Application references Prestressing platforms
Silos Nuclear
Bridges Ga
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 219
MC805
productinformation
refrev nodatepage
M-293
118814
1 BRIDGES ref prod inf
Suez Bridges Contractor ARAB CONTRACTORS (Egypt)Technical FREYSSINET (Egypt)No of p latforms 1Capac ity of platform 15 tWeight of jacks 350 kgLifting points 2 TIRFOR TU-16H reeved with multiple sheave b locks
Viaduct on the Recht (Belgium) General Contractor TRAVAUX SA (Belgium)Technical Laboratoire de Cineacutematique (Subsidiary of Freyssinet)No of p latforms 2Capac ity of each platform 2 tWeight of jacks 350 kgLifting points 2 TIRFOR TU-32Hreeved with multiple sheave blocks M-605
access equipmentfor post tensioning of concrete
reference list
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 319
MC805
productinformation
refrev nodatepage
M-293
118824
2 SILOS ref prod inf
Alexandria Cement Works (Egypt) General Contractor ARAB CONTRACTORS (Egypt)
Technical FREYSSINETNo of p latforms 4Capac ity of each platform 15 tWeight of jacks 250 kgLifting points 4 TIRFOR TU-16H
Hassioud Cement Works (Egypt) General Contractor ARAB CONTRACTORS (Egypt)Technical DYWIDAGNo of p latforms 2Capac ity of each platform 2 tWeight of jacks 500 kgLifting points 4 TIRFOR TU-32HNo of access p latforms 2 fitted with TIRAK hoists M-263
Suez Cement Works (Egypt) General Contractor ARAB CONTRACTORS (Egypt)Technical DYWIDAGNo of p latforms 2 tWeight of jacks 500 kgLifting points 4 TIRFOR TU-32HNo of ac cess p latforms 2 fitted with TIRAK hoists M-146
Fujeirah Cement Works (Egypt) General Contractor VOEST (Austria)Civil Engineering Contractor SIX CONSTRUCT (Belgium)Technical DYWIDAGNo of p latforms 4Capac ity of each platform 15 tWeight of jacks 300 kgLifting points 4 TIRFOR TU-16HNo of ac cess p latforms 4 (fitted with TIRAK hoists)
Barbados Cement Works General Contractor SIX CONSTRUCT (Belgium)Technical DYWIDAGNo of p latforms 4Capac ity of each platform 15 tWeight of jacks 300 kgLifting points 4 TIRFOR TU-16HNo of ac cess p latforms 4 (fitted with TIRAK hoists)
Damman Cement Works General Contractor HELDE and FRANKE (Germany)(Saudi Arabia) Technical HELDE and FRANKE
No of p latforms 8Capac ity of each platform 15 tWeight of jacks 750 kgNo of ac cess p latforms 8 (fitted with TIRAK hoists)
Ain Touta Cement Works (Algeria) General Contractor SMIDTH (Denmark)Civil Engineering Contractor SIX CONSTRUCT (Belgium)Technical VSLNo of p latforms 4Capac ity of each platform 1300 kgWeight of jacks 70 kgLifting points 2 TIRAK T-1000 hoistsreeved with multiple sheave blocks
Ciment Franccedilais (Beaucaire France) Contrac tor REYDELTechnical CIPECLifting points 2 TIRAK T-1000 hoists
access equipmentfor post tensioning of concrete
reference list
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 419
MC805
productinformation
refrev nodatepage
M-293
118834
3 GAS RESERVOIRS ref prod inf
Das Island (United Arab Emirates) General Contractor Chicago Bridge and Iron (USA)
Civil Engineering Contractor SPIE - BATIGNOLLESTechnical FreyssinetNo of p latforms 8Capac ity of each platform 5 tWeight of jacks 25 tLifting points 2 TIRFOR TU-32Hreeved with multiple sheave blocksNo of ac cess c rad les 8 (fitted with TIRAK hoists) M-262
Zeebrugge Port Terminal (Belgium) General Contractor TRACTIONEL (Belgium)Civil Engineering Contractor SBBM (Belgium)Technical Laboratoire de Cineacutematique (Subsidiary of Freyssinet)No of p latforms 6Capac ity of each platform 3 t
Weight of jacks 750 kgLifting points 4 TIRFOR TU-32H M-261
Pyeong Taek (South Korea) General Contractor TECHNIGAZTechnical FREYSSINETNo of p latforms 6Capac ity of each platform 1 tWeight of jacks 350 kgLifting points 2 TIRAK T-1000 hoistsreeved with multiple sheave blocks
ENFERSA Factory Contractor AGROMAN Empresa Constructora SACartegena Spain Technical FREYSSINET
No of p latforms 3Capac ity of each platform 3 t
Lifting points 9 TIRFOR TU-16H M-400
access equipmentfor post tensioning of concrete
reference list
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 519
MC805
productinformation
refrev nodatepage
M-293
118844
4 NUCLEAR POWER STATIONS ref prod inf
Cattenom I and II (France) Contractor DUMEZ - SPIE
Technical GPN - VSLNo of platforms 2Capac ity of each p latform 6 tWeight of jacks 25 tLifting points 4 TIRFOR TU-32H
Thiange III (Belgium) Contractor Laboratoire de Cineacutematique (Subsidiary of Freyssinet)Technical FreyssinetNo of platforms 6Capac ity of each p latform 5 tWeight of jacks 16 tLifting points 4 TIRFOR TU-32H M-237
Belleville (France) Contractor GTMTechnical GPN - Freyssinet
No of platforms 2Capac ity of each p latform 6 tWeight of jacks 25 tLifting points 4 TIRFOR TU-32H
Other stations (USA) Contrac tor EWING - BURKE (USA)Technical PRESCON (Subsidiary of Freyssinet)
access equipmentfor post tensioning of concrete
reference list
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 619
MC1317
Application Handling an overhead gantrySite New Baldwin motorway bridge
Saybrook Connec ticutUSACustomer Joint-venture PERINI PCL C amp GEquipment 2 hydraulic TIRAK T-3000 hoists
Description
The new 770 m Baldwin motorway bridge over the Connecticutriver at Saybrook and Old Lyne has been built using a newmethod of post-tensioned pre-cast segmental concrete
The system used an overhead gantry to transport and positionthe prefabricated segmental concrete sections amongst theheaviest and widest ever used for balanced cantilever con-struction The 2 hydraulic TIRAK T-3000 hoists were used forhandling the overhead gantry These large 3 tonne capacityhoists operated in both directions for achieving the necessaryto-and-fro movements to position the segments
The pulling effort was chec ked by 2 DYNAFOR load ind icatorswith remote display mounted in the c rane cabin
The 2 post-tensioning p latforms were lifted and lowered by 2x2TIRAK T-1000 machines reeved on 4 p arts of wire rope (photo
PA5562)
Application c ompleted by GRIPHOIST Inc WestwoodUSA
refrev nodatepage
productinformation
M-607
079411
PA5562
PA5561 PA556
bridge
construction
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 719
MC1314
refrev nodatepage
productinformation
M-605
079411
bridge
construction
Application Positioning and pre-stressing prefabricatedbridge sections
Site Viaduct over the river Recht for theVerviers to Pruumlm motorway Belgium
General contractor Travaux SAPrestressing tec hnique Laboratoire de Cineacutematique
(Freyssinet subsidiary comp any)Equipment 2 special pre-stressing platforms 2000
kg capacity each fitted with 2 hydraulicTIRFOR TU-32H machines mounted in amultiple sheave system and 2 pre-stressing rams
Description of application
The platforms are freely suspended from and are able totraverse along the construction beam They are used for
a) Transporting the personnel and materials to the workingposition during the positioning and p re-stressing of theprefabricated bridge sections (weight 54 tonnes)These are transported and p ositioned using the guyedconstruction beam total length 94 m
b) Positioning the pre-stressing rams (weight 350 kg)using a c hain hoist which traverses along a fixed jib on
the platform
Application c ompleted b y SECALT SA Luxembourg
PA11210
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 819
MC729
refrev nodatepage
productinformation
M-2621109414
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on gazometers
Site Liq uid Natural Gaz reservoir (LNG)Das Island Abu-DhabiCustomer Freyssinet International
Boulogne-BillancourtFranceBuilding owner Abu Dhab i National Oil CorporationEquipment ndash 8 spec ial doub le-deck prestressing p latforms (1140 m long
cap 5400 kg) each eq uipped with 2 hydraulic TIRFOR TU-32H machines 1 two-way power pack 4 safety devicesBLOCSTOP BS 3530 2 reeved suspension wire ropes 88 mlong 4 safety wire ropes 44 m long 4 manual chain hoists1500 kg for handling the tensioning jacks 1 access crad le(ALTA-Mono) with 1 TIRAK T-500 1 safety d evice BLOCSTOPBS 15301 2 safety wire ropes 45 m long
ndash 8 suspension brackets
Description of applicationThe work is to prestress the safety cement walls which surroundthe metallic reservoirs The eight doub le deck p latforms enablethe installation of the prestressing ropes and the tensioning jacks on the eight rig s simultaneouslyThe installation of prestressing ropes takes place at the up perlevel whereas the tensioning takes place at the lower level ofthe platformThe platform move along the rigs They are manoeuvred by tworeeved TIRFOR TU-32H and fitted with a suspension beamssystem and with chain hoists for handling the tensioning jack(500 kg)
PA16115
PA1619
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 919
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1019
MC729
refrev nodatepage
productinformation
M-2621109434
access equipmentfor post tensioning of concrete
drawing 811008B03
4 7 0 0
TIRFORTUndash32H
ladder
working platform
4650 2000
11300
4650
hydraulic pack
access cradle
28900
28100
chain pulley block1500 daN
jackK500
first working level
second level access traps
second working level
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1119
MC729
refrev nodatepage
productinformation
M-2621109444
access equipmentfor post tensioning of concrete
PA1615 - Overhead travelling trolley PA1614 - Hydraulic power pack
Tensioning jack K500 PA1613 - Hydraulic TIRFOR TU-32H
chain pulley block1500 daN
tensioning jackK500
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1219
MC728
refrev nodatepage
productinformation
M-2611109412
access equipmentfor post tensioning of concrete
Application Presterssing work (Freyssinet system)on 3 liquid gas tanks
Site Zeebrugge portBelgiumCustomer Laboratoire Cineacutematique BruxellesEquipment ndash 6 special prestressing platforms each fitted
with 4 hydraulic TIRFOR TU-32H 1 four waypower p ack 4 safety devices BLOCSTOP BS3530 1 electric trolley for the manoeuvring ofthe tensioning jack 8 suspension and safetywire ropes 40 m long
ndash 6 suspension systems
Description of applicationProblemThe work consists in tensioning the prestressing wireropes on the inner part cutting the extra length of the ropes andinjecting a protective cement to prevent corrosion
Each part is fitted with 3 ribsInner part height 2230 m d iam 7580 mOuter part height 14 m d iam 8580 mSolution The contractor has used the same platforms as forthe Nuclear Plant in Thiange (se M-237) They had beenpreviously mended and modified for this new applicationThe platforms are suspended to special suspension systemThey move in tandem along the ribsThey have three functions ndash lifting personnel and material up to the working position ndash operating on the left and right of each rib for the placement
of the prestressing ropes and tensioning jacks ndash handling the tensioning jacks (weig ht 750 kg) by means of an
electric trolley which moves along a mobile beam
A metallic frame construction is needed to support the beamwhich is an integral part of the platform
PA19618
PA1967 PA19614
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1319
MC728
refrev nodatepage
productinformation
M-2611109422
access equipmentfor post tensioning of concrete
PA1969 PA1969
+ 2232
+ 1400
+ 800
000
ndash 700
120deg120deg
120deg
Nervure 2
Rib 2
Nervure 3Rib 3
1 0 0 0
1 0 0 04
0 0 0
R 4 1 9 0 0
R 36 900
Nervure 1Rib 1
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1419
MC957
refrev nodatepage
productinformation
M-4001109411
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on a gas reservoir
Site ENFERSA fac tory Cartagena SASpain
Contractor AGROMAN Empresa Constructora SAEquipment ndash 3 x 10 m prestressing platforms capacity 3000 kg eac h
fitted with 3 hydraulic TIRFOR TU-16H machines controlledfrom a power pack 3 BLOCSTOP safety devices and 6 x 40m wire ropes
ndash 9 stirrups susp ended from trollies to allow movement of theplatforms
ndash 3 hoists for manoeuvring the prestressing jacks
Description of applicationIt was necessary to prestress the concrete safety ring whichcircled the metal reservoir The 3 platforms allowed the work tocontinue simultaneously on the 3 seams for fitting and tensioningthe horizontal wire ropes For work on the ledge the platformshad to be slightly reversed using the trollies on the suspensionstirrups
Application reacutealiseacutee par TRACTEL IBERICA Espagne
PA3093 PA3091
PA309
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1519
MC730
refrev nodatepage
productinformation
M-2631109412
access equipmentfor post tensioning of concrete
PA1171 PA1172
PA1175
Application Post tensioning work (DYWIDAG system)on conc rete silos
Site Hassioud Cement Plant EgyptCustomer The Arab Contractor Osman Ahmed Osman
CairoEquipment ndash 2 special prestressing platforms
each equipped with4 hydraulic TIRFOR TU-32H1 four-way power pack4 BLOCSTOP safety devices2x4 safety and suspension wire ropes
ndash 4 suspension brackets
Description of applicationIn the present application the platforms have been designedfor prestressing work according to the conception of theGerman spec ialised Co DYWIDAGOnly one mobile beam is used for hand ling the tensioning jackgiving ac cess to the wire ropes either on the right or left rigThis suspension beam is moved manually along two rails andis telescopic so that accurate positioning of the jack ispossibleThe platforms are fixed to the suspension brackets which areanchored at the top of the silo
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1619
MC730
refrev nodatepage
productinformation
M-2631109422
access equipmentfor post tensioning of concrete
PA1177
drawing 810101B01
TIRFORTUndash32H
2805
3390
2390
1220
8000
2805
3390
B
B
16001200
2000
Coupe B ndash B
Blocstop
chain pulleyblock 500 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1719
MC495
Application Post tensioning of cement silos(Freyssinet system)
Site Suez Cement Comp any SuezEg yp tCustomer The Arab Contractors Osman Ahmed OsmanCairoEgypt
Equipment 4 special ALTA platforms length 8 m width 156m
each fitted with ndash 4 motorised TIRFOR TU-16H machines ndash 1 four-way power pack ndash 4 BLOCSTOP BS 20301 safety devices ndash 8 wire ropes C12 80 m long ndash 2 overhead trolleys
Description of applicationProblem The tensioning of the prestressing ropes of 5 silos (3
for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant The silos are 76 m highAfter the tensioning the extra lengths of the ropes have to b ecut and to p revent corrosion a protective cement is injectedSolution The use of 4 supporting p latforms equipp ed with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wallThese platforms have 2 func tionsa) lifting personel and material up to the working level where
they can op erate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolley
running on a I-beamA metallic frame construction is needed to support theI-beam which is an integral part of the platform
refrev nodatepage
productinformation
M-1461109411
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8 0 0 0
8 0 0
Oslash 1 7 0 0 0
mobile beam
TIRFORTUndash16H
BLOCSTOP
4 way hydraulic power pack
PA1018
flooring
chain hoist250 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 219
MC805
productinformation
refrev nodatepage
M-293
118814
1 BRIDGES ref prod inf
Suez Bridges Contractor ARAB CONTRACTORS (Egypt)Technical FREYSSINET (Egypt)No of p latforms 1Capac ity of platform 15 tWeight of jacks 350 kgLifting points 2 TIRFOR TU-16H reeved with multiple sheave b locks
Viaduct on the Recht (Belgium) General Contractor TRAVAUX SA (Belgium)Technical Laboratoire de Cineacutematique (Subsidiary of Freyssinet)No of p latforms 2Capac ity of each platform 2 tWeight of jacks 350 kgLifting points 2 TIRFOR TU-32Hreeved with multiple sheave blocks M-605
access equipmentfor post tensioning of concrete
reference list
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 319
MC805
productinformation
refrev nodatepage
M-293
118824
2 SILOS ref prod inf
Alexandria Cement Works (Egypt) General Contractor ARAB CONTRACTORS (Egypt)
Technical FREYSSINETNo of p latforms 4Capac ity of each platform 15 tWeight of jacks 250 kgLifting points 4 TIRFOR TU-16H
Hassioud Cement Works (Egypt) General Contractor ARAB CONTRACTORS (Egypt)Technical DYWIDAGNo of p latforms 2Capac ity of each platform 2 tWeight of jacks 500 kgLifting points 4 TIRFOR TU-32HNo of access p latforms 2 fitted with TIRAK hoists M-263
Suez Cement Works (Egypt) General Contractor ARAB CONTRACTORS (Egypt)Technical DYWIDAGNo of p latforms 2 tWeight of jacks 500 kgLifting points 4 TIRFOR TU-32HNo of ac cess p latforms 2 fitted with TIRAK hoists M-146
Fujeirah Cement Works (Egypt) General Contractor VOEST (Austria)Civil Engineering Contractor SIX CONSTRUCT (Belgium)Technical DYWIDAGNo of p latforms 4Capac ity of each platform 15 tWeight of jacks 300 kgLifting points 4 TIRFOR TU-16HNo of ac cess p latforms 4 (fitted with TIRAK hoists)
