 2 3 5

2 3 3 6

3 3 4 7

7 7 5 12

5 6 7 13

5 6 6 12

6 6 8 14

5 6 6 12

4 6 5 11

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

Existing Ground Level : +4.2m

GreyMedium stiff to very stiff

non plastic SILT, few sand

GreyLoose to medium dense

silty fine SAND with trace of mica6.0

with trace of mica

D23

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 78.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : A2

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D22

D21

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

21.0

22.0

23.0

24.0

25.0

26.0

27.0

28.0

29.0

30.0

31.0

32.0

33.0

34.0

35.0

36.0

37.0

38.0

39.0

40.0

D24

D25

D26

D27

D28

D29

D30

D31

D32

D33

D34

D35

D36

D37

D38

D39

D40Note : Boring Terminated at 78.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

23.0

24.0

25.0

26.0

27.0

21.0

22.0

3 3 5 8

4 3 5 8

4 4 6 10

3 6 6 12

4 6 7 13

4 7 6 13

5 7 8 15

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

28.0 7 8 9 17

29.0 6 7 9 16

30.0 7 8 10 18

31.0 8 9 11 20

32.0 8 8 10 18

33.0 5 7 9 16

34.0 6 7 7 14

35.0 5 7 5 12

36.0 6 6 7 13

37.0 6 7 8 15

38.0 6 8 9 17

39.0 5 8 8 16

40.0 6 7 8 15Cont'd...................

Date Completed : 13-02-2012Date Started : 12-02-2012Ground/ Water Level : +0.09mExisting Ground Level : +4.2m

GreyStiff to very stiff

non plastic SILT with trace of mica

GreyStiff to very stiff

medium plastic CLAY

15.0

4.0

D43

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 78.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : A2

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D42

D41

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

41.0

42.0

43.0

44.0

45.0

46.0

47.0

48.0

49.0

50.0

51.0

52.0

53.0

54.0

55.0

56.0

57.0

58.0

59.0

60.0

D44

D45

D46

D47

D48

D49

D50

D51

D52

D53

D54

D55

D56

D57

D58

D59

D60Note : Boring Terminated at 78.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

43.0

44.0

45.0

46.0

47.0

41.0

42.0

5 6 8 14

4 5 7 12

5 6 7 13

6 5 8 14

6 7 9 16

7 7 8 15

6 8 9 17

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

48.0 7 8 8 16

49.0 6 7 8 15

50.0 5 7 7 14

51.0 6 6 7 13

52.0 5 7 8 15

53.0 5 5 7 12

54.0 6 6 7 13

55.0 7 7 8 15

56.0 6 6 7 13

57.0 5 5 6 11

58.0 6 7 7 14

59.0 6 6 7 13

60.0 5 7 8 15Cont'd...................

Date Completed : 13-02-2012Date Started : 12-02-2012Ground/ Water Level : +0.09mExisting Ground Level : +4.2m

GreyStiff to very stiff

non plastic SILT with trace of mica

18.0

GreyStiff

non plastic fine sandy SILT with trace of mica

2.0

D63

CLAY

Graphical Representation

DESCRIPTION OF SOIL STRATA

Depth of Boring : 78.0m

Boring Dia. : 100mmMethod of Boring : PercussionBore Hole No. : A2

Type

of S

ampl

e

Dep

th b

elow

G.L

(m)

Thic

knes

s in

(m)

D62

D61

Sam

ple

No.

Legend :SILTSAND

Blows on spoon

2010 50 6030 40

61.0

62.0

63.0

64.0

65.0

66.0

67.0

68.0

69.0

70.0

71.0

72.0

73.0

74.0

75.0

76.0

77.0

78.0

79.0

80.0

D64

D65

D66

D67

D68

D69

D70

D71

D72

D73

D74

D75

D76

D77

D78

D79

D80Note : Boring Terminated at 78.0m from EGL

D for Disturbed sampleUD for Undisturbed sample

End of Boring

Logged by : AzharCheck by : Mahabub

Sym

bol

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

15 c

m p

enet

ratio

n

SPT

inte

rval

s (m

)

N-V

alue

s

63.0

64.0

65.0

66.0

67.0

61.0

62.0

6 6 8 14

7 7 9 16

3 6 8 14

4 7 8 15

4 6 8 14

5 7 7 14

6 6 9 15

Client : Oriental Consultants Co. Ltd.

Location of Boring : Daudkandi

Project : Construction of Meghna-Gumti Bridge

Co-ordinates :

68.0 5 7 7 14

69.0 6 7 9 16

70.0 6 8 9 17

71.0 5 7 8 15

72.0 6 7 9 16

73.0 7 8 10 18

74.0 50 - - 50

75.0 55 - - 55

76.0 60 - - 60

77.0 60 - - 60

78.0 60 - - 60

Date Completed : 13-02-2012Date Started : 12-02-2012Ground/ Water Level : +0.09mExisting Ground Level : +4.2m

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

For 150mm penetratiom

Light greyVery dense

silty fine SAND with trace of mica

14.0

5.0

GreyStiff to very stiff

low to medium plastic CLAY

top related