Small Business Development Division Project Worksheet
ProjectContract Title MIA TANK FAR M UTILIT IES MODIFICATIONS Received Date 08102017 ProjectContract No WOl6A Funding Source
Department AVIATION TAC-R ADrvllNISTERED BY THE FUEL FACILITYEstimated Cost of ProjectBid $1 22000000
Resubmittal Date(s) Description of ProjectBid The project gOfll is 10 relocate the QverheCld clecrricll (FPL) and Telecommunications (ATampT) line 10 undermiddotground duel banks in the
ICilllry ofPelimcler ROltld and the MIA Trink Fann
Contract Measures Recommendation
lVleasu re Program Goal Percent Goal SBEGS 423
Goa l SBECONS 1258
Workforce Goal CWP 1000
Reasons for Recommendation
SMA LL BUSINESS ENTERPRISE - CONSTRUCTION (SBECONS) An analysis of the factors contained in Section VI C of [mplement lllg Order 3-22 indicates that a 1258 Small Business Enterprise - Construction (SBE-CONS) subcontrac tor goa l is appropriate for the trades of 237 tl0-Water And Sewer LlIle And Related Structures Construction (Modification to existing irrigation system workO at 5 t8 238320-Painting And Wall Covering Contractors (6 inch yellow pavement painting and bituminous prime coat work) at 029 and 2389 1 O-Site Preparation Cont ractors (Cleaning and Grubbing -earth work demolition of existing bituminous pavement onslle excavation and material removal wok and prof rolling work) at 7 tl
SMALL BUSINESS ENTERPRI SE - GOODS amp SERV ICES (SBElGS) An analysis of til e factors contained in section VIII B of Implementmg Order 3-41amp Ordinance 14-41 indicates that a 423 is appropriate for the
goods and services portIOn of thi s con tract in Landscapmg (Including Design Fertilizing Planting Etc But Not Grounds Maintenance or Tree Trimming Services) (Sodding) at 08 and (Modification of existing landscape) at 345
CWP Estimated Workforce CWP Workforce Recommendation
Commodity Code 98852-Landscaping (I ncluding Design Fertilizing Planting Etc But Not Grounds Maintenance Or Tree Trimming Services) Trade Category 237 110-Water And Sewer Line And Retated Structures Construction 238320-Painting And Wall Covering Contractors 238910-Sne Preparation ~ontractors ____
Small Business Contract Measure Recommendation
of Item s
Subtrade Cat Estimated Value to Base Bid Availability
Landscaping (Including Design Fe rtili zin g Planting e tc But SBEGS $5160600 423 Not Grounds Maintenance or Tree Trimming Serv ices)
Site Preparation Con tractors SBECONS $8674200 711
Painting and Wall Covering Contractors SBECONS $353800 029
Water and Sewer Line and Related Structures Construction SBECONS $6319600 518
Total l__ $20508200 1681
Living Wages
Responsible Wages
YES
YES
D [XJ
NO [XJ NO D
Highway
Building
YES
YES
D D
NO [XJ NO [KJ
Heavy Construction YES [XJ NO D
Responsible Wages and Beneflls applies 10 all conslruclion projecls Oler 5 100000 Ihal do nOI ulllize federal fund For federally funded projeclS unless prohibiled by federal or Slale Iml or dlsallolVed by a gOIernmelllal funding source Ihe HG HER wage beWeen DOIis Bacon and Responsible Wages and Beneflls shall apply
DBDR0090 v 20160928
______ _ _______ __
Small Business Development Division MIAM Project Worksheet
ProjectlContract Title MI A TANK FARM UTILITIES MODIFICATIONS Received Date 081102017 ProjectContract No WOl6A FundingSource
Department AVIATION TAC-R ADMINI STERED BY THE FU EL FACILITY Estimated Cost of P rojectlBiu $1220000 00 ResubmittaIDate(s)
-shy - ---shyREVIEW
----shyRECOMMENDATION
Tier J Set Aside Tier 2 Set Aside _ _____________ _
Set Aside Level 1 Level 2 _______ _ Level 3 _ ________
Trade Set Aside (MCC) ____________ _ Goal _______ _ _ Bid Preference _____ _
No Measure _________________
CWP
Defer red -----fF---lt-I--f-
Date
DBDR0090 v20160928
______ _ _______ __
Small Business Development Division MIAM Project Worksheet
ProjectlContract Title MI A TANK FARM UTILITIES MODIFICATIONS Received Date 081102017 ProjectContract No WOl6A FundingSource
Department AVIATION TAC-R ADMINI STERED BY THE FU EL FACILITY Estimated Cost of P rojectlBiu $1220000 00 ResubmittaIDate(s)
-shy - ---shyREVIEW
----shyRECOMMENDATION
Tier J Set Aside Tier 2 Set Aside _ _____________ _
Set Aside Level 1 Level 2 _______ _ Level 3 _ ________
Trade Set Aside (MCC) ____________ _ Goal _______ _ _ Bid Preference _____ _
No Measure _________________
CWP
Defer red -----fF---lt-I--f-
Date
DBDR0090 v20160928