Barbados Cement Works General Contractor SIX CONSTRUCT (Belgium)Technical DYWIDAGNo of p latforms 4Capac ity of each platform 15 tWeight of jacks 300 kgLifting points 4 TIRFOR TU-16HNo of ac cess p latforms 4 (fitted with TIRAK hoists)
Damman Cement Works General Contractor HELDE and FRANKE (Germany)(Saudi Arabia) Technical HELDE and FRANKE
No of p latforms 8Capac ity of each platform 15 tWeight of jacks 750 kgNo of ac cess p latforms 8 (fitted with TIRAK hoists)
Ain Touta Cement Works (Algeria) General Contractor SMIDTH (Denmark)Civil Engineering Contractor SIX CONSTRUCT (Belgium)Technical VSLNo of p latforms 4Capac ity of each platform 1300 kgWeight of jacks 70 kgLifting points 2 TIRAK T-1000 hoistsreeved with multiple sheave blocks
Ciment Franccedilais (Beaucaire France) Contrac tor REYDELTechnical CIPECLifting points 2 TIRAK T-1000 hoists
access equipmentfor post tensioning of concrete
reference list
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 419
MC805
productinformation
refrev nodatepage
M-293
118834
3 GAS RESERVOIRS ref prod inf
Das Island (United Arab Emirates) General Contractor Chicago Bridge and Iron (USA)
Civil Engineering Contractor SPIE - BATIGNOLLESTechnical FreyssinetNo of p latforms 8Capac ity of each platform 5 tWeight of jacks 25 tLifting points 2 TIRFOR TU-32Hreeved with multiple sheave blocksNo of ac cess c rad les 8 (fitted with TIRAK hoists) M-262
Zeebrugge Port Terminal (Belgium) General Contractor TRACTIONEL (Belgium)Civil Engineering Contractor SBBM (Belgium)Technical Laboratoire de Cineacutematique (Subsidiary of Freyssinet)No of p latforms 6Capac ity of each platform 3 t
Weight of jacks 750 kgLifting points 4 TIRFOR TU-32H M-261
Pyeong Taek (South Korea) General Contractor TECHNIGAZTechnical FREYSSINETNo of p latforms 6Capac ity of each platform 1 tWeight of jacks 350 kgLifting points 2 TIRAK T-1000 hoistsreeved with multiple sheave blocks
ENFERSA Factory Contractor AGROMAN Empresa Constructora SACartegena Spain Technical FREYSSINET
No of p latforms 3Capac ity of each platform 3 t
Lifting points 9 TIRFOR TU-16H M-400
access equipmentfor post tensioning of concrete
reference list
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 519
MC805
productinformation
refrev nodatepage
M-293
118844
4 NUCLEAR POWER STATIONS ref prod inf
Cattenom I and II (France) Contractor DUMEZ - SPIE
Technical GPN - VSLNo of platforms 2Capac ity of each p latform 6 tWeight of jacks 25 tLifting points 4 TIRFOR TU-32H
Thiange III (Belgium) Contractor Laboratoire de Cineacutematique (Subsidiary of Freyssinet)Technical FreyssinetNo of platforms 6Capac ity of each p latform 5 tWeight of jacks 16 tLifting points 4 TIRFOR TU-32H M-237
Belleville (France) Contractor GTMTechnical GPN - Freyssinet
No of platforms 2Capac ity of each p latform 6 tWeight of jacks 25 tLifting points 4 TIRFOR TU-32H
Other stations (USA) Contrac tor EWING - BURKE (USA)Technical PRESCON (Subsidiary of Freyssinet)
access equipmentfor post tensioning of concrete
reference list
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 619
MC1317
Application Handling an overhead gantrySite New Baldwin motorway bridge
Saybrook Connec ticutUSACustomer Joint-venture PERINI PCL C amp GEquipment 2 hydraulic TIRAK T-3000 hoists
Description
The new 770 m Baldwin motorway bridge over the Connecticutriver at Saybrook and Old Lyne has been built using a newmethod of post-tensioned pre-cast segmental concrete
The system used an overhead gantry to transport and positionthe prefabricated segmental concrete sections amongst theheaviest and widest ever used for balanced cantilever con-struction The 2 hydraulic TIRAK T-3000 hoists were used forhandling the overhead gantry These large 3 tonne capacityhoists operated in both directions for achieving the necessaryto-and-fro movements to position the segments
The pulling effort was chec ked by 2 DYNAFOR load ind icatorswith remote display mounted in the c rane cabin
The 2 post-tensioning p latforms were lifted and lowered by 2x2TIRAK T-1000 machines reeved on 4 p arts of wire rope (photo
PA5562)
Application c ompleted by GRIPHOIST Inc WestwoodUSA
refrev nodatepage
productinformation
M-607
079411
PA5562
PA5561 PA556
bridge
construction
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 719
MC1314
refrev nodatepage
productinformation
M-605
079411
bridge
construction
Application Positioning and pre-stressing prefabricatedbridge sections
Site Viaduct over the river Recht for theVerviers to Pruumlm motorway Belgium
General contractor Travaux SAPrestressing tec hnique Laboratoire de Cineacutematique
(Freyssinet subsidiary comp any)Equipment 2 special pre-stressing platforms 2000
kg capacity each fitted with 2 hydraulicTIRFOR TU-32H machines mounted in amultiple sheave system and 2 pre-stressing rams
Description of application
The platforms are freely suspended from and are able totraverse along the construction beam They are used for
a) Transporting the personnel and materials to the workingposition during the positioning and p re-stressing of theprefabricated bridge sections (weight 54 tonnes)These are transported and p ositioned using the guyedconstruction beam total length 94 m
b) Positioning the pre-stressing rams (weight 350 kg)using a c hain hoist which traverses along a fixed jib on
the platform
Application c ompleted b y SECALT SA Luxembourg
PA11210
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 819
MC729
refrev nodatepage
productinformation
M-2621109414
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on gazometers
Site Liq uid Natural Gaz reservoir (LNG)Das Island Abu-DhabiCustomer Freyssinet International
Boulogne-BillancourtFranceBuilding owner Abu Dhab i National Oil CorporationEquipment ndash 8 spec ial doub le-deck prestressing p latforms (1140 m long
cap 5400 kg) each eq uipped with 2 hydraulic TIRFOR TU-32H machines 1 two-way power pack 4 safety devicesBLOCSTOP BS 3530 2 reeved suspension wire ropes 88 mlong 4 safety wire ropes 44 m long 4 manual chain hoists1500 kg for handling the tensioning jacks 1 access crad le(ALTA-Mono) with 1 TIRAK T-500 1 safety d evice BLOCSTOPBS 15301 2 safety wire ropes 45 m long
ndash 8 suspension brackets
Description of applicationThe work is to prestress the safety cement walls which surroundthe metallic reservoirs The eight doub le deck p latforms enablethe installation of the prestressing ropes and the tensioning jacks on the eight rig s simultaneouslyThe installation of prestressing ropes takes place at the up perlevel whereas the tensioning takes place at the lower level ofthe platformThe platform move along the rigs They are manoeuvred by tworeeved TIRFOR TU-32H and fitted with a suspension beamssystem and with chain hoists for handling the tensioning jack(500 kg)
PA16115
PA1619
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 919
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1019
MC729
refrev nodatepage
productinformation
M-2621109434
access equipmentfor post tensioning of concrete
drawing 811008B03
4 7 0 0
TIRFORTUndash32H
ladder
working platform
4650 2000
11300
4650
hydraulic pack
access cradle
28900
28100
chain pulley block1500 daN
jackK500
first working level
second level access traps
second working level
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1119
MC729
refrev nodatepage
productinformation
M-2621109444
access equipmentfor post tensioning of concrete
PA1615 - Overhead travelling trolley PA1614 - Hydraulic power pack
Tensioning jack K500 PA1613 - Hydraulic TIRFOR TU-32H
chain pulley block1500 daN
tensioning jackK500
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1219
MC728
refrev nodatepage
productinformation
M-2611109412
access equipmentfor post tensioning of concrete
Application Presterssing work (Freyssinet system)on 3 liquid gas tanks
Site Zeebrugge portBelgiumCustomer Laboratoire Cineacutematique BruxellesEquipment ndash 6 special prestressing platforms each fitted
with 4 hydraulic TIRFOR TU-32H 1 four waypower p ack 4 safety devices BLOCSTOP BS3530 1 electric trolley for the manoeuvring ofthe tensioning jack 8 suspension and safetywire ropes 40 m long
ndash 6 suspension systems
Description of applicationProblemThe work consists in tensioning the prestressing wireropes on the inner part cutting the extra length of the ropes andinjecting a protective cement to prevent corrosion
Each part is fitted with 3 ribsInner part height 2230 m d iam 7580 mOuter part height 14 m d iam 8580 mSolution The contractor has used the same platforms as forthe Nuclear Plant in Thiange (se M-237) They had beenpreviously mended and modified for this new applicationThe platforms are suspended to special suspension systemThey move in tandem along the ribsThey have three functions ndash lifting personnel and material up to the working position ndash operating on the left and right of each rib for the placement
of the prestressing ropes and tensioning jacks ndash handling the tensioning jacks (weig ht 750 kg) by means of an
electric trolley which moves along a mobile beam
A metallic frame construction is needed to support the beamwhich is an integral part of the platform
PA19618
PA1967 PA19614
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1319
MC728
refrev nodatepage
productinformation
M-2611109422
access equipmentfor post tensioning of concrete
PA1969 PA1969
+ 2232
+ 1400
+ 800
000
ndash 700
120deg120deg
120deg
Nervure 2
Rib 2
Nervure 3Rib 3
1 0 0 0
1 0 0 04
0 0 0
R 4 1 9 0 0
R 36 900
Nervure 1Rib 1
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1419
MC957
refrev nodatepage
productinformation
M-4001109411
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on a gas reservoir
Site ENFERSA fac tory Cartagena SASpain
Contractor AGROMAN Empresa Constructora SAEquipment ndash 3 x 10 m prestressing platforms capacity 3000 kg eac h
fitted with 3 hydraulic TIRFOR TU-16H machines controlledfrom a power pack 3 BLOCSTOP safety devices and 6 x 40m wire ropes
ndash 9 stirrups susp ended from trollies to allow movement of theplatforms
ndash 3 hoists for manoeuvring the prestressing jacks
Description of applicationIt was necessary to prestress the concrete safety ring whichcircled the metal reservoir The 3 platforms allowed the work tocontinue simultaneously on the 3 seams for fitting and tensioningthe horizontal wire ropes For work on the ledge the platformshad to be slightly reversed using the trollies on the suspensionstirrups
Application reacutealiseacutee par TRACTEL IBERICA Espagne
PA3093 PA3091
PA309
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1519
MC730
refrev nodatepage
productinformation
M-2631109412
access equipmentfor post tensioning of concrete
PA1171 PA1172
PA1175
Application Post tensioning work (DYWIDAG system)on conc rete silos
Site Hassioud Cement Plant EgyptCustomer The Arab Contractor Osman Ahmed Osman
CairoEquipment ndash 2 special prestressing platforms
each equipped with4 hydraulic TIRFOR TU-32H1 four-way power pack4 BLOCSTOP safety devices2x4 safety and suspension wire ropes
ndash 4 suspension brackets
Description of applicationIn the present application the platforms have been designedfor prestressing work according to the conception of theGerman spec ialised Co DYWIDAGOnly one mobile beam is used for hand ling the tensioning jackgiving ac cess to the wire ropes either on the right or left rigThis suspension beam is moved manually along two rails andis telescopic so that accurate positioning of the jack ispossibleThe platforms are fixed to the suspension brackets which areanchored at the top of the silo
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1619
MC730
refrev nodatepage
productinformation
M-2631109422
access equipmentfor post tensioning of concrete
PA1177
drawing 810101B01
TIRFORTUndash32H
2805
3390
2390
1220
8000
2805
3390
B
B
16001200
2000
Coupe B ndash B
Blocstop
chain pulleyblock 500 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1719
MC495
Application Post tensioning of cement silos(Freyssinet system)
Site Suez Cement Comp any SuezEg yp tCustomer The Arab Contractors Osman Ahmed OsmanCairoEgypt
Equipment 4 special ALTA platforms length 8 m width 156m
each fitted with ndash 4 motorised TIRFOR TU-16H machines ndash 1 four-way power pack ndash 4 BLOCSTOP BS 20301 safety devices ndash 8 wire ropes C12 80 m long ndash 2 overhead trolleys
Description of applicationProblem The tensioning of the prestressing ropes of 5 silos (3
for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant The silos are 76 m highAfter the tensioning the extra lengths of the ropes have to b ecut and to p revent corrosion a protective cement is injectedSolution The use of 4 supporting p latforms equipp ed with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wallThese platforms have 2 func tionsa) lifting personel and material up to the working level where
they can op erate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolley
running on a I-beamA metallic frame construction is needed to support theI-beam which is an integral part of the platform
refrev nodatepage
productinformation
M-1461109411
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8 0 0 0
8 0 0
Oslash 1 7 0 0 0
mobile beam
TIRFORTUndash16H
BLOCSTOP
4 way hydraulic power pack
PA1018
flooring
chain hoist250 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 319
MC805
productinformation
refrev nodatepage
M-293
118824
2 SILOS ref prod inf
Alexandria Cement Works (Egypt) General Contractor ARAB CONTRACTORS (Egypt)
Technical FREYSSINETNo of p latforms 4Capac ity of each platform 15 tWeight of jacks 250 kgLifting points 4 TIRFOR TU-16H
Hassioud Cement Works (Egypt) General Contractor ARAB CONTRACTORS (Egypt)Technical DYWIDAGNo of p latforms 2Capac ity of each platform 2 tWeight of jacks 500 kgLifting points 4 TIRFOR TU-32HNo of access p latforms 2 fitted with TIRAK hoists M-263
Suez Cement Works (Egypt) General Contractor ARAB CONTRACTORS (Egypt)Technical DYWIDAGNo of p latforms 2 tWeight of jacks 500 kgLifting points 4 TIRFOR TU-32HNo of ac cess p latforms 2 fitted with TIRAK hoists M-146
Fujeirah Cement Works (Egypt) General Contractor VOEST (Austria)Civil Engineering Contractor SIX CONSTRUCT (Belgium)Technical DYWIDAGNo of p latforms 4Capac ity of each platform 15 tWeight of jacks 300 kgLifting points 4 TIRFOR TU-16HNo of ac cess p latforms 4 (fitted with TIRAK hoists)
Barbados Cement Works General Contractor SIX CONSTRUCT (Belgium)Technical DYWIDAGNo of p latforms 4Capac ity of each platform 15 tWeight of jacks 300 kgLifting points 4 TIRFOR TU-16HNo of ac cess p latforms 4 (fitted with TIRAK hoists)
Damman Cement Works General Contractor HELDE and FRANKE (Germany)(Saudi Arabia) Technical HELDE and FRANKE
No of p latforms 8Capac ity of each platform 15 tWeight of jacks 750 kgNo of ac cess p latforms 8 (fitted with TIRAK hoists)
Ain Touta Cement Works (Algeria) General Contractor SMIDTH (Denmark)Civil Engineering Contractor SIX CONSTRUCT (Belgium)Technical VSLNo of p latforms 4Capac ity of each platform 1300 kgWeight of jacks 70 kgLifting points 2 TIRAK T-1000 hoistsreeved with multiple sheave blocks
Ciment Franccedilais (Beaucaire France) Contrac tor REYDELTechnical CIPECLifting points 2 TIRAK T-1000 hoists
access equipmentfor post tensioning of concrete
reference list
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 419
MC805
productinformation
refrev nodatepage
M-293
118834
3 GAS RESERVOIRS ref prod inf
Das Island (United Arab Emirates) General Contractor Chicago Bridge and Iron (USA)
Civil Engineering Contractor SPIE - BATIGNOLLESTechnical FreyssinetNo of p latforms 8Capac ity of each platform 5 tWeight of jacks 25 tLifting points 2 TIRFOR TU-32Hreeved with multiple sheave blocksNo of ac cess c rad les 8 (fitted with TIRAK hoists) M-262
Zeebrugge Port Terminal (Belgium) General Contractor TRACTIONEL (Belgium)Civil Engineering Contractor SBBM (Belgium)Technical Laboratoire de Cineacutematique (Subsidiary of Freyssinet)No of p latforms 6Capac ity of each platform 3 t
Weight of jacks 750 kgLifting points 4 TIRFOR TU-32H M-261
Pyeong Taek (South Korea) General Contractor TECHNIGAZTechnical FREYSSINETNo of p latforms 6Capac ity of each platform 1 tWeight of jacks 350 kgLifting points 2 TIRAK T-1000 hoistsreeved with multiple sheave blocks
ENFERSA Factory Contractor AGROMAN Empresa Constructora SACartegena Spain Technical FREYSSINET
No of p latforms 3Capac ity of each platform 3 t
Lifting points 9 TIRFOR TU-16H M-400
access equipmentfor post tensioning of concrete
reference list
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 519
MC805
productinformation
refrev nodatepage
M-293
118844
4 NUCLEAR POWER STATIONS ref prod inf
Cattenom I and II (France) Contractor DUMEZ - SPIE
Technical GPN - VSLNo of platforms 2Capac ity of each p latform 6 tWeight of jacks 25 tLifting points 4 TIRFOR TU-32H
