Martijn Hesp16 nov 2016
Planning & Forecasting at VDL Nedcar
Agenda VDL information Background Budget Tool Tool Selection Implementation Project impact Realization
1 mei 2023 Presentation VDL Nedcar2
1. Subcontracting Metal working Mechatronic systems and system supply Plastics processing Surface treatment
3
Coaches Public transport buses High-quality Public Transport Systems Mini & midi buses Chassis modules Second-hand buses Parts & services
2. Buses & coaches
Suspension systems Production automation systems Systems for the agricultural sector Cigar-making and packaging machines Systems for the industrial sector Heat exchangers Sunbeds and roof boxes Container handling systems
3. Finished products
4. Car assembly Production of passenger cars for third parties Production of press parts for third parties
VDL Nedcar is fully owned by VDL Groep B.V.
VDL Groep comprises four divisions
Presentation VDL Nedcar1 mei 2023
4
VDL Nedcar is an experienced Dutch contract manufacturer with state-of-the-art facilities and a production capacity of ~330 KVDL NEDCAR AT A GLANCE
• Experienced Dutch automotive contract manufacturer
• Long-term relationships with renowned European and Japanese OEMs
• Fully owned by VDL Groep• Employing ~ 4.500 automotive
professionals
• Current technical production capacity (paint shop)– 220,000 cars p.a. (2 shifts)– 330,000 cars p.a. (3 shifts)
• Total # of cars produced: > 4.7 million cars in47 years
CAPACITY COMPANY
FACILITIES• State-of-the-art equipment in 4 shops
– Press: 2 advanced CCFT and 6 highlyefficient traditional press lines
– Body: highly automated (>1200 robots)– Paint: water-based paint process– Final assembly: 1 assembly line
• Surface of site: ~ 930,000 m2
• Surface of built area: ~335,000 m2
1 mei 2023 Presentation VDL Nedcar
VDL Nedcar has a convincing track record of manufacturing passenger cars for renowned European & Japanese automotive OEMs
5 Presentation VDL Nedcar1 mei 2023
6
VDL Nedcar has state-of-the-art passenger vehicle production facilities and equipment in four different shopsOVERVIEW OF VDL NEDCAR FACILITIES
• Equipment: 6 tandem press lines • 2 CCFT1) presses• Capacity: 4,747 hours (in 3
shifts)
• Surface: 70,000 m2
• Equipment: ~ 1200 robots• Capacity: ~ 47 cars/hour
• Surface: 78,500 m2
• Equipment: PT-ED/ topcoat and WAX line
• Capacity: ~ 61 cars/hour
• Surface: 112,000 m2
• Equipment: ~19 robots• Capacity: ~ 58 cars/hour (main line)
1 Press shop
Body shop2
3
4Final assembly shop
Paint shop
1) Crossbar Cup Feed Transfer
Logistics
Presentation VDL Nedcar1 mei 2023
VDL Nedcar recent Facts & Figures Independent Vehicle Contract Manufacturer (with BMW as first customer) Car production for BMW of 3 models:
1. MINI Hatch SOP 07-20142. MINI Cabrio SOP 11-20153. MINI Countryman SOP 11-2016
Press parts production for DAF Revenue 2015: 912 mln Revenue 2016 H1: 673 mln 5000 employees in 2017
1 mei 2023 Presentation VDL Nedcar7
VDL Nedcar Planning and Control Cycle Controlling dept. consists of 7 employees
■ 1 manager controlling => activities include budgetting■ 4 cost controllers => activities include budgetting■ 1 costing controller => activities do not include budgetting■ 1 investment controller => activities do not include budgetting
Process■ Initial Budget (1 year forward)■ Monthly Budget updates (remaining months forward)■ Month End Closing (realisation actuals vs budget)
Key drivers■ FTE’s / Salaries■ Car models (different models mean different sales/cost)■ Car volume (for sales & costs)■ Differentiation between production / project costs
1 mei 2023 Algemene presentatie VDL Nedcar8
Background Budget Tools
Volvo / Mitsubishi era 1999-2001: Hyperion Pillar
Mitsubishi era 2001-2012: Hyperion Pillar
BMW era 2013-2015: Excel
BMW era 2016-: Hyperion Planning
1 mei 2023 Presentation VDL Nedcar9
Tool selection: Restrictions Excel budget model
Complex model without documentation High chance of errors (links, formula’s, structure), Manual masterdata management Limited possibilities (comparisons, what-if analyses, reports, data extraction) No cross-sections of the data
Conclusion:Budget data management and reporting capabilities must be improved through using a real budget model with a database.
