pre-proposal conference presentation

Post on 16-Apr-2017

528 Views

Category:

Business

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

NC 50 Corridor NC 50 Corridor StudyStudy

Pre-Proposal Pre-Proposal ConferenceConferenceOctober 14, 2009October 14, 2009

Capital Area MPO Capital Area MPO Conference RoomConference Room

NC 50 Corridor StudyNC 50 Corridor StudyPre-Proposal ConferencePre-Proposal Conference

Today’s TopicsToday’s Topics Study AreaStudy Area Purpose of StudyPurpose of Study Study ConsiderationsStudy Considerations RFP HighlightsRFP Highlights ARRA ReportingARRA Reporting Proposal Review ProceduresProposal Review Procedures ScheduleSchedule Q&AQ&A

NC 50 Corridor StudyNC 50 Corridor Study

Study Area

NC 50 Corridor StudyNC 50 Corridor Study Purpose of StudyPurpose of Study

Mobility Issues / Traffic GrowthMobility Issues / Traffic Growth Access ControlAccess Control Developments Along NC 50Developments Along NC 50 Growing Commuter PopulationGrowing Commuter Population

NC 50 Corridor StudyNC 50 Corridor Study Study ConsiderationsStudy Considerations

Land UseLand Use Residential, low-densityResidential, low-density Commercial, Creedmoor CBDCommercial, Creedmoor CBD

Environmental Environmental Air QualityAir Quality Water QualityWater Quality

NC 50 Corridor StudyNC 50 Corridor Study RFP HighlightsRFP Highlights

Study Oversight TeamStudy Oversight Team Existing Conditions InventoryExisting Conditions Inventory Initial Public WorkshopsInitial Public Workshops Website DevelopmentWebsite Development Performance Standards & Performance Standards &

ImplementationImplementation Public Input WorkshopsPublic Input Workshops Comprehensive Plan ReportComprehensive Plan Report Local Presentations/AdoptionsLocal Presentations/Adoptions

NC 50 Corridor StudyNC 50 Corridor Study RFP Highlights, Cont’dRFP Highlights, Cont’d

Desired End-Product (p. 46)Desired End-Product (p. 46) Projected Transportation Deficiencies for All ModesProjected Transportation Deficiencies for All Modes

Feasible Recommendations to Correct Deficiencies for All Feasible Recommendations to Correct Deficiencies for All ModesModes

Access Management Plan Related to Potential DevelopmentAccess Management Plan Related to Potential Development

Functional Roadway System Plan Addressing ITS, Access, Functional Roadway System Plan Addressing ITS, Access, Intersection Treatments, and Auxiliary LanesIntersection Treatments, and Auxiliary Lanes

Corridor Improvement PrioritiesCorridor Improvement Priorities

Land Use/Policy Recommendations for Plan ImplementationLand Use/Policy Recommendations for Plan Implementation

NC 50 Corridor StudyNC 50 Corridor Study ARRA RequirementsARRA Requirements

Federal Requirements – Section 2.24 of Federal Requirements – Section 2.24 of RFPRFP Job Posting with ESCJob Posting with ESC US Comptroller General may access all US Comptroller General may access all

documentsdocuments Monthly Reports RequiredMonthly Reports Required

EmploymentEmployment Project StatusProject Status Compiled & Submitted ALSO with quarterly Compiled & Submitted ALSO with quarterly

invoicesinvoices

NC 50 Corridor StudyNC 50 Corridor Study Proposal ReviewsProposal Reviews

Review TeamReview Team

Evaluation CriteriaEvaluation Criteria Understanding of Scope of Work (30%)Understanding of Scope of Work (30%) Experience and qualifications of project Experience and qualifications of project

team (20%)team (20%) Availability of project team (20%)Availability of project team (20%) Client Satisfaction (20%)Client Satisfaction (20%) Innovation (10%)Innovation (10%)

NC 50 Corridor StudyNC 50 Corridor Study ScheduleSchedule

Proposals Due: Proposals Due: October 30, 2009October 30, 2009 at at 5:00 p.m5:00 p.m. at CAMPO Office. at CAMPO Office

Proposal Opening: Nov. 2, 2009 at 9:30 Proposal Opening: Nov. 2, 2009 at 9:30 a.m. at CAMPO Officea.m. at CAMPO Office

Interviews: Top ~5 Proposal Teams, Interviews: Top ~5 Proposal Teams, November 13, 2009 at CAMPO Office November 13, 2009 at CAMPO Office (times TBD)(times TBD)

Proposal Selection: ~November 23, 2009Proposal Selection: ~November 23, 2009

NC 50 Corridor StudyNC 50 Corridor Study Questions & AnswersQuestions & Answers

Q&A Document attached with RFPQ&A Document attached with RFP Other Questions?Other Questions?

NC 50 Corridor StudyNC 50 Corridor Study Contact Information:Contact Information:

Shelby PowellShelby PowellNC Capital Area MPONC Capital Area MPO

127 W. Hargett Street, Suite 800127 W. Hargett Street, Suite 800Raleigh, NC 27601Raleigh, NC 27601

919/996-4393919/996-4393

Shelby.Powell@ci.raleigh.nc.us Shelby.Powell@ci.raleigh.nc.us

Website:Website:http://www.campo-nc.us/projects.htmlhttp://www.campo-nc.us/projects.html

top related