Thiange III (Belgium) Contractor Laboratoire de Cineacutematique (Subsidiary of Freyssinet)Technical FreyssinetNo of platforms 6Capac ity of each p latform 5 tWeight of jacks 16 tLifting points 4 TIRFOR TU-32H M-237
Belleville (France) Contractor GTMTechnical GPN - Freyssinet
No of platforms 2Capac ity of each p latform 6 tWeight of jacks 25 tLifting points 4 TIRFOR TU-32H
Other stations (USA) Contrac tor EWING - BURKE (USA)Technical PRESCON (Subsidiary of Freyssinet)
access equipmentfor post tensioning of concrete
reference list
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 619
MC1317
Application Handling an overhead gantrySite New Baldwin motorway bridge
Saybrook Connec ticutUSACustomer Joint-venture PERINI PCL C amp GEquipment 2 hydraulic TIRAK T-3000 hoists
Description
The new 770 m Baldwin motorway bridge over the Connecticutriver at Saybrook and Old Lyne has been built using a newmethod of post-tensioned pre-cast segmental concrete
The system used an overhead gantry to transport and positionthe prefabricated segmental concrete sections amongst theheaviest and widest ever used for balanced cantilever con-struction The 2 hydraulic TIRAK T-3000 hoists were used forhandling the overhead gantry These large 3 tonne capacityhoists operated in both directions for achieving the necessaryto-and-fro movements to position the segments
The pulling effort was chec ked by 2 DYNAFOR load ind icatorswith remote display mounted in the c rane cabin
The 2 post-tensioning p latforms were lifted and lowered by 2x2TIRAK T-1000 machines reeved on 4 p arts of wire rope (photo
PA5562)
Application c ompleted by GRIPHOIST Inc WestwoodUSA
refrev nodatepage
productinformation
M-607
079411
PA5562
PA5561 PA556
bridge
construction
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 719
MC1314
refrev nodatepage
productinformation
M-605
079411
bridge
construction
Application Positioning and pre-stressing prefabricatedbridge sections
Site Viaduct over the river Recht for theVerviers to Pruumlm motorway Belgium
General contractor Travaux SAPrestressing tec hnique Laboratoire de Cineacutematique
(Freyssinet subsidiary comp any)Equipment 2 special pre-stressing platforms 2000
kg capacity each fitted with 2 hydraulicTIRFOR TU-32H machines mounted in amultiple sheave system and 2 pre-stressing rams
Description of application
The platforms are freely suspended from and are able totraverse along the construction beam They are used for
a) Transporting the personnel and materials to the workingposition during the positioning and p re-stressing of theprefabricated bridge sections (weight 54 tonnes)These are transported and p ositioned using the guyedconstruction beam total length 94 m
b) Positioning the pre-stressing rams (weight 350 kg)using a c hain hoist which traverses along a fixed jib on
the platform
Application c ompleted b y SECALT SA Luxembourg
PA11210
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 819
MC729
refrev nodatepage
productinformation
M-2621109414
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on gazometers
Site Liq uid Natural Gaz reservoir (LNG)Das Island Abu-DhabiCustomer Freyssinet International
Boulogne-BillancourtFranceBuilding owner Abu Dhab i National Oil CorporationEquipment ndash 8 spec ial doub le-deck prestressing p latforms (1140 m long
cap 5400 kg) each eq uipped with 2 hydraulic TIRFOR TU-32H machines 1 two-way power pack 4 safety devicesBLOCSTOP BS 3530 2 reeved suspension wire ropes 88 mlong 4 safety wire ropes 44 m long 4 manual chain hoists1500 kg for handling the tensioning jacks 1 access crad le(ALTA-Mono) with 1 TIRAK T-500 1 safety d evice BLOCSTOPBS 15301 2 safety wire ropes 45 m long
ndash 8 suspension brackets
Description of applicationThe work is to prestress the safety cement walls which surroundthe metallic reservoirs The eight doub le deck p latforms enablethe installation of the prestressing ropes and the tensioning jacks on the eight rig s simultaneouslyThe installation of prestressing ropes takes place at the up perlevel whereas the tensioning takes place at the lower level ofthe platformThe platform move along the rigs They are manoeuvred by tworeeved TIRFOR TU-32H and fitted with a suspension beamssystem and with chain hoists for handling the tensioning jack(500 kg)
PA16115
PA1619
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 919
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1019
MC729
refrev nodatepage
productinformation
M-2621109434
access equipmentfor post tensioning of concrete
drawing 811008B03
4 7 0 0
TIRFORTUndash32H
ladder
working platform
4650 2000
11300
4650
hydraulic pack
access cradle
28900
28100
chain pulley block1500 daN
jackK500
first working level
second level access traps
second working level
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1119
MC729
refrev nodatepage
productinformation
M-2621109444
access equipmentfor post tensioning of concrete
PA1615 - Overhead travelling trolley PA1614 - Hydraulic power pack
Tensioning jack K500 PA1613 - Hydraulic TIRFOR TU-32H
chain pulley block1500 daN
tensioning jackK500
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1219
MC728
refrev nodatepage
productinformation
M-2611109412
access equipmentfor post tensioning of concrete
Application Presterssing work (Freyssinet system)on 3 liquid gas tanks
Site Zeebrugge portBelgiumCustomer Laboratoire Cineacutematique BruxellesEquipment ndash 6 special prestressing platforms each fitted
with 4 hydraulic TIRFOR TU-32H 1 four waypower p ack 4 safety devices BLOCSTOP BS3530 1 electric trolley for the manoeuvring ofthe tensioning jack 8 suspension and safetywire ropes 40 m long
ndash 6 suspension systems
Description of applicationProblemThe work consists in tensioning the prestressing wireropes on the inner part cutting the extra length of the ropes andinjecting a protective cement to prevent corrosion
Each part is fitted with 3 ribsInner part height 2230 m d iam 7580 mOuter part height 14 m d iam 8580 mSolution The contractor has used the same platforms as forthe Nuclear Plant in Thiange (se M-237) They had beenpreviously mended and modified for this new applicationThe platforms are suspended to special suspension systemThey move in tandem along the ribsThey have three functions ndash lifting personnel and material up to the working position ndash operating on the left and right of each rib for the placement
of the prestressing ropes and tensioning jacks ndash handling the tensioning jacks (weig ht 750 kg) by means of an
electric trolley which moves along a mobile beam
A metallic frame construction is needed to support the beamwhich is an integral part of the platform
PA19618
PA1967 PA19614
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1319
MC728
refrev nodatepage
productinformation
M-2611109422
access equipmentfor post tensioning of concrete
PA1969 PA1969
+ 2232
+ 1400
+ 800
000
ndash 700
120deg120deg
120deg
Nervure 2
Rib 2
Nervure 3Rib 3
1 0 0 0
1 0 0 04
0 0 0
R 4 1 9 0 0
R 36 900
Nervure 1Rib 1
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1419
MC957
refrev nodatepage
productinformation
M-4001109411
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on a gas reservoir
Site ENFERSA fac tory Cartagena SASpain
Contractor AGROMAN Empresa Constructora SAEquipment ndash 3 x 10 m prestressing platforms capacity 3000 kg eac h
fitted with 3 hydraulic TIRFOR TU-16H machines controlledfrom a power pack 3 BLOCSTOP safety devices and 6 x 40m wire ropes
ndash 9 stirrups susp ended from trollies to allow movement of theplatforms
ndash 3 hoists for manoeuvring the prestressing jacks
Description of applicationIt was necessary to prestress the concrete safety ring whichcircled the metal reservoir The 3 platforms allowed the work tocontinue simultaneously on the 3 seams for fitting and tensioningthe horizontal wire ropes For work on the ledge the platformshad to be slightly reversed using the trollies on the suspensionstirrups
Application reacutealiseacutee par TRACTEL IBERICA Espagne
PA3093 PA3091
PA309
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1519
MC730
refrev nodatepage
productinformation
M-2631109412
access equipmentfor post tensioning of concrete
PA1171 PA1172
PA1175
Application Post tensioning work (DYWIDAG system)on conc rete silos
Site Hassioud Cement Plant EgyptCustomer The Arab Contractor Osman Ahmed Osman
CairoEquipment ndash 2 special prestressing platforms
each equipped with4 hydraulic TIRFOR TU-32H1 four-way power pack4 BLOCSTOP safety devices2x4 safety and suspension wire ropes
ndash 4 suspension brackets
Description of applicationIn the present application the platforms have been designedfor prestressing work according to the conception of theGerman spec ialised Co DYWIDAGOnly one mobile beam is used for hand ling the tensioning jackgiving ac cess to the wire ropes either on the right or left rigThis suspension beam is moved manually along two rails andis telescopic so that accurate positioning of the jack ispossibleThe platforms are fixed to the suspension brackets which areanchored at the top of the silo
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1619
MC730
refrev nodatepage
productinformation
M-2631109422
access equipmentfor post tensioning of concrete
PA1177
drawing 810101B01
TIRFORTUndash32H
2805
3390
2390
1220
8000
2805
3390
B
B
16001200
2000
Coupe B ndash B
Blocstop
chain pulleyblock 500 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1719
MC495
Application Post tensioning of cement silos(Freyssinet system)
Site Suez Cement Comp any SuezEg yp tCustomer The Arab Contractors Osman Ahmed OsmanCairoEgypt
Equipment 4 special ALTA platforms length 8 m width 156m
each fitted with ndash 4 motorised TIRFOR TU-16H machines ndash 1 four-way power pack ndash 4 BLOCSTOP BS 20301 safety devices ndash 8 wire ropes C12 80 m long ndash 2 overhead trolleys
Description of applicationProblem The tensioning of the prestressing ropes of 5 silos (3
for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant The silos are 76 m highAfter the tensioning the extra lengths of the ropes have to b ecut and to p revent corrosion a protective cement is injectedSolution The use of 4 supporting p latforms equipp ed with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wallThese platforms have 2 func tionsa) lifting personel and material up to the working level where
they can op erate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolley
running on a I-beamA metallic frame construction is needed to support theI-beam which is an integral part of the platform
refrev nodatepage
productinformation
M-1461109411
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8 0 0 0
8 0 0
Oslash 1 7 0 0 0
mobile beam
TIRFORTUndash16H
BLOCSTOP
4 way hydraulic power pack
PA1018
flooring
chain hoist250 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 419
MC805
productinformation
refrev nodatepage
M-293
118834
3 GAS RESERVOIRS ref prod inf
Das Island (United Arab Emirates) General Contractor Chicago Bridge and Iron (USA)
Civil Engineering Contractor SPIE - BATIGNOLLESTechnical FreyssinetNo of p latforms 8Capac ity of each platform 5 tWeight of jacks 25 tLifting points 2 TIRFOR TU-32Hreeved with multiple sheave blocksNo of ac cess c rad les 8 (fitted with TIRAK hoists) M-262
Zeebrugge Port Terminal (Belgium) General Contractor TRACTIONEL (Belgium)Civil Engineering Contractor SBBM (Belgium)Technical Laboratoire de Cineacutematique (Subsidiary of Freyssinet)No of p latforms 6Capac ity of each platform 3 t
Weight of jacks 750 kgLifting points 4 TIRFOR TU-32H M-261
Pyeong Taek (South Korea) General Contractor TECHNIGAZTechnical FREYSSINETNo of p latforms 6Capac ity of each platform 1 tWeight of jacks 350 kgLifting points 2 TIRAK T-1000 hoistsreeved with multiple sheave blocks
ENFERSA Factory Contractor AGROMAN Empresa Constructora SACartegena Spain Technical FREYSSINET
No of p latforms 3Capac ity of each platform 3 t
Lifting points 9 TIRFOR TU-16H M-400
access equipmentfor post tensioning of concrete
reference list
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 519
MC805
productinformation
refrev nodatepage
M-293
118844
4 NUCLEAR POWER STATIONS ref prod inf
Cattenom I and II (France) Contractor DUMEZ - SPIE
Technical GPN - VSLNo of platforms 2Capac ity of each p latform 6 tWeight of jacks 25 tLifting points 4 TIRFOR TU-32H
Thiange III (Belgium) Contractor Laboratoire de Cineacutematique (Subsidiary of Freyssinet)Technical FreyssinetNo of platforms 6Capac ity of each p latform 5 tWeight of jacks 16 tLifting points 4 TIRFOR TU-32H M-237
Belleville (France) Contractor GTMTechnical GPN - Freyssinet
No of platforms 2Capac ity of each p latform 6 tWeight of jacks 25 tLifting points 4 TIRFOR TU-32H
Other stations (USA) Contrac tor EWING - BURKE (USA)Technical PRESCON (Subsidiary of Freyssinet)
access equipmentfor post tensioning of concrete
reference list
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 619
MC1317
Application Handling an overhead gantrySite New Baldwin motorway bridge
Saybrook Connec ticutUSACustomer Joint-venture PERINI PCL C amp GEquipment 2 hydraulic TIRAK T-3000 hoists
Description
The new 770 m Baldwin motorway bridge over the Connecticutriver at Saybrook and Old Lyne has been built using a newmethod of post-tensioned pre-cast segmental concrete
The system used an overhead gantry to transport and positionthe prefabricated segmental concrete sections amongst theheaviest and widest ever used for balanced cantilever con-struction The 2 hydraulic TIRAK T-3000 hoists were used forhandling the overhead gantry These large 3 tonne capacityhoists operated in both directions for achieving the necessaryto-and-fro movements to position the segments
The pulling effort was chec ked by 2 DYNAFOR load ind icatorswith remote display mounted in the c rane cabin
The 2 post-tensioning p latforms were lifted and lowered by 2x2TIRAK T-1000 machines reeved on 4 p arts of wire rope (photo
PA5562)
Application c ompleted by GRIPHOIST Inc WestwoodUSA
refrev nodatepage
productinformation
M-607
079411
PA5562
PA5561 PA556
bridge
construction
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 719
MC1314
refrev nodatepage
productinformation
M-605
079411
bridge
construction
Application Positioning and pre-stressing prefabricatedbridge sections
Site Viaduct over the river Recht for theVerviers to Pruumlm motorway Belgium
General contractor Travaux SAPrestressing tec hnique Laboratoire de Cineacutematique
(Freyssinet subsidiary comp any)Equipment 2 special pre-stressing platforms 2000
kg capacity each fitted with 2 hydraulicTIRFOR TU-32H machines mounted in amultiple sheave system and 2 pre-stressing rams
Description of application
The platforms are freely suspended from and are able totraverse along the construction beam They are used for
a) Transporting the personnel and materials to the workingposition during the positioning and p re-stressing of theprefabricated bridge sections (weight 54 tonnes)These are transported and p ositioned using the guyedconstruction beam total length 94 m
b) Positioning the pre-stressing rams (weight 350 kg)using a c hain hoist which traverses along a fixed jib on
the platform
Application c ompleted b y SECALT SA Luxembourg
PA11210
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 819
MC729
refrev nodatepage
productinformation
M-2621109414
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on gazometers
Site Liq uid Natural Gaz reservoir (LNG)Das Island Abu-DhabiCustomer Freyssinet International
Boulogne-BillancourtFranceBuilding owner Abu Dhab i National Oil CorporationEquipment ndash 8 spec ial doub le-deck prestressing p latforms (1140 m long
cap 5400 kg) each eq uipped with 2 hydraulic TIRFOR TU-32H machines 1 two-way power pack 4 safety devicesBLOCSTOP BS 3530 2 reeved suspension wire ropes 88 mlong 4 safety wire ropes 44 m long 4 manual chain hoists1500 kg for handling the tensioning jacks 1 access crad le(ALTA-Mono) with 1 TIRAK T-500 1 safety d evice BLOCSTOPBS 15301 2 safety wire ropes 45 m long
ndash 8 suspension brackets
Description of applicationThe work is to prestress the safety cement walls which surroundthe metallic reservoirs The eight doub le deck p latforms enablethe installation of the prestressing ropes and the tensioning jacks on the eight rig s simultaneouslyThe installation of prestressing ropes takes place at the up perlevel whereas the tensioning takes place at the lower level ofthe platformThe platform move along the rigs They are manoeuvred by tworeeved TIRFOR TU-32H and fitted with a suspension beamssystem and with chain hoists for handling the tensioning jack(500 kg)
PA16115
PA1619
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 919
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1019
MC729
refrev nodatepage
productinformation
M-2621109434
access equipmentfor post tensioning of concrete
drawing 811008B03
4 7 0 0
TIRFORTUndash32H
ladder
working platform
4650 2000
11300