1 mei 2023 Presentation VDL Nedcar10
Tool selection: Excel vs Pillar
Difficult to convert complex BMW contract with many Result Area’s to a budget in Hyperion Pillar.
Time constraint to process organizational changes in Hyperion Pillar.
A very short term solution was needed, due to time constraints and dept capacity.
1 mei 2023 Presentation VDL Nedcar11
Maturity move
1 mei 2023 Presentation VDL Nedcar12
Project Key Points Support for easy budget uploads to SAP Support for interfacing SAP masterdata to Hyperion (GL, CC, PC) Creation of an integral P&L including alle costs on CC and profits on PC. Differentiation between production and different projects (seperate P&L) FTE cost calculation based on different FTEs per:
■ Cost Centre■ FTE category■ Type of employment
FTE cost allocation to projects FTE cost calculation of extraordinary production days Cost on combination GL – CC can be result of calculation, fixed input, or both. Adding comments to the input of controllers for explaining changes
1 mei 2023 Algemene presentatie VDL Nedcar13
Tool selection: rating of available toolsShortlist: Oracle Hyperion IBM Cognos SAP BPC
Rated key area’s: Functionality Flexibility Cost Ease and duration of implementation Ease and cost of maintenance Security
1 mei 2023 Presentation VDL Nedcar14
Tool selection: Oracle Hyperion Planning
1 mei 2023 Presentation VDL Nedcar15
On-premise variant.
Main selection reasons: Functionality Flexibility Usability
■ Excel integration■ Ease of maintaining the tool inhouse
Implementation Coaching approach
■ 1 member from the VDL Nedcar controlling was project manager and responsible for the implementation.
■ 1 member of the VDL Nedcar IT was responsible for the link between controlling and IT (installing on premise, effects on SAP, backup-recovery)
Lessons Learned:■ 100% involvement from controlling/end user in implementation:
eases tool adoption eases changes to tool when Finext support has ended
■ Backup & restore procedure needed during implementation■ Difficult to get development for testing inline with production.
1 mei 2023 Presentation VDL Nedcar16
Project Impact
1 mei 2023 Presentation VDL Nedcar17
Project impact on the organization■ Project duration: 10 months (not full time)■ 1 member of controlling project support for 3 days per week for 10 months
(± 1.000 hours)■ Support from Finext ± 390 hours
Project impact on IT■ Minimal impact on IT for:
support during installation on premise (5 days) support for backup-recovery procedure (5 days)
Project Planning
1 mei 2023 Presentation VDL Nedcar18
DeliverablesInstallatie hardware & softwareDesignPrototypingDevelopment (metadata, forms, tasklists, bus. rules, reports.InterfacingValidationImplementationTraining eindgebruikersAfronding overige zakenOplevering / Eind implementatie per 1-9-2016After Live Support
Dec
2016
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
Realization (benefits of using Hyperion) Previously 1 budget controller who gathered and executed all
monthly changes for all controllers.=> less involvement and knowledge from other controllers
Now more efficiency due to actively changing/reporting and controlling the budget at any time for all controllers.
Data flexibility; data can be presented in all possible cross sections Reporting possibilities Masterdata control through SAP interface Long term budgetting/forecasting possible (>10 year) Back-up and recover possibilities. Back-up budget controller more easy to educate than in excel.
1 mei 2023 Presentation VDL Nedcar19
Plans for the future in Hyperion Forecasting Liquidity budget/forecast Balance sheet Balance sheet + link liquidity budget + link WIP projects
1 mei 2023 Algemene presentatie VDL Nedcar20
Drive safe, but…. have fun on the road
1 mei 2023 Presentation VDL Nedcar21
Hyperion at VDL - Tasklist
1 mei 2023 Algemene presentatie VDL Nedcar23
Hyperion at VDL – Workforce planning
1 mei 2023 Algemene presentatie VDL Nedcar24
Hyperion at VDL – Business Rules
1 mei 2023 Algemene presentatie VDL Nedcar25
Hyperion at VDL – Smart View
1 mei 2023 Algemene presentatie VDL Nedcar26
Hyperion at VDL – (process) Reporting
1 mei 2023 Algemene presentatie VDL Nedcar27