Load shedding in PakistanReasons & Remedies
February 9, 2009
By
Muhammad Ziauddin
7/30/2019 Presentation to IEE
http://slidepdf.com/reader/full/presentation-to-iee 2/17
Organization
Historical Background
Load duration curve
Capacity, capability & availability
ShortageReasonsRemedies / Suggestions
7/30/2019 Presentation to IEE
http://slidepdf.com/reader/full/presentation-to-iee 3/17
Historical Background
Pre 1994 eraSever load shedding
Post 1994 era
Surplus power in the system2002 Power Policy
Lengthy procedure– Approval of feasibility
– Tariff negotiation & approval
– Security packages
High load growth
7/30/2019 Presentation to IEE
http://slidepdf.com/reader/full/presentation-to-iee 4/17
Current Situation
Supply / Demand Balance
Load duration curve
Capacity, Capability and Availability
Demand
Supply
7/30/2019 Presentation to IEE
http://slidepdf.com/reader/full/presentation-to-iee 5/17
Power Supply/DemandBalance
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
50,000
55,000
60,000
65,000
70,000
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Year
D e m a n
d / S u p p
l y ( M W )
Demand
Supply
7/30/2019 Presentation to IEE
http://slidepdf.com/reader/full/presentation-to-iee 6/17
Load Duration Curve18th August 2007
9,000
10,000
11,000
12,000
13,000
14,000
15,000
16,000
17,000
010002000300040005000600070008000900100011001200130014001500160017001800190020002100220023002400
Time in hrs
L o a d
i n M
Com p ut ed Sys te m De m and Act ual L oad Supplie d Act ual Availab ilit y
7/30/2019 Presentation to IEE
http://slidepdf.com/reader/full/presentation-to-iee 7/17
Load Duration Curve21st August 2008
9,000
10,000
11,000
12,000
13,000
14,000
15,000
16,000
17,000
18,000
0100 0200 0300 0400 0500 0600 0700 0800 0900 1000 1100 12001300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2400
Time in hrs
L o a d i n M
Computed System Demand Actual Load supplied Acutal Availability
7/30/2019 Presentation to IEE
http://slidepdf.com/reader/full/presentation-to-iee 8/17
Load Duration Curve10th January 2007
5,000
6,000
7,000
8,000
9,000
10,000
11,000
12,000
13,000
010002000300040005000600070008000900100011001200130014001500160017001800190020002100220023002400
Time in hrs
L o a d
i n M
Computed System Demand Actual Load Supplied Actual Availability
7/30/2019 Presentation to IEE
http://slidepdf.com/reader/full/presentation-to-iee 9/17
Load Duration Curve23rd January 2008
5,000
6,000
7,000
8,000
9,000
10,000
11,000
12,000
13,000
010002000300040005000600070008000900100011001200130014001500160017001800190020002100220023002400
Time in hrs
L o a d
i n M
Com put ed Sys te m De m and Actual L oad s upp lie d Acut al Availabilit y
7/30/2019 Presentation to IEE
http://slidepdf.com/reader/full/presentation-to-iee 10/17
Reasons
Late finalization of 2002 power policy
Late initiation of new projects
Long processing time
Not soliciting new power plants
Reliance of unsolicited proposal
WAPDA was not allowed to install thermal
power plantsPrivate sector started taking advantages
Availability of machines in the internationalmarket
7/30/2019 Presentation to IEE
http://slidepdf.com/reader/full/presentation-to-iee 11/17
Reasons(contd)
No serious efforts on effeciency improvementand energy conservation
Time of day metering system is not up to its
strengthHydropower not comming up
Small hydro power plants are not being takenup by WAPDA
Closure of some IPP & WAPDA‘s power plants
Not payment of fuel bills to fuel suppliers
7/30/2019 Presentation to IEE
http://slidepdf.com/reader/full/presentation-to-iee 12/17
Reasons(contd)
International investors are not comming withenthusiasm
International recession
Governace issueNo serious efforts to exploit alternative energyresources
Huge reserve of coal is not being used
7/30/2019 Presentation to IEE
http://slidepdf.com/reader/full/presentation-to-iee 13/17
Issues
Most of the new thermal power plants arebased on fuel oil
Cost of electricity generations
Fuel imports – major implecations on forxreseve
Volatility of crude oil prices
Fuel transporation and import infrastructure
Road / railway network
Port facilities
7/30/2019 Presentation to IEE
http://slidepdf.com/reader/full/presentation-to-iee 14/17
Issues(contd)
Gas is not available for new power plants
Un efficient energy useage
No incentive from the government to develop
alternative energy resourcesRental power plant is sucidal
7/30/2019 Presentation to IEE
http://slidepdf.com/reader/full/presentation-to-iee 15/17
Remedies / Suggestions
Development of alternative energy
The Regulator should be linient in tariff for wind andsolar power plants
Manufacturing facility for wind and solar power plantsbe encouraged by the government
Coal should be used for power generation includingimported Coal
Thermal power plants should be installed by WAPDA inparllel to IPPs
More emphasis should be on energy conservation andefficiency improvement
7/30/2019 Presentation to IEE
http://slidepdf.com/reader/full/presentation-to-iee 16/17
Remedies / Suggestions(contd)
Time of day tariff should be implemented in allcatagories of consumers
A digonostic study should be conducted for oil
transporatation infrastructure and portfacilities
Captive power plant should brougt on bar
Industrial sector should be encouraged toinstall their own power plants and surplusshould be purchased by WAPDA at acompetitive price