4650
hydraulic pack
access cradle
28900
28100
chain pulley block1500 daN
jackK500
first working level
second level access traps
second working level
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1119
MC729
refrev nodatepage
productinformation
M-2621109444
access equipmentfor post tensioning of concrete
PA1615 - Overhead travelling trolley PA1614 - Hydraulic power pack
Tensioning jack K500 PA1613 - Hydraulic TIRFOR TU-32H
chain pulley block1500 daN
tensioning jackK500
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1219
MC728
refrev nodatepage
productinformation
M-2611109412
access equipmentfor post tensioning of concrete
Application Presterssing work (Freyssinet system)on 3 liquid gas tanks
Site Zeebrugge portBelgiumCustomer Laboratoire Cineacutematique BruxellesEquipment ndash 6 special prestressing platforms each fitted
with 4 hydraulic TIRFOR TU-32H 1 four waypower p ack 4 safety devices BLOCSTOP BS3530 1 electric trolley for the manoeuvring ofthe tensioning jack 8 suspension and safetywire ropes 40 m long
ndash 6 suspension systems
Description of applicationProblemThe work consists in tensioning the prestressing wireropes on the inner part cutting the extra length of the ropes andinjecting a protective cement to prevent corrosion
Each part is fitted with 3 ribsInner part height 2230 m d iam 7580 mOuter part height 14 m d iam 8580 mSolution The contractor has used the same platforms as forthe Nuclear Plant in Thiange (se M-237) They had beenpreviously mended and modified for this new applicationThe platforms are suspended to special suspension systemThey move in tandem along the ribsThey have three functions ndash lifting personnel and material up to the working position ndash operating on the left and right of each rib for the placement
of the prestressing ropes and tensioning jacks ndash handling the tensioning jacks (weig ht 750 kg) by means of an
electric trolley which moves along a mobile beam
A metallic frame construction is needed to support the beamwhich is an integral part of the platform
PA19618
PA1967 PA19614
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1319
MC728
refrev nodatepage
productinformation
M-2611109422
access equipmentfor post tensioning of concrete
PA1969 PA1969
+ 2232
+ 1400
+ 800
000
ndash 700
120deg120deg
120deg
Nervure 2
Rib 2
Nervure 3Rib 3
1 0 0 0
1 0 0 04
0 0 0
R 4 1 9 0 0
R 36 900
Nervure 1Rib 1
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1419
MC957
refrev nodatepage
productinformation
M-4001109411
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on a gas reservoir
Site ENFERSA fac tory Cartagena SASpain
Contractor AGROMAN Empresa Constructora SAEquipment ndash 3 x 10 m prestressing platforms capacity 3000 kg eac h
fitted with 3 hydraulic TIRFOR TU-16H machines controlledfrom a power pack 3 BLOCSTOP safety devices and 6 x 40m wire ropes
ndash 9 stirrups susp ended from trollies to allow movement of theplatforms
ndash 3 hoists for manoeuvring the prestressing jacks
Description of applicationIt was necessary to prestress the concrete safety ring whichcircled the metal reservoir The 3 platforms allowed the work tocontinue simultaneously on the 3 seams for fitting and tensioningthe horizontal wire ropes For work on the ledge the platformshad to be slightly reversed using the trollies on the suspensionstirrups
Application reacutealiseacutee par TRACTEL IBERICA Espagne
PA3093 PA3091
PA309
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1519
MC730
refrev nodatepage
productinformation
M-2631109412
access equipmentfor post tensioning of concrete
PA1171 PA1172
PA1175
Application Post tensioning work (DYWIDAG system)on conc rete silos
Site Hassioud Cement Plant EgyptCustomer The Arab Contractor Osman Ahmed Osman
CairoEquipment ndash 2 special prestressing platforms
each equipped with4 hydraulic TIRFOR TU-32H1 four-way power pack4 BLOCSTOP safety devices2x4 safety and suspension wire ropes
ndash 4 suspension brackets
Description of applicationIn the present application the platforms have been designedfor prestressing work according to the conception of theGerman spec ialised Co DYWIDAGOnly one mobile beam is used for hand ling the tensioning jackgiving ac cess to the wire ropes either on the right or left rigThis suspension beam is moved manually along two rails andis telescopic so that accurate positioning of the jack ispossibleThe platforms are fixed to the suspension brackets which areanchored at the top of the silo
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1619
MC730
refrev nodatepage
productinformation
M-2631109422
access equipmentfor post tensioning of concrete
PA1177
drawing 810101B01
TIRFORTUndash32H
2805
3390
2390
1220
8000
2805
3390
B
B
16001200
2000
Coupe B ndash B
Blocstop
chain pulleyblock 500 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1719
MC495
Application Post tensioning of cement silos(Freyssinet system)
Site Suez Cement Comp any SuezEg yp tCustomer The Arab Contractors Osman Ahmed OsmanCairoEgypt
Equipment 4 special ALTA platforms length 8 m width 156m
each fitted with ndash 4 motorised TIRFOR TU-16H machines ndash 1 four-way power pack ndash 4 BLOCSTOP BS 20301 safety devices ndash 8 wire ropes C12 80 m long ndash 2 overhead trolleys
Description of applicationProblem The tensioning of the prestressing ropes of 5 silos (3
for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant The silos are 76 m highAfter the tensioning the extra lengths of the ropes have to b ecut and to p revent corrosion a protective cement is injectedSolution The use of 4 supporting p latforms equipp ed with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wallThese platforms have 2 func tionsa) lifting personel and material up to the working level where
they can op erate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolley
running on a I-beamA metallic frame construction is needed to support theI-beam which is an integral part of the platform
refrev nodatepage
productinformation
M-1461109411
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8 0 0 0
8 0 0
Oslash 1 7 0 0 0
mobile beam
TIRFORTUndash16H
BLOCSTOP
4 way hydraulic power pack
PA1018
flooring
chain hoist250 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 519
MC805
productinformation
refrev nodatepage
M-293
118844
4 NUCLEAR POWER STATIONS ref prod inf
Cattenom I and II (France) Contractor DUMEZ - SPIE
Technical GPN - VSLNo of platforms 2Capac ity of each p latform 6 tWeight of jacks 25 tLifting points 4 TIRFOR TU-32H
Thiange III (Belgium) Contractor Laboratoire de Cineacutematique (Subsidiary of Freyssinet)Technical FreyssinetNo of platforms 6Capac ity of each p latform 5 tWeight of jacks 16 tLifting points 4 TIRFOR TU-32H M-237
Belleville (France) Contractor GTMTechnical GPN - Freyssinet
No of platforms 2Capac ity of each p latform 6 tWeight of jacks 25 tLifting points 4 TIRFOR TU-32H
Other stations (USA) Contrac tor EWING - BURKE (USA)Technical PRESCON (Subsidiary of Freyssinet)
access equipmentfor post tensioning of concrete
reference list
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 619
MC1317
Application Handling an overhead gantrySite New Baldwin motorway bridge
Saybrook Connec ticutUSACustomer Joint-venture PERINI PCL C amp GEquipment 2 hydraulic TIRAK T-3000 hoists
Description
The new 770 m Baldwin motorway bridge over the Connecticutriver at Saybrook and Old Lyne has been built using a newmethod of post-tensioned pre-cast segmental concrete
The system used an overhead gantry to transport and positionthe prefabricated segmental concrete sections amongst theheaviest and widest ever used for balanced cantilever con-struction The 2 hydraulic TIRAK T-3000 hoists were used forhandling the overhead gantry These large 3 tonne capacityhoists operated in both directions for achieving the necessaryto-and-fro movements to position the segments
The pulling effort was chec ked by 2 DYNAFOR load ind icatorswith remote display mounted in the c rane cabin
The 2 post-tensioning p latforms were lifted and lowered by 2x2TIRAK T-1000 machines reeved on 4 p arts of wire rope (photo
PA5562)
Application c ompleted by GRIPHOIST Inc WestwoodUSA
refrev nodatepage
productinformation
M-607
079411
PA5562
PA5561 PA556
bridge
construction
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 719
MC1314
refrev nodatepage
productinformation
M-605
079411
bridge
construction
Application Positioning and pre-stressing prefabricatedbridge sections
Site Viaduct over the river Recht for theVerviers to Pruumlm motorway Belgium
General contractor Travaux SAPrestressing tec hnique Laboratoire de Cineacutematique
(Freyssinet subsidiary comp any)Equipment 2 special pre-stressing platforms 2000
kg capacity each fitted with 2 hydraulicTIRFOR TU-32H machines mounted in amultiple sheave system and 2 pre-stressing rams
Description of application
The platforms are freely suspended from and are able totraverse along the construction beam They are used for
a) Transporting the personnel and materials to the workingposition during the positioning and p re-stressing of theprefabricated bridge sections (weight 54 tonnes)These are transported and p ositioned using the guyedconstruction beam total length 94 m
b) Positioning the pre-stressing rams (weight 350 kg)using a c hain hoist which traverses along a fixed jib on
the platform
Application c ompleted b y SECALT SA Luxembourg
PA11210
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 819
MC729
refrev nodatepage
productinformation
M-2621109414
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on gazometers
Site Liq uid Natural Gaz reservoir (LNG)Das Island Abu-DhabiCustomer Freyssinet International
Boulogne-BillancourtFranceBuilding owner Abu Dhab i National Oil CorporationEquipment ndash 8 spec ial doub le-deck prestressing p latforms (1140 m long
cap 5400 kg) each eq uipped with 2 hydraulic TIRFOR TU-32H machines 1 two-way power pack 4 safety devicesBLOCSTOP BS 3530 2 reeved suspension wire ropes 88 mlong 4 safety wire ropes 44 m long 4 manual chain hoists1500 kg for handling the tensioning jacks 1 access crad le(ALTA-Mono) with 1 TIRAK T-500 1 safety d evice BLOCSTOPBS 15301 2 safety wire ropes 45 m long
ndash 8 suspension brackets
Description of applicationThe work is to prestress the safety cement walls which surroundthe metallic reservoirs The eight doub le deck p latforms enablethe installation of the prestressing ropes and the tensioning jacks on the eight rig s simultaneouslyThe installation of prestressing ropes takes place at the up perlevel whereas the tensioning takes place at the lower level ofthe platformThe platform move along the rigs They are manoeuvred by tworeeved TIRFOR TU-32H and fitted with a suspension beamssystem and with chain hoists for handling the tensioning jack(500 kg)
PA16115
PA1619
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 919
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1019
MC729
refrev nodatepage
productinformation
M-2621109434
access equipmentfor post tensioning of concrete
drawing 811008B03
4 7 0 0
TIRFORTUndash32H
ladder
working platform
4650 2000
11300
4650
hydraulic pack
access cradle
28900
28100
chain pulley block1500 daN
jackK500
first working level
second level access traps
second working level
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1119
MC729
refrev nodatepage
productinformation
M-2621109444
access equipmentfor post tensioning of concrete
PA1615 - Overhead travelling trolley PA1614 - Hydraulic power pack
Tensioning jack K500 PA1613 - Hydraulic TIRFOR TU-32H
chain pulley block1500 daN
tensioning jackK500
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1219
MC728
refrev nodatepage
productinformation
M-2611109412
access equipmentfor post tensioning of concrete
Application Presterssing work (Freyssinet system)on 3 liquid gas tanks
Site Zeebrugge portBelgiumCustomer Laboratoire Cineacutematique BruxellesEquipment ndash 6 special prestressing platforms each fitted
with 4 hydraulic TIRFOR TU-32H 1 four waypower p ack 4 safety devices BLOCSTOP BS3530 1 electric trolley for the manoeuvring ofthe tensioning jack 8 suspension and safetywire ropes 40 m long
ndash 6 suspension systems
Description of applicationProblemThe work consists in tensioning the prestressing wireropes on the inner part cutting the extra length of the ropes andinjecting a protective cement to prevent corrosion
Each part is fitted with 3 ribsInner part height 2230 m d iam 7580 mOuter part height 14 m d iam 8580 mSolution The contractor has used the same platforms as forthe Nuclear Plant in Thiange (se M-237) They had beenpreviously mended and modified for this new applicationThe platforms are suspended to special suspension systemThey move in tandem along the ribsThey have three functions ndash lifting personnel and material up to the working position ndash operating on the left and right of each rib for the placement
of the prestressing ropes and tensioning jacks ndash handling the tensioning jacks (weig ht 750 kg) by means of an
electric trolley which moves along a mobile beam
A metallic frame construction is needed to support the beamwhich is an integral part of the platform
PA19618
PA1967 PA19614
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1319
MC728
refrev nodatepage
productinformation
M-2611109422
access equipmentfor post tensioning of concrete
PA1969 PA1969
+ 2232
+ 1400
+ 800
000
ndash 700
120deg120deg
120deg
Nervure 2
Rib 2
Nervure 3Rib 3
1 0 0 0
1 0 0 04
0 0 0
R 4 1 9 0 0
R 36 900
Nervure 1Rib 1
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1419
MC957
refrev nodatepage
productinformation
M-4001109411
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on a gas reservoir
Site ENFERSA fac tory Cartagena SASpain
Contractor AGROMAN Empresa Constructora SAEquipment ndash 3 x 10 m prestressing platforms capacity 3000 kg eac h
fitted with 3 hydraulic TIRFOR TU-16H machines controlledfrom a power pack 3 BLOCSTOP safety devices and 6 x 40m wire ropes
ndash 9 stirrups susp ended from trollies to allow movement of theplatforms
ndash 3 hoists for manoeuvring the prestressing jacks
Description of applicationIt was necessary to prestress the concrete safety ring whichcircled the metal reservoir The 3 platforms allowed the work tocontinue simultaneously on the 3 seams for fitting and tensioningthe horizontal wire ropes For work on the ledge the platformshad to be slightly reversed using the trollies on the suspensionstirrups
Application reacutealiseacutee par TRACTEL IBERICA Espagne
PA3093 PA3091
PA309
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1519
MC730
refrev nodatepage
productinformation
M-2631109412
access equipmentfor post tensioning of concrete
PA1171 PA1172
PA1175
Application Post tensioning work (DYWIDAG system)on conc rete silos
Site Hassioud Cement Plant EgyptCustomer The Arab Contractor Osman Ahmed Osman
CairoEquipment ndash 2 special prestressing platforms
each equipped with4 hydraulic TIRFOR TU-32H1 four-way power pack4 BLOCSTOP safety devices2x4 safety and suspension wire ropes
ndash 4 suspension brackets
Description of applicationIn the present application the platforms have been designedfor prestressing work according to the conception of theGerman spec ialised Co DYWIDAGOnly one mobile beam is used for hand ling the tensioning jackgiving ac cess to the wire ropes either on the right or left rigThis suspension beam is moved manually along two rails andis telescopic so that accurate positioning of the jack ispossibleThe platforms are fixed to the suspension brackets which areanchored at the top of the silo
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1619
MC730
refrev nodatepage
productinformation
M-2631109422
access equipmentfor post tensioning of concrete
PA1177
drawing 810101B01
TIRFORTUndash32H
2805
3390
2390
1220
8000
2805
3390
B
B
16001200
2000
Coupe B ndash B
Blocstop
chain pulleyblock 500 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1719
MC495
Application Post tensioning of cement silos(Freyssinet system)
Site Suez Cement Comp any SuezEg yp tCustomer The Arab Contractors Osman Ahmed OsmanCairoEgypt
Equipment 4 special ALTA platforms length 8 m width 156m
each fitted with ndash 4 motorised TIRFOR TU-16H machines ndash 1 four-way power pack ndash 4 BLOCSTOP BS 20301 safety devices ndash 8 wire ropes C12 80 m long ndash 2 overhead trolleys
Description of applicationProblem The tensioning of the prestressing ropes of 5 silos (3
for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant The silos are 76 m highAfter the tensioning the extra lengths of the ropes have to b ecut and to p revent corrosion a protective cement is injectedSolution The use of 4 supporting p latforms equipp ed with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wallThese platforms have 2 func tionsa) lifting personel and material up to the working level where
they can op erate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolley
running on a I-beamA metallic frame construction is needed to support theI-beam which is an integral part of the platform
refrev nodatepage
productinformation
M-1461109411
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8 0 0 0
8 0 0
Oslash 1 7 0 0 0
mobile beam
TIRFORTUndash16H
BLOCSTOP
4 way hydraulic power pack
PA1018
flooring
chain hoist250 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 619
MC1317
Application Handling an overhead gantrySite New Baldwin motorway bridge
Saybrook Connec ticutUSACustomer Joint-venture PERINI PCL C amp GEquipment 2 hydraulic TIRAK T-3000 hoists
Description
The new 770 m Baldwin motorway bridge over the Connecticutriver at Saybrook and Old Lyne has been built using a newmethod of post-tensioned pre-cast segmental concrete
The system used an overhead gantry to transport and positionthe prefabricated segmental concrete sections amongst theheaviest and widest ever used for balanced cantilever con-struction The 2 hydraulic TIRAK T-3000 hoists were used forhandling the overhead gantry These large 3 tonne capacityhoists operated in both directions for achieving the necessaryto-and-fro movements to position the segments
The pulling effort was chec ked by 2 DYNAFOR load ind icatorswith remote display mounted in the c rane cabin
The 2 post-tensioning p latforms were lifted and lowered by 2x2TIRAK T-1000 machines reeved on 4 p arts of wire rope (photo
PA5562)
Application c ompleted by GRIPHOIST Inc WestwoodUSA
refrev nodatepage
productinformation
M-607
079411
PA5562
PA5561 PA556
bridge
construction
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 719
MC1314
refrev nodatepage
productinformation
M-605
079411
bridge
construction
Application Positioning and pre-stressing prefabricatedbridge sections
Site Viaduct over the river Recht for theVerviers to Pruumlm motorway Belgium
General contractor Travaux SAPrestressing tec hnique Laboratoire de Cineacutematique
(Freyssinet subsidiary comp any)Equipment 2 special pre-stressing platforms 2000
kg capacity each fitted with 2 hydraulicTIRFOR TU-32H machines mounted in amultiple sheave system and 2 pre-stressing rams
Description of application
The platforms are freely suspended from and are able totraverse along the construction beam They are used for
a) Transporting the personnel and materials to the workingposition during the positioning and p re-stressing of theprefabricated bridge sections (weight 54 tonnes)These are transported and p ositioned using the guyedconstruction beam total length 94 m
b) Positioning the pre-stressing rams (weight 350 kg)using a c hain hoist which traverses along a fixed jib on
the platform
Application c ompleted b y SECALT SA Luxembourg
PA11210
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 819
MC729
refrev nodatepage
productinformation
M-2621109414
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on gazometers
Site Liq uid Natural Gaz reservoir (LNG)Das Island Abu-DhabiCustomer Freyssinet International
Boulogne-BillancourtFranceBuilding owner Abu Dhab i National Oil CorporationEquipment ndash 8 spec ial doub le-deck prestressing p latforms (1140 m long
cap 5400 kg) each eq uipped with 2 hydraulic TIRFOR TU-32H machines 1 two-way power pack 4 safety devicesBLOCSTOP BS 3530 2 reeved suspension wire ropes 88 mlong 4 safety wire ropes 44 m long 4 manual chain hoists1500 kg for handling the tensioning jacks 1 access crad le(ALTA-Mono) with 1 TIRAK T-500 1 safety d evice BLOCSTOPBS 15301 2 safety wire ropes 45 m long
ndash 8 suspension brackets
Description of applicationThe work is to prestress the safety cement walls which surroundthe metallic reservoirs The eight doub le deck p latforms enablethe installation of the prestressing ropes and the tensioning jacks on the eight rig s simultaneouslyThe installation of prestressing ropes takes place at the up perlevel whereas the tensioning takes place at the lower level ofthe platformThe platform move along the rigs They are manoeuvred by tworeeved TIRFOR TU-32H and fitted with a suspension beamssystem and with chain hoists for handling the tensioning jack(500 kg)
PA16115
PA1619
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 919
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1019
MC729
refrev nodatepage
productinformation
M-2621109434
access equipmentfor post tensioning of concrete
drawing 811008B03
4 7 0 0
TIRFORTUndash32H
ladder
working platform
4650 2000
11300
4650
hydraulic pack
access cradle
28900
28100
chain pulley block1500 daN
jackK500
first working level
second level access traps
second working level
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1119
MC729
refrev nodatepage
productinformation
M-2621109444
access equipmentfor post tensioning of concrete
PA1615 - Overhead travelling trolley PA1614 - Hydraulic power pack
Tensioning jack K500 PA1613 - Hydraulic TIRFOR TU-32H
chain pulley block1500 daN
tensioning jackK500
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1219
MC728
refrev nodatepage
productinformation
M-2611109412
access equipmentfor post tensioning of concrete
Application Presterssing work (Freyssinet system)on 3 liquid gas tanks
Site Zeebrugge portBelgiumCustomer Laboratoire Cineacutematique BruxellesEquipment ndash 6 special prestressing platforms each fitted
with 4 hydraulic TIRFOR TU-32H 1 four waypower p ack 4 safety devices BLOCSTOP BS3530 1 electric trolley for the manoeuvring ofthe tensioning jack 8 suspension and safetywire ropes 40 m long
ndash 6 suspension systems
Description of applicationProblemThe work consists in tensioning the prestressing wireropes on the inner part cutting the extra length of the ropes andinjecting a protective cement to prevent corrosion
Each part is fitted with 3 ribsInner part height 2230 m d iam 7580 mOuter part height 14 m d iam 8580 mSolution The contractor has used the same platforms as forthe Nuclear Plant in Thiange (se M-237) They had beenpreviously mended and modified for this new applicationThe platforms are suspended to special suspension systemThey move in tandem along the ribsThey have three functions ndash lifting personnel and material up to the working position ndash operating on the left and right of each rib for the placement
of the prestressing ropes and tensioning jacks ndash handling the tensioning jacks (weig ht 750 kg) by means of an
electric trolley which moves along a mobile beam
A metallic frame construction is needed to support the beamwhich is an integral part of the platform
PA19618
PA1967 PA19614
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1319
MC728
refrev nodatepage
productinformation
M-2611109422
access equipmentfor post tensioning of concrete
PA1969 PA1969
+ 2232
+ 1400
+ 800
000
ndash 700
120deg120deg
120deg
Nervure 2
Rib 2
Nervure 3Rib 3
1 0 0 0
1 0 0 04
0 0 0
R 4 1 9 0 0
R 36 900
Nervure 1Rib 1
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1419
MC957
refrev nodatepage
productinformation
M-4001109411
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on a gas reservoir
Site ENFERSA fac tory Cartagena SASpain
Contractor AGROMAN Empresa Constructora SAEquipment ndash 3 x 10 m prestressing platforms capacity 3000 kg eac h
fitted with 3 hydraulic TIRFOR TU-16H machines controlledfrom a power pack 3 BLOCSTOP safety devices and 6 x 40m wire ropes
ndash 9 stirrups susp ended from trollies to allow movement of theplatforms
ndash 3 hoists for manoeuvring the prestressing jacks
Description of applicationIt was necessary to prestress the concrete safety ring whichcircled the metal reservoir The 3 platforms allowed the work tocontinue simultaneously on the 3 seams for fitting and tensioningthe horizontal wire ropes For work on the ledge the platformshad to be slightly reversed using the trollies on the suspensionstirrups
Application reacutealiseacutee par TRACTEL IBERICA Espagne
PA3093 PA3091
PA309
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1519
MC730
refrev nodatepage
productinformation
M-2631109412
access equipmentfor post tensioning of concrete
PA1171 PA1172
PA1175
Application Post tensioning work (DYWIDAG system)on conc rete silos
Site Hassioud Cement Plant EgyptCustomer The Arab Contractor Osman Ahmed Osman
CairoEquipment ndash 2 special prestressing platforms
each equipped with4 hydraulic TIRFOR TU-32H1 four-way power pack4 BLOCSTOP safety devices2x4 safety and suspension wire ropes
ndash 4 suspension brackets
Description of applicationIn the present application the platforms have been designedfor prestressing work according to the conception of theGerman spec ialised Co DYWIDAGOnly one mobile beam is used for hand ling the tensioning jackgiving ac cess to the wire ropes either on the right or left rigThis suspension beam is moved manually along two rails andis telescopic so that accurate positioning of the jack ispossibleThe platforms are fixed to the suspension brackets which areanchored at the top of the silo
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1619
MC730
refrev nodatepage
productinformation
M-2631109422
access equipmentfor post tensioning of concrete
PA1177
drawing 810101B01
TIRFORTUndash32H
2805
3390
2390
1220
8000
2805
3390
B
B
16001200
2000
Coupe B ndash B
Blocstop
chain pulleyblock 500 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1719
MC495
Application Post tensioning of cement silos(Freyssinet system)
Site Suez Cement Comp any SuezEg yp tCustomer The Arab Contractors Osman Ahmed OsmanCairoEgypt
Equipment 4 special ALTA platforms length 8 m width 156m
each fitted with ndash 4 motorised TIRFOR TU-16H machines ndash 1 four-way power pack ndash 4 BLOCSTOP BS 20301 safety devices ndash 8 wire ropes C12 80 m long ndash 2 overhead trolleys
Description of applicationProblem The tensioning of the prestressing ropes of 5 silos (3
for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant The silos are 76 m highAfter the tensioning the extra lengths of the ropes have to b ecut and to p revent corrosion a protective cement is injectedSolution The use of 4 supporting p latforms equipp ed with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wallThese platforms have 2 func tionsa) lifting personel and material up to the working level where
they can op erate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolley
running on a I-beamA metallic frame construction is needed to support theI-beam which is an integral part of the platform
refrev nodatepage
productinformation
M-1461109411
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8 0 0 0
8 0 0
Oslash 1 7 0 0 0
mobile beam
TIRFORTUndash16H
BLOCSTOP
4 way hydraulic power pack
PA1018
flooring
chain hoist250 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 719
MC1314
refrev nodatepage
productinformation
M-605
079411
bridge
construction
Application Positioning and pre-stressing prefabricatedbridge sections
Site Viaduct over the river Recht for theVerviers to Pruumlm motorway Belgium
General contractor Travaux SAPrestressing tec hnique Laboratoire de Cineacutematique
(Freyssinet subsidiary comp any)Equipment 2 special pre-stressing platforms 2000
kg capacity each fitted with 2 hydraulicTIRFOR TU-32H machines mounted in amultiple sheave system and 2 pre-stressing rams
Description of application
The platforms are freely suspended from and are able totraverse along the construction beam They are used for
a) Transporting the personnel and materials to the workingposition during the positioning and p re-stressing of theprefabricated bridge sections (weight 54 tonnes)These are transported and p ositioned using the guyedconstruction beam total length 94 m
b) Positioning the pre-stressing rams (weight 350 kg)using a c hain hoist which traverses along a fixed jib on
the platform
Application c ompleted b y SECALT SA Luxembourg
PA11210
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 819
MC729
refrev nodatepage
productinformation
M-2621109414
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on gazometers
Site Liq uid Natural Gaz reservoir (LNG)Das Island Abu-DhabiCustomer Freyssinet International
Boulogne-BillancourtFranceBuilding owner Abu Dhab i National Oil CorporationEquipment ndash 8 spec ial doub le-deck prestressing p latforms (1140 m long
cap 5400 kg) each eq uipped with 2 hydraulic TIRFOR TU-32H machines 1 two-way power pack 4 safety devicesBLOCSTOP BS 3530 2 reeved suspension wire ropes 88 mlong 4 safety wire ropes 44 m long 4 manual chain hoists1500 kg for handling the tensioning jacks 1 access crad le(ALTA-Mono) with 1 TIRAK T-500 1 safety d evice BLOCSTOPBS 15301 2 safety wire ropes 45 m long
ndash 8 suspension brackets
Description of applicationThe work is to prestress the safety cement walls which surroundthe metallic reservoirs The eight doub le deck p latforms enablethe installation of the prestressing ropes and the tensioning jacks on the eight rig s simultaneouslyThe installation of prestressing ropes takes place at the up perlevel whereas the tensioning takes place at the lower level ofthe platformThe platform move along the rigs They are manoeuvred by tworeeved TIRFOR TU-32H and fitted with a suspension beamssystem and with chain hoists for handling the tensioning jack(500 kg)
PA16115
PA1619
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 919
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1019
MC729
refrev nodatepage
productinformation
M-2621109434
access equipmentfor post tensioning of concrete
drawing 811008B03
4 7 0 0
TIRFORTUndash32H
ladder
working platform
4650 2000
11300
4650
hydraulic pack
access cradle
28900
28100
chain pulley block1500 daN
jackK500
first working level
second level access traps
second working level
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1119
MC729
refrev nodatepage
productinformation
M-2621109444
access equipmentfor post tensioning of concrete
PA1615 - Overhead travelling trolley PA1614 - Hydraulic power pack
Tensioning jack K500 PA1613 - Hydraulic TIRFOR TU-32H
chain pulley block1500 daN
tensioning jackK500
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1219
MC728
refrev nodatepage
productinformation
M-2611109412
access equipmentfor post tensioning of concrete
Application Presterssing work (Freyssinet system)on 3 liquid gas tanks
Site Zeebrugge portBelgiumCustomer Laboratoire Cineacutematique BruxellesEquipment ndash 6 special prestressing platforms each fitted
with 4 hydraulic TIRFOR TU-32H 1 four waypower p ack 4 safety devices BLOCSTOP BS3530 1 electric trolley for the manoeuvring ofthe tensioning jack 8 suspension and safetywire ropes 40 m long
ndash 6 suspension systems
Description of applicationProblemThe work consists in tensioning the prestressing wireropes on the inner part cutting the extra length of the ropes andinjecting a protective cement to prevent corrosion
Each part is fitted with 3 ribsInner part height 2230 m d iam 7580 mOuter part height 14 m d iam 8580 mSolution The contractor has used the same platforms as forthe Nuclear Plant in Thiange (se M-237) They had beenpreviously mended and modified for this new applicationThe platforms are suspended to special suspension systemThey move in tandem along the ribsThey have three functions ndash lifting personnel and material up to the working position ndash operating on the left and right of each rib for the placement
of the prestressing ropes and tensioning jacks ndash handling the tensioning jacks (weig ht 750 kg) by means of an
electric trolley which moves along a mobile beam
A metallic frame construction is needed to support the beamwhich is an integral part of the platform
PA19618
PA1967 PA19614
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1319
MC728
refrev nodatepage
productinformation
M-2611109422
access equipmentfor post tensioning of concrete
PA1969 PA1969
+ 2232
+ 1400
+ 800
000
ndash 700
120deg120deg
120deg
Nervure 2
Rib 2
Nervure 3Rib 3
1 0 0 0
1 0 0 04
0 0 0
R 4 1 9 0 0
R 36 900
Nervure 1Rib 1
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1419
MC957
refrev nodatepage
productinformation
M-4001109411
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on a gas reservoir
Site ENFERSA fac tory Cartagena SASpain
Contractor AGROMAN Empresa Constructora SAEquipment ndash 3 x 10 m prestressing platforms capacity 3000 kg eac h
fitted with 3 hydraulic TIRFOR TU-16H machines controlledfrom a power pack 3 BLOCSTOP safety devices and 6 x 40m wire ropes
ndash 9 stirrups susp ended from trollies to allow movement of theplatforms
ndash 3 hoists for manoeuvring the prestressing jacks
Description of applicationIt was necessary to prestress the concrete safety ring whichcircled the metal reservoir The 3 platforms allowed the work tocontinue simultaneously on the 3 seams for fitting and tensioningthe horizontal wire ropes For work on the ledge the platformshad to be slightly reversed using the trollies on the suspensionstirrups
Application reacutealiseacutee par TRACTEL IBERICA Espagne
PA3093 PA3091
PA309
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1519
MC730
refrev nodatepage
productinformation
M-2631109412
access equipmentfor post tensioning of concrete
PA1171 PA1172
PA1175
Application Post tensioning work (DYWIDAG system)on conc rete silos
Site Hassioud Cement Plant EgyptCustomer The Arab Contractor Osman Ahmed Osman
CairoEquipment ndash 2 special prestressing platforms
each equipped with4 hydraulic TIRFOR TU-32H1 four-way power pack4 BLOCSTOP safety devices2x4 safety and suspension wire ropes
ndash 4 suspension brackets
Description of applicationIn the present application the platforms have been designedfor prestressing work according to the conception of theGerman spec ialised Co DYWIDAGOnly one mobile beam is used for hand ling the tensioning jackgiving ac cess to the wire ropes either on the right or left rigThis suspension beam is moved manually along two rails andis telescopic so that accurate positioning of the jack ispossibleThe platforms are fixed to the suspension brackets which areanchored at the top of the silo
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1619
MC730
refrev nodatepage
productinformation
M-2631109422
access equipmentfor post tensioning of concrete
PA1177
drawing 810101B01
TIRFORTUndash32H
2805
3390
2390
1220
8000
2805
3390
B
B
16001200
2000
Coupe B ndash B
Blocstop
chain pulleyblock 500 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1719
MC495
Application Post tensioning of cement silos(Freyssinet system)
Site Suez Cement Comp any SuezEg yp tCustomer The Arab Contractors Osman Ahmed OsmanCairoEgypt
Equipment 4 special ALTA platforms length 8 m width 156m
each fitted with ndash 4 motorised TIRFOR TU-16H machines ndash 1 four-way power pack ndash 4 BLOCSTOP BS 20301 safety devices ndash 8 wire ropes C12 80 m long ndash 2 overhead trolleys
Description of applicationProblem The tensioning of the prestressing ropes of 5 silos (3
for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant The silos are 76 m highAfter the tensioning the extra lengths of the ropes have to b ecut and to p revent corrosion a protective cement is injectedSolution The use of 4 supporting p latforms equipp ed with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wallThese platforms have 2 func tionsa) lifting personel and material up to the working level where
they can op erate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolley
running on a I-beamA metallic frame construction is needed to support theI-beam which is an integral part of the platform
refrev nodatepage
productinformation
M-1461109411
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8 0 0 0
8 0 0
Oslash 1 7 0 0 0
mobile beam
TIRFORTUndash16H
BLOCSTOP
4 way hydraulic power pack
PA1018
flooring
chain hoist250 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 819
MC729
refrev nodatepage
productinformation
M-2621109414
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on gazometers
Site Liq uid Natural Gaz reservoir (LNG)Das Island Abu-DhabiCustomer Freyssinet International
Boulogne-BillancourtFranceBuilding owner Abu Dhab i National Oil CorporationEquipment ndash 8 spec ial doub le-deck prestressing p latforms (1140 m long
cap 5400 kg) each eq uipped with 2 hydraulic TIRFOR TU-32H machines 1 two-way power pack 4 safety devicesBLOCSTOP BS 3530 2 reeved suspension wire ropes 88 mlong 4 safety wire ropes 44 m long 4 manual chain hoists1500 kg for handling the tensioning jacks 1 access crad le(ALTA-Mono) with 1 TIRAK T-500 1 safety d evice BLOCSTOPBS 15301 2 safety wire ropes 45 m long
ndash 8 suspension brackets
Description of applicationThe work is to prestress the safety cement walls which surroundthe metallic reservoirs The eight doub le deck p latforms enablethe installation of the prestressing ropes and the tensioning jacks on the eight rig s simultaneouslyThe installation of prestressing ropes takes place at the up perlevel whereas the tensioning takes place at the lower level ofthe platformThe platform move along the rigs They are manoeuvred by tworeeved TIRFOR TU-32H and fitted with a suspension beamssystem and with chain hoists for handling the tensioning jack(500 kg)
PA16115
PA1619
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 919
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1019
MC729
refrev nodatepage
productinformation
M-2621109434
access equipmentfor post tensioning of concrete
drawing 811008B03
4 7 0 0
TIRFORTUndash32H
ladder
working platform
4650 2000
11300
4650
hydraulic pack
access cradle
28900
28100
chain pulley block1500 daN
jackK500
first working level
second level access traps
second working level
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1119
MC729
refrev nodatepage
productinformation
M-2621109444
access equipmentfor post tensioning of concrete
PA1615 - Overhead travelling trolley PA1614 - Hydraulic power pack
Tensioning jack K500 PA1613 - Hydraulic TIRFOR TU-32H
chain pulley block1500 daN
tensioning jackK500
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1219
MC728
refrev nodatepage
productinformation
M-2611109412
access equipmentfor post tensioning of concrete
Application Presterssing work (Freyssinet system)on 3 liquid gas tanks
Site Zeebrugge portBelgiumCustomer Laboratoire Cineacutematique BruxellesEquipment ndash 6 special prestressing platforms each fitted
with 4 hydraulic TIRFOR TU-32H 1 four waypower p ack 4 safety devices BLOCSTOP BS3530 1 electric trolley for the manoeuvring ofthe tensioning jack 8 suspension and safetywire ropes 40 m long
ndash 6 suspension systems
Description of applicationProblemThe work consists in tensioning the prestressing wireropes on the inner part cutting the extra length of the ropes andinjecting a protective cement to prevent corrosion
Each part is fitted with 3 ribsInner part height 2230 m d iam 7580 mOuter part height 14 m d iam 8580 mSolution The contractor has used the same platforms as forthe Nuclear Plant in Thiange (se M-237) They had beenpreviously mended and modified for this new applicationThe platforms are suspended to special suspension systemThey move in tandem along the ribsThey have three functions ndash lifting personnel and material up to the working position ndash operating on the left and right of each rib for the placement
of the prestressing ropes and tensioning jacks ndash handling the tensioning jacks (weig ht 750 kg) by means of an
electric trolley which moves along a mobile beam
A metallic frame construction is needed to support the beamwhich is an integral part of the platform
PA19618
PA1967 PA19614
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1319
MC728
refrev nodatepage
productinformation
M-2611109422
access equipmentfor post tensioning of concrete
PA1969 PA1969
+ 2232
+ 1400
+ 800
000
ndash 700
120deg120deg
120deg
Nervure 2
Rib 2
Nervure 3Rib 3
1 0 0 0
1 0 0 04
0 0 0
R 4 1 9 0 0
R 36 900
Nervure 1Rib 1
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1419
MC957
refrev nodatepage
productinformation
M-4001109411
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on a gas reservoir
Site ENFERSA fac tory Cartagena SASpain
Contractor AGROMAN Empresa Constructora SAEquipment ndash 3 x 10 m prestressing platforms capacity 3000 kg eac h
fitted with 3 hydraulic TIRFOR TU-16H machines controlledfrom a power pack 3 BLOCSTOP safety devices and 6 x 40m wire ropes
ndash 9 stirrups susp ended from trollies to allow movement of theplatforms
ndash 3 hoists for manoeuvring the prestressing jacks
Description of applicationIt was necessary to prestress the concrete safety ring whichcircled the metal reservoir The 3 platforms allowed the work tocontinue simultaneously on the 3 seams for fitting and tensioningthe horizontal wire ropes For work on the ledge the platformshad to be slightly reversed using the trollies on the suspensionstirrups
Application reacutealiseacutee par TRACTEL IBERICA Espagne
PA3093 PA3091
PA309
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1519
MC730
refrev nodatepage
productinformation
M-2631109412
access equipmentfor post tensioning of concrete
PA1171 PA1172
PA1175
Application Post tensioning work (DYWIDAG system)on conc rete silos
Site Hassioud Cement Plant EgyptCustomer The Arab Contractor Osman Ahmed Osman
CairoEquipment ndash 2 special prestressing platforms
each equipped with4 hydraulic TIRFOR TU-32H1 four-way power pack4 BLOCSTOP safety devices2x4 safety and suspension wire ropes
ndash 4 suspension brackets
Description of applicationIn the present application the platforms have been designedfor prestressing work according to the conception of theGerman spec ialised Co DYWIDAGOnly one mobile beam is used for hand ling the tensioning jackgiving ac cess to the wire ropes either on the right or left rigThis suspension beam is moved manually along two rails andis telescopic so that accurate positioning of the jack ispossibleThe platforms are fixed to the suspension brackets which areanchored at the top of the silo
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1619
MC730
refrev nodatepage
productinformation
M-2631109422
access equipmentfor post tensioning of concrete
PA1177
drawing 810101B01
TIRFORTUndash32H
2805
3390
2390
1220
8000
2805
3390
B
B
16001200
2000
Coupe B ndash B
Blocstop
chain pulleyblock 500 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1719
MC495
Application Post tensioning of cement silos(Freyssinet system)
Site Suez Cement Comp any SuezEg yp tCustomer The Arab Contractors Osman Ahmed OsmanCairoEgypt
Equipment 4 special ALTA platforms length 8 m width 156m
each fitted with ndash 4 motorised TIRFOR TU-16H machines ndash 1 four-way power pack ndash 4 BLOCSTOP BS 20301 safety devices ndash 8 wire ropes C12 80 m long ndash 2 overhead trolleys
Description of applicationProblem The tensioning of the prestressing ropes of 5 silos (3
for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant The silos are 76 m highAfter the tensioning the extra lengths of the ropes have to b ecut and to p revent corrosion a protective cement is injectedSolution The use of 4 supporting p latforms equipp ed with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wallThese platforms have 2 func tionsa) lifting personel and material up to the working level where
they can op erate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolley
running on a I-beamA metallic frame construction is needed to support theI-beam which is an integral part of the platform
refrev nodatepage
productinformation
M-1461109411
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8 0 0 0
8 0 0
Oslash 1 7 0 0 0
mobile beam
TIRFORTUndash16H
BLOCSTOP
4 way hydraulic power pack
PA1018
flooring
chain hoist250 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 919
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1019
MC729
refrev nodatepage
productinformation
M-2621109434
access equipmentfor post tensioning of concrete
drawing 811008B03
4 7 0 0
TIRFORTUndash32H
ladder
working platform
4650 2000
11300
4650
hydraulic pack
access cradle
28900
28100
chain pulley block1500 daN
jackK500
first working level
second level access traps
second working level
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1119
MC729
refrev nodatepage
productinformation
M-2621109444
access equipmentfor post tensioning of concrete
PA1615 - Overhead travelling trolley PA1614 - Hydraulic power pack
Tensioning jack K500 PA1613 - Hydraulic TIRFOR TU-32H
chain pulley block1500 daN
tensioning jackK500
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1219
MC728
refrev nodatepage
productinformation
M-2611109412
access equipmentfor post tensioning of concrete
Application Presterssing work (Freyssinet system)on 3 liquid gas tanks
Site Zeebrugge portBelgiumCustomer Laboratoire Cineacutematique BruxellesEquipment ndash 6 special prestressing platforms each fitted
with 4 hydraulic TIRFOR TU-32H 1 four waypower p ack 4 safety devices BLOCSTOP BS3530 1 electric trolley for the manoeuvring ofthe tensioning jack 8 suspension and safetywire ropes 40 m long
ndash 6 suspension systems
Description of applicationProblemThe work consists in tensioning the prestressing wireropes on the inner part cutting the extra length of the ropes andinjecting a protective cement to prevent corrosion
Each part is fitted with 3 ribsInner part height 2230 m d iam 7580 mOuter part height 14 m d iam 8580 mSolution The contractor has used the same platforms as forthe Nuclear Plant in Thiange (se M-237) They had beenpreviously mended and modified for this new applicationThe platforms are suspended to special suspension systemThey move in tandem along the ribsThey have three functions ndash lifting personnel and material up to the working position ndash operating on the left and right of each rib for the placement
of the prestressing ropes and tensioning jacks ndash handling the tensioning jacks (weig ht 750 kg) by means of an
electric trolley which moves along a mobile beam
A metallic frame construction is needed to support the beamwhich is an integral part of the platform
PA19618
PA1967 PA19614
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1319
MC728
refrev nodatepage
productinformation
M-2611109422
access equipmentfor post tensioning of concrete
PA1969 PA1969
+ 2232
+ 1400
+ 800
000
ndash 700
120deg120deg
120deg
Nervure 2
Rib 2
Nervure 3Rib 3
1 0 0 0
1 0 0 04
0 0 0
R 4 1 9 0 0
R 36 900
Nervure 1Rib 1
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1419
MC957
refrev nodatepage
productinformation
M-4001109411
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on a gas reservoir
Site ENFERSA fac tory Cartagena SASpain
Contractor AGROMAN Empresa Constructora SAEquipment ndash 3 x 10 m prestressing platforms capacity 3000 kg eac h
fitted with 3 hydraulic TIRFOR TU-16H machines controlledfrom a power pack 3 BLOCSTOP safety devices and 6 x 40m wire ropes
ndash 9 stirrups susp ended from trollies to allow movement of theplatforms
ndash 3 hoists for manoeuvring the prestressing jacks
Description of applicationIt was necessary to prestress the concrete safety ring whichcircled the metal reservoir The 3 platforms allowed the work tocontinue simultaneously on the 3 seams for fitting and tensioningthe horizontal wire ropes For work on the ledge the platformshad to be slightly reversed using the trollies on the suspensionstirrups
Application reacutealiseacutee par TRACTEL IBERICA Espagne
PA3093 PA3091
PA309
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1519
MC730
refrev nodatepage
productinformation
M-2631109412
access equipmentfor post tensioning of concrete
PA1171 PA1172
PA1175
Application Post tensioning work (DYWIDAG system)on conc rete silos
Site Hassioud Cement Plant EgyptCustomer The Arab Contractor Osman Ahmed Osman
CairoEquipment ndash 2 special prestressing platforms
each equipped with4 hydraulic TIRFOR TU-32H1 four-way power pack4 BLOCSTOP safety devices2x4 safety and suspension wire ropes
ndash 4 suspension brackets
Description of applicationIn the present application the platforms have been designedfor prestressing work according to the conception of theGerman spec ialised Co DYWIDAGOnly one mobile beam is used for hand ling the tensioning jackgiving ac cess to the wire ropes either on the right or left rigThis suspension beam is moved manually along two rails andis telescopic so that accurate positioning of the jack ispossibleThe platforms are fixed to the suspension brackets which areanchored at the top of the silo
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1619
MC730
refrev nodatepage
productinformation
M-2631109422
access equipmentfor post tensioning of concrete
PA1177
drawing 810101B01
TIRFORTUndash32H
2805
3390
2390
1220
8000
2805
3390
B
B
16001200
2000
Coupe B ndash B
Blocstop
chain pulleyblock 500 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1719
MC495
Application Post tensioning of cement silos(Freyssinet system)
Site Suez Cement Comp any SuezEg yp tCustomer The Arab Contractors Osman Ahmed OsmanCairoEgypt
Equipment 4 special ALTA platforms length 8 m width 156m
each fitted with ndash 4 motorised TIRFOR TU-16H machines ndash 1 four-way power pack ndash 4 BLOCSTOP BS 20301 safety devices ndash 8 wire ropes C12 80 m long ndash 2 overhead trolleys
Description of applicationProblem The tensioning of the prestressing ropes of 5 silos (3
for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant The silos are 76 m highAfter the tensioning the extra lengths of the ropes have to b ecut and to p revent corrosion a protective cement is injectedSolution The use of 4 supporting p latforms equipp ed with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wallThese platforms have 2 func tionsa) lifting personel and material up to the working level where
they can op erate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolley
running on a I-beamA metallic frame construction is needed to support theI-beam which is an integral part of the platform
refrev nodatepage
productinformation
M-1461109411
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8 0 0 0
8 0 0
Oslash 1 7 0 0 0
mobile beam
TIRFORTUndash16H
BLOCSTOP
4 way hydraulic power pack
PA1018
flooring
chain hoist250 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1019
MC729
refrev nodatepage
productinformation
M-2621109434
access equipmentfor post tensioning of concrete
drawing 811008B03
4 7 0 0
TIRFORTUndash32H
ladder
working platform
4650 2000
11300
4650
hydraulic pack
access cradle
28900
28100
chain pulley block1500 daN
jackK500
first working level
second level access traps
second working level
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1119
MC729
refrev nodatepage
productinformation
M-2621109444
access equipmentfor post tensioning of concrete
PA1615 - Overhead travelling trolley PA1614 - Hydraulic power pack
Tensioning jack K500 PA1613 - Hydraulic TIRFOR TU-32H
chain pulley block1500 daN
tensioning jackK500
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1219
MC728
refrev nodatepage
productinformation
M-2611109412
access equipmentfor post tensioning of concrete
Application Presterssing work (Freyssinet system)on 3 liquid gas tanks
Site Zeebrugge portBelgiumCustomer Laboratoire Cineacutematique BruxellesEquipment ndash 6 special prestressing platforms each fitted
with 4 hydraulic TIRFOR TU-32H 1 four waypower p ack 4 safety devices BLOCSTOP BS3530 1 electric trolley for the manoeuvring ofthe tensioning jack 8 suspension and safetywire ropes 40 m long
ndash 6 suspension systems
Description of applicationProblemThe work consists in tensioning the prestressing wireropes on the inner part cutting the extra length of the ropes andinjecting a protective cement to prevent corrosion
Each part is fitted with 3 ribsInner part height 2230 m d iam 7580 mOuter part height 14 m d iam 8580 mSolution The contractor has used the same platforms as forthe Nuclear Plant in Thiange (se M-237) They had beenpreviously mended and modified for this new applicationThe platforms are suspended to special suspension systemThey move in tandem along the ribsThey have three functions ndash lifting personnel and material up to the working position ndash operating on the left and right of each rib for the placement
of the prestressing ropes and tensioning jacks ndash handling the tensioning jacks (weig ht 750 kg) by means of an
electric trolley which moves along a mobile beam
A metallic frame construction is needed to support the beamwhich is an integral part of the platform
PA19618
PA1967 PA19614
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1319
MC728
refrev nodatepage
productinformation
M-2611109422
access equipmentfor post tensioning of concrete
PA1969 PA1969
+ 2232
+ 1400
+ 800
000
ndash 700
120deg120deg
120deg
Nervure 2
Rib 2
Nervure 3Rib 3
1 0 0 0
1 0 0 04
0 0 0
R 4 1 9 0 0
R 36 900
Nervure 1Rib 1
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1419
MC957
refrev nodatepage
productinformation
M-4001109411
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on a gas reservoir
Site ENFERSA fac tory Cartagena SASpain
Contractor AGROMAN Empresa Constructora SAEquipment ndash 3 x 10 m prestressing platforms capacity 3000 kg eac h
fitted with 3 hydraulic TIRFOR TU-16H machines controlledfrom a power pack 3 BLOCSTOP safety devices and 6 x 40m wire ropes
ndash 9 stirrups susp ended from trollies to allow movement of theplatforms
ndash 3 hoists for manoeuvring the prestressing jacks
Description of applicationIt was necessary to prestress the concrete safety ring whichcircled the metal reservoir The 3 platforms allowed the work tocontinue simultaneously on the 3 seams for fitting and tensioningthe horizontal wire ropes For work on the ledge the platformshad to be slightly reversed using the trollies on the suspensionstirrups
Application reacutealiseacutee par TRACTEL IBERICA Espagne
PA3093 PA3091
PA309
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1519
MC730
refrev nodatepage
productinformation
M-2631109412
access equipmentfor post tensioning of concrete
PA1171 PA1172
PA1175
Application Post tensioning work (DYWIDAG system)on conc rete silos
Site Hassioud Cement Plant EgyptCustomer The Arab Contractor Osman Ahmed Osman
CairoEquipment ndash 2 special prestressing platforms
each equipped with4 hydraulic TIRFOR TU-32H1 four-way power pack4 BLOCSTOP safety devices2x4 safety and suspension wire ropes
ndash 4 suspension brackets
Description of applicationIn the present application the platforms have been designedfor prestressing work according to the conception of theGerman spec ialised Co DYWIDAGOnly one mobile beam is used for hand ling the tensioning jackgiving ac cess to the wire ropes either on the right or left rigThis suspension beam is moved manually along two rails andis telescopic so that accurate positioning of the jack ispossibleThe platforms are fixed to the suspension brackets which areanchored at the top of the silo
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1619
MC730
refrev nodatepage
productinformation
M-2631109422
access equipmentfor post tensioning of concrete
PA1177
drawing 810101B01
TIRFORTUndash32H
2805
3390
2390
1220
8000
2805
3390
B
B
16001200
2000
Coupe B ndash B
Blocstop
chain pulleyblock 500 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1719
MC495
Application Post tensioning of cement silos(Freyssinet system)
Site Suez Cement Comp any SuezEg yp tCustomer The Arab Contractors Osman Ahmed OsmanCairoEgypt
Equipment 4 special ALTA platforms length 8 m width 156m
each fitted with ndash 4 motorised TIRFOR TU-16H machines ndash 1 four-way power pack ndash 4 BLOCSTOP BS 20301 safety devices ndash 8 wire ropes C12 80 m long ndash 2 overhead trolleys
Description of applicationProblem The tensioning of the prestressing ropes of 5 silos (3
for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant The silos are 76 m highAfter the tensioning the extra lengths of the ropes have to b ecut and to p revent corrosion a protective cement is injectedSolution The use of 4 supporting p latforms equipp ed with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wallThese platforms have 2 func tionsa) lifting personel and material up to the working level where
they can op erate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolley
running on a I-beamA metallic frame construction is needed to support theI-beam which is an integral part of the platform
refrev nodatepage
productinformation
M-1461109411
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8 0 0 0
8 0 0
Oslash 1 7 0 0 0
mobile beam
TIRFORTUndash16H
BLOCSTOP
4 way hydraulic power pack
PA1018
flooring
chain hoist250 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1119
MC729
refrev nodatepage
productinformation
M-2621109444
access equipmentfor post tensioning of concrete
PA1615 - Overhead travelling trolley PA1614 - Hydraulic power pack
Tensioning jack K500 PA1613 - Hydraulic TIRFOR TU-32H
chain pulley block1500 daN
tensioning jackK500
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1219
MC728
refrev nodatepage
productinformation
M-2611109412
access equipmentfor post tensioning of concrete
Application Presterssing work (Freyssinet system)on 3 liquid gas tanks
Site Zeebrugge portBelgiumCustomer Laboratoire Cineacutematique BruxellesEquipment ndash 6 special prestressing platforms each fitted
with 4 hydraulic TIRFOR TU-32H 1 four waypower p ack 4 safety devices BLOCSTOP BS3530 1 electric trolley for the manoeuvring ofthe tensioning jack 8 suspension and safetywire ropes 40 m long
ndash 6 suspension systems
Description of applicationProblemThe work consists in tensioning the prestressing wireropes on the inner part cutting the extra length of the ropes andinjecting a protective cement to prevent corrosion
Each part is fitted with 3 ribsInner part height 2230 m d iam 7580 mOuter part height 14 m d iam 8580 mSolution The contractor has used the same platforms as forthe Nuclear Plant in Thiange (se M-237) They had beenpreviously mended and modified for this new applicationThe platforms are suspended to special suspension systemThey move in tandem along the ribsThey have three functions ndash lifting personnel and material up to the working position ndash operating on the left and right of each rib for the placement
of the prestressing ropes and tensioning jacks ndash handling the tensioning jacks (weig ht 750 kg) by means of an
electric trolley which moves along a mobile beam
A metallic frame construction is needed to support the beamwhich is an integral part of the platform
PA19618
PA1967 PA19614
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1319
MC728
refrev nodatepage
productinformation
M-2611109422
access equipmentfor post tensioning of concrete
PA1969 PA1969
+ 2232
+ 1400
+ 800
000
ndash 700
120deg120deg
120deg
Nervure 2
Rib 2
Nervure 3Rib 3
1 0 0 0
1 0 0 04
0 0 0
R 4 1 9 0 0
R 36 900
Nervure 1Rib 1
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1419
MC957
refrev nodatepage
productinformation
M-4001109411
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on a gas reservoir
Site ENFERSA fac tory Cartagena SASpain
Contractor AGROMAN Empresa Constructora SAEquipment ndash 3 x 10 m prestressing platforms capacity 3000 kg eac h
fitted with 3 hydraulic TIRFOR TU-16H machines controlledfrom a power pack 3 BLOCSTOP safety devices and 6 x 40m wire ropes
ndash 9 stirrups susp ended from trollies to allow movement of theplatforms
ndash 3 hoists for manoeuvring the prestressing jacks
Description of applicationIt was necessary to prestress the concrete safety ring whichcircled the metal reservoir The 3 platforms allowed the work tocontinue simultaneously on the 3 seams for fitting and tensioningthe horizontal wire ropes For work on the ledge the platformshad to be slightly reversed using the trollies on the suspensionstirrups
Application reacutealiseacutee par TRACTEL IBERICA Espagne
PA3093 PA3091
PA309
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1519
MC730
refrev nodatepage
productinformation
M-2631109412
access equipmentfor post tensioning of concrete
PA1171 PA1172
PA1175
Application Post tensioning work (DYWIDAG system)on conc rete silos
Site Hassioud Cement Plant EgyptCustomer The Arab Contractor Osman Ahmed Osman
CairoEquipment ndash 2 special prestressing platforms
each equipped with4 hydraulic TIRFOR TU-32H1 four-way power pack4 BLOCSTOP safety devices2x4 safety and suspension wire ropes
ndash 4 suspension brackets
Description of applicationIn the present application the platforms have been designedfor prestressing work according to the conception of theGerman spec ialised Co DYWIDAGOnly one mobile beam is used for hand ling the tensioning jackgiving ac cess to the wire ropes either on the right or left rigThis suspension beam is moved manually along two rails andis telescopic so that accurate positioning of the jack ispossibleThe platforms are fixed to the suspension brackets which areanchored at the top of the silo
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1619
MC730
refrev nodatepage
productinformation
M-2631109422
access equipmentfor post tensioning of concrete
PA1177
drawing 810101B01
TIRFORTUndash32H
2805
3390
2390
1220
8000
2805
3390
B
B
16001200
2000
Coupe B ndash B
Blocstop
chain pulleyblock 500 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1719
MC495
Application Post tensioning of cement silos(Freyssinet system)
Site Suez Cement Comp any SuezEg yp tCustomer The Arab Contractors Osman Ahmed OsmanCairoEgypt
Equipment 4 special ALTA platforms length 8 m width 156m
each fitted with ndash 4 motorised TIRFOR TU-16H machines ndash 1 four-way power pack ndash 4 BLOCSTOP BS 20301 safety devices ndash 8 wire ropes C12 80 m long ndash 2 overhead trolleys
Description of applicationProblem The tensioning of the prestressing ropes of 5 silos (3
for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant The silos are 76 m highAfter the tensioning the extra lengths of the ropes have to b ecut and to p revent corrosion a protective cement is injectedSolution The use of 4 supporting p latforms equipp ed with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wallThese platforms have 2 func tionsa) lifting personel and material up to the working level where
they can op erate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolley
running on a I-beamA metallic frame construction is needed to support theI-beam which is an integral part of the platform
refrev nodatepage
productinformation
M-1461109411
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8 0 0 0
8 0 0
Oslash 1 7 0 0 0
mobile beam
TIRFORTUndash16H
BLOCSTOP
4 way hydraulic power pack
PA1018
flooring
chain hoist250 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1219
MC728
refrev nodatepage
productinformation
M-2611109412
access equipmentfor post tensioning of concrete
Application Presterssing work (Freyssinet system)on 3 liquid gas tanks
Site Zeebrugge portBelgiumCustomer Laboratoire Cineacutematique BruxellesEquipment ndash 6 special prestressing platforms each fitted
with 4 hydraulic TIRFOR TU-32H 1 four waypower p ack 4 safety devices BLOCSTOP BS3530 1 electric trolley for the manoeuvring ofthe tensioning jack 8 suspension and safetywire ropes 40 m long
ndash 6 suspension systems
Description of applicationProblemThe work consists in tensioning the prestressing wireropes on the inner part cutting the extra length of the ropes andinjecting a protective cement to prevent corrosion
Each part is fitted with 3 ribsInner part height 2230 m d iam 7580 mOuter part height 14 m d iam 8580 mSolution The contractor has used the same platforms as forthe Nuclear Plant in Thiange (se M-237) They had beenpreviously mended and modified for this new applicationThe platforms are suspended to special suspension systemThey move in tandem along the ribsThey have three functions ndash lifting personnel and material up to the working position ndash operating on the left and right of each rib for the placement
of the prestressing ropes and tensioning jacks ndash handling the tensioning jacks (weig ht 750 kg) by means of an
electric trolley which moves along a mobile beam
A metallic frame construction is needed to support the beamwhich is an integral part of the platform
PA19618
PA1967 PA19614
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1319
MC728
refrev nodatepage
productinformation
M-2611109422
access equipmentfor post tensioning of concrete
PA1969 PA1969
+ 2232
+ 1400
+ 800
000
ndash 700
120deg120deg
120deg
Nervure 2
Rib 2
Nervure 3Rib 3
1 0 0 0
1 0 0 04
0 0 0
R 4 1 9 0 0
R 36 900
Nervure 1Rib 1
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1419
MC957
refrev nodatepage
productinformation
M-4001109411
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on a gas reservoir
Site ENFERSA fac tory Cartagena SASpain
Contractor AGROMAN Empresa Constructora SAEquipment ndash 3 x 10 m prestressing platforms capacity 3000 kg eac h
fitted with 3 hydraulic TIRFOR TU-16H machines controlledfrom a power pack 3 BLOCSTOP safety devices and 6 x 40m wire ropes
ndash 9 stirrups susp ended from trollies to allow movement of theplatforms
ndash 3 hoists for manoeuvring the prestressing jacks
Description of applicationIt was necessary to prestress the concrete safety ring whichcircled the metal reservoir The 3 platforms allowed the work tocontinue simultaneously on the 3 seams for fitting and tensioningthe horizontal wire ropes For work on the ledge the platformshad to be slightly reversed using the trollies on the suspensionstirrups
Application reacutealiseacutee par TRACTEL IBERICA Espagne
PA3093 PA3091
PA309
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1519
MC730
refrev nodatepage
productinformation
M-2631109412
access equipmentfor post tensioning of concrete
PA1171 PA1172
PA1175
Application Post tensioning work (DYWIDAG system)on conc rete silos
Site Hassioud Cement Plant EgyptCustomer The Arab Contractor Osman Ahmed Osman
CairoEquipment ndash 2 special prestressing platforms
each equipped with4 hydraulic TIRFOR TU-32H1 four-way power pack4 BLOCSTOP safety devices2x4 safety and suspension wire ropes
ndash 4 suspension brackets
Description of applicationIn the present application the platforms have been designedfor prestressing work according to the conception of theGerman spec ialised Co DYWIDAGOnly one mobile beam is used for hand ling the tensioning jackgiving ac cess to the wire ropes either on the right or left rigThis suspension beam is moved manually along two rails andis telescopic so that accurate positioning of the jack ispossibleThe platforms are fixed to the suspension brackets which areanchored at the top of the silo
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1619
MC730
refrev nodatepage
productinformation
M-2631109422
access equipmentfor post tensioning of concrete
PA1177
drawing 810101B01
TIRFORTUndash32H
2805
3390
2390
1220
8000
2805
3390
B
B
16001200
2000
Coupe B ndash B
Blocstop
chain pulleyblock 500 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1719
MC495
Application Post tensioning of cement silos(Freyssinet system)
Site Suez Cement Comp any SuezEg yp tCustomer The Arab Contractors Osman Ahmed OsmanCairoEgypt
Equipment 4 special ALTA platforms length 8 m width 156m
each fitted with ndash 4 motorised TIRFOR TU-16H machines ndash 1 four-way power pack ndash 4 BLOCSTOP BS 20301 safety devices ndash 8 wire ropes C12 80 m long ndash 2 overhead trolleys
Description of applicationProblem The tensioning of the prestressing ropes of 5 silos (3
for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant The silos are 76 m highAfter the tensioning the extra lengths of the ropes have to b ecut and to p revent corrosion a protective cement is injectedSolution The use of 4 supporting p latforms equipp ed with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wallThese platforms have 2 func tionsa) lifting personel and material up to the working level where
they can op erate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolley
running on a I-beamA metallic frame construction is needed to support theI-beam which is an integral part of the platform
refrev nodatepage
productinformation
M-1461109411
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8 0 0 0
8 0 0
Oslash 1 7 0 0 0
mobile beam
TIRFORTUndash16H
BLOCSTOP
4 way hydraulic power pack
PA1018
flooring
chain hoist250 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1319
MC728
refrev nodatepage
productinformation
M-2611109422
access equipmentfor post tensioning of concrete
PA1969 PA1969
+ 2232
+ 1400
+ 800
000
ndash 700
120deg120deg
120deg
Nervure 2
Rib 2
Nervure 3Rib 3
1 0 0 0
1 0 0 04
0 0 0
R 4 1 9 0 0
R 36 900
Nervure 1Rib 1
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1419
MC957
refrev nodatepage
productinformation
M-4001109411
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on a gas reservoir
Site ENFERSA fac tory Cartagena SASpain
Contractor AGROMAN Empresa Constructora SAEquipment ndash 3 x 10 m prestressing platforms capacity 3000 kg eac h
fitted with 3 hydraulic TIRFOR TU-16H machines controlledfrom a power pack 3 BLOCSTOP safety devices and 6 x 40m wire ropes
ndash 9 stirrups susp ended from trollies to allow movement of theplatforms
ndash 3 hoists for manoeuvring the prestressing jacks
Description of applicationIt was necessary to prestress the concrete safety ring whichcircled the metal reservoir The 3 platforms allowed the work tocontinue simultaneously on the 3 seams for fitting and tensioningthe horizontal wire ropes For work on the ledge the platformshad to be slightly reversed using the trollies on the suspensionstirrups
Application reacutealiseacutee par TRACTEL IBERICA Espagne
PA3093 PA3091
PA309
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1519
MC730
refrev nodatepage
productinformation
M-2631109412
access equipmentfor post tensioning of concrete
PA1171 PA1172
PA1175
Application Post tensioning work (DYWIDAG system)on conc rete silos
Site Hassioud Cement Plant EgyptCustomer The Arab Contractor Osman Ahmed Osman
CairoEquipment ndash 2 special prestressing platforms
each equipped with4 hydraulic TIRFOR TU-32H1 four-way power pack4 BLOCSTOP safety devices2x4 safety and suspension wire ropes
ndash 4 suspension brackets
Description of applicationIn the present application the platforms have been designedfor prestressing work according to the conception of theGerman spec ialised Co DYWIDAGOnly one mobile beam is used for hand ling the tensioning jackgiving ac cess to the wire ropes either on the right or left rigThis suspension beam is moved manually along two rails andis telescopic so that accurate positioning of the jack ispossibleThe platforms are fixed to the suspension brackets which areanchored at the top of the silo
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1619
MC730
refrev nodatepage
productinformation
M-2631109422
access equipmentfor post tensioning of concrete
PA1177
drawing 810101B01
TIRFORTUndash32H
2805
3390
2390
1220
8000
2805
3390
B
B
16001200
2000
Coupe B ndash B
Blocstop
chain pulleyblock 500 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1719
MC495
Application Post tensioning of cement silos(Freyssinet system)
Site Suez Cement Comp any SuezEg yp tCustomer The Arab Contractors Osman Ahmed OsmanCairoEgypt
Equipment 4 special ALTA platforms length 8 m width 156m
each fitted with ndash 4 motorised TIRFOR TU-16H machines ndash 1 four-way power pack ndash 4 BLOCSTOP BS 20301 safety devices ndash 8 wire ropes C12 80 m long ndash 2 overhead trolleys
Description of applicationProblem The tensioning of the prestressing ropes of 5 silos (3
for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant The silos are 76 m highAfter the tensioning the extra lengths of the ropes have to b ecut and to p revent corrosion a protective cement is injectedSolution The use of 4 supporting p latforms equipp ed with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wallThese platforms have 2 func tionsa) lifting personel and material up to the working level where
they can op erate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolley
running on a I-beamA metallic frame construction is needed to support theI-beam which is an integral part of the platform
refrev nodatepage
productinformation
M-1461109411
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8 0 0 0
8 0 0
Oslash 1 7 0 0 0
mobile beam
TIRFORTUndash16H
BLOCSTOP
4 way hydraulic power pack
PA1018
flooring
chain hoist250 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1419
MC957
refrev nodatepage
productinformation
M-4001109411
access equipmentfor post tensioning of concrete
Application Prestressing work (Freyssinet system)on a gas reservoir
Site ENFERSA fac tory Cartagena SASpain
Contractor AGROMAN Empresa Constructora SAEquipment ndash 3 x 10 m prestressing platforms capacity 3000 kg eac h
fitted with 3 hydraulic TIRFOR TU-16H machines controlledfrom a power pack 3 BLOCSTOP safety devices and 6 x 40m wire ropes
ndash 9 stirrups susp ended from trollies to allow movement of theplatforms
ndash 3 hoists for manoeuvring the prestressing jacks
Description of applicationIt was necessary to prestress the concrete safety ring whichcircled the metal reservoir The 3 platforms allowed the work tocontinue simultaneously on the 3 seams for fitting and tensioningthe horizontal wire ropes For work on the ledge the platformshad to be slightly reversed using the trollies on the suspensionstirrups
Application reacutealiseacutee par TRACTEL IBERICA Espagne
PA3093 PA3091
PA309
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1519
MC730
refrev nodatepage
productinformation
M-2631109412
access equipmentfor post tensioning of concrete
PA1171 PA1172
PA1175
Application Post tensioning work (DYWIDAG system)on conc rete silos
Site Hassioud Cement Plant EgyptCustomer The Arab Contractor Osman Ahmed Osman
CairoEquipment ndash 2 special prestressing platforms
each equipped with4 hydraulic TIRFOR TU-32H1 four-way power pack4 BLOCSTOP safety devices2x4 safety and suspension wire ropes
ndash 4 suspension brackets
Description of applicationIn the present application the platforms have been designedfor prestressing work according to the conception of theGerman spec ialised Co DYWIDAGOnly one mobile beam is used for hand ling the tensioning jackgiving ac cess to the wire ropes either on the right or left rigThis suspension beam is moved manually along two rails andis telescopic so that accurate positioning of the jack ispossibleThe platforms are fixed to the suspension brackets which areanchored at the top of the silo
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1619
MC730
refrev nodatepage
productinformation
M-2631109422
access equipmentfor post tensioning of concrete
PA1177
drawing 810101B01
TIRFORTUndash32H
2805
3390
2390
1220
8000
2805
3390
B
B
16001200
2000
Coupe B ndash B
Blocstop
chain pulleyblock 500 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1719
MC495
Application Post tensioning of cement silos(Freyssinet system)
Site Suez Cement Comp any SuezEg yp tCustomer The Arab Contractors Osman Ahmed OsmanCairoEgypt
Equipment 4 special ALTA platforms length 8 m width 156m
each fitted with ndash 4 motorised TIRFOR TU-16H machines ndash 1 four-way power pack ndash 4 BLOCSTOP BS 20301 safety devices ndash 8 wire ropes C12 80 m long ndash 2 overhead trolleys
Description of applicationProblem The tensioning of the prestressing ropes of 5 silos (3
for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant The silos are 76 m highAfter the tensioning the extra lengths of the ropes have to b ecut and to p revent corrosion a protective cement is injectedSolution The use of 4 supporting p latforms equipp ed with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wallThese platforms have 2 func tionsa) lifting personel and material up to the working level where
they can op erate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolley
running on a I-beamA metallic frame construction is needed to support theI-beam which is an integral part of the platform
refrev nodatepage
productinformation
M-1461109411
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8 0 0 0
8 0 0
Oslash 1 7 0 0 0
mobile beam
TIRFORTUndash16H
BLOCSTOP
4 way hydraulic power pack
PA1018
flooring
chain hoist250 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1519
MC730
refrev nodatepage
productinformation
M-2631109412
access equipmentfor post tensioning of concrete
PA1171 PA1172
PA1175
Application Post tensioning work (DYWIDAG system)on conc rete silos
Site Hassioud Cement Plant EgyptCustomer The Arab Contractor Osman Ahmed Osman
CairoEquipment ndash 2 special prestressing platforms
each equipped with4 hydraulic TIRFOR TU-32H1 four-way power pack4 BLOCSTOP safety devices2x4 safety and suspension wire ropes
ndash 4 suspension brackets
Description of applicationIn the present application the platforms have been designedfor prestressing work according to the conception of theGerman spec ialised Co DYWIDAGOnly one mobile beam is used for hand ling the tensioning jackgiving ac cess to the wire ropes either on the right or left rigThis suspension beam is moved manually along two rails andis telescopic so that accurate positioning of the jack ispossibleThe platforms are fixed to the suspension brackets which areanchored at the top of the silo
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1619
MC730
refrev nodatepage
productinformation
M-2631109422
access equipmentfor post tensioning of concrete
PA1177
drawing 810101B01
TIRFORTUndash32H
2805
3390
2390
1220
8000
2805
3390
B
B
16001200
2000
Coupe B ndash B
Blocstop
chain pulleyblock 500 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1719
MC495
Application Post tensioning of cement silos(Freyssinet system)
Site Suez Cement Comp any SuezEg yp tCustomer The Arab Contractors Osman Ahmed OsmanCairoEgypt
Equipment 4 special ALTA platforms length 8 m width 156m
each fitted with ndash 4 motorised TIRFOR TU-16H machines ndash 1 four-way power pack ndash 4 BLOCSTOP BS 20301 safety devices ndash 8 wire ropes C12 80 m long ndash 2 overhead trolleys
Description of applicationProblem The tensioning of the prestressing ropes of 5 silos (3
for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant The silos are 76 m highAfter the tensioning the extra lengths of the ropes have to b ecut and to p revent corrosion a protective cement is injectedSolution The use of 4 supporting p latforms equipp ed with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wallThese platforms have 2 func tionsa) lifting personel and material up to the working level where
they can op erate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolley
running on a I-beamA metallic frame construction is needed to support theI-beam which is an integral part of the platform
refrev nodatepage
productinformation
M-1461109411
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8 0 0 0
8 0 0
Oslash 1 7 0 0 0
mobile beam
TIRFORTUndash16H
BLOCSTOP
4 way hydraulic power pack
PA1018
flooring
chain hoist250 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1619
MC730
refrev nodatepage
productinformation
M-2631109422
access equipmentfor post tensioning of concrete
PA1177
drawing 810101B01
TIRFORTUndash32H
2805
3390
2390
1220
8000
2805
3390
B
B
16001200
2000
Coupe B ndash B
Blocstop
chain pulleyblock 500 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1719
MC495
Application Post tensioning of cement silos(Freyssinet system)
Site Suez Cement Comp any SuezEg yp tCustomer The Arab Contractors Osman Ahmed OsmanCairoEgypt
Equipment 4 special ALTA platforms length 8 m width 156m
each fitted with ndash 4 motorised TIRFOR TU-16H machines ndash 1 four-way power pack ndash 4 BLOCSTOP BS 20301 safety devices ndash 8 wire ropes C12 80 m long ndash 2 overhead trolleys
Description of applicationProblem The tensioning of the prestressing ropes of 5 silos (3
for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant The silos are 76 m highAfter the tensioning the extra lengths of the ropes have to b ecut and to p revent corrosion a protective cement is injectedSolution The use of 4 supporting p latforms equipp ed with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wallThese platforms have 2 func tionsa) lifting personel and material up to the working level where
they can op erate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolley
running on a I-beamA metallic frame construction is needed to support theI-beam which is an integral part of the platform
refrev nodatepage
productinformation
M-1461109411
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8 0 0 0
8 0 0
Oslash 1 7 0 0 0
mobile beam
TIRFORTUndash16H
BLOCSTOP
4 way hydraulic power pack
PA1018
flooring
chain hoist250 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1719
MC495
Application Post tensioning of cement silos(Freyssinet system)
Site Suez Cement Comp any SuezEg yp tCustomer The Arab Contractors Osman Ahmed OsmanCairoEgypt
Equipment 4 special ALTA platforms length 8 m width 156m
each fitted with ndash 4 motorised TIRFOR TU-16H machines ndash 1 four-way power pack ndash 4 BLOCSTOP BS 20301 safety devices ndash 8 wire ropes C12 80 m long ndash 2 overhead trolleys
Description of applicationProblem The tensioning of the prestressing ropes of 5 silos (3
for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant The silos are 76 m highAfter the tensioning the extra lengths of the ropes have to b ecut and to p revent corrosion a protective cement is injectedSolution The use of 4 supporting p latforms equipp ed with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wallThese platforms have 2 func tionsa) lifting personel and material up to the working level where
they can op erate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolley
running on a I-beamA metallic frame construction is needed to support theI-beam which is an integral part of the platform
refrev nodatepage
productinformation
M-1461109411
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8 0 0 0
8 0 0
Oslash 1 7 0 0 0
mobile beam
TIRFORTUndash16H
BLOCSTOP
4 way hydraulic power pack
PA1018
flooring
chain hoist250 kg
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1819
MC709
refrev nodatepage
productinformation
M-2371109412
access equipmentfor post tensioning of concrete
PA10714
PA10721 PA10718
Application Pestressing work (Freyssinet conception)
at a power stationSite Tihang e p ower stationBelg iumCustomer Laboratoire de Cineacutematique BrusselsEquipment 6 special prestressing p latforms
dim 5x2 m each equipped with ndash 4 hydraulic TIRFOR TU-32H ndash 1 four-way power pack ndash 4 BLOCSTOP safety devices ndash 1 elec tr ic pul ley b lock fo r hand lin g the
tensioning jack
Description of application
ProblemThe work consists of tensioning the prestressing wire ropes onthe inner part cutting the extra length of the ropes and injectinga protective cement to prevent corrosion
SolutionThe platforms move two by two along the ribs They have threefunctions ndash lifting personnel and materials up to the working level ndash working on the left and on the right of eac h rib for the
positionning of the prestressing ropes and tensioning jacks ndash handling of the tensioning jac ks (weig ht 1600 kg) by means
of an electric pulley block which moves along a mob ile beam(PA10718) A metallic frame construction is needed to
support the beam It is an integral part of the platformThe platforms come in from the top by means of a crane(PA1071619)
7292019 prestgbr_application refpdf
httpslidepdfcomreaderfullprestgbrapplication-refpdf 1919
MC709
refrev nodatepage
productinformation
M-2371109422
access equipmentfor post tensioning of concrete
PA10719
PA10716