Investigation of Flooding in Area 2(Leaside Area)
Public Information Centre #2
View displays and discuss the study with project staff
Feel free to ask questions and fill out a comment sheet
1
Purpose of Tonight’s Meeting
• Overview of problems in the study area
• Outline the factors contributing to basement and surface flooding
• Present the options considered
• Present the recommended solutions
• Outline the next steps
• Hear from you! Your input is very important
2
Purpose of Our Study and Study Area• Investigation includes:
Examine existing stormwater drainage, combined and sanitary sewer systems and identify the causes of basement flooding and/or surface flooding in Area 2; and,
Make recommendations to reduce the risk of future flooding in Area 2.
3
Sewer Infrastructure• Area 2 is serviced by a
combination of sanitary, combined and storm sewers.
Combined Sewer System
Separated Sewer System
4
Our Basement Flooding FindingsUnder normal rainfall events, the storm, sanitary and combined sewer systems operate as designed. However, during extreme storms, the following takes place:•Stormwater flows exceeds the capacity of the storm and combined sewers and overloads the system.
•Water remains on the surface and flows along roads and creeks.
•Water can enter the basements from the surface via doors, window wells and reverse-slope driveways.
•At low lying areas, water accumulates (ponds) on the surface and streets and enters the sanitary sewer system through manhole covers. This causes the sanitary sewers to surcharge and potentially backup into basements.
5
Our Basement Flooding Findings (Cont’d)
• Excess stormwater can enter the sanitary sewer system during extreme events. • The ground and soils can become saturated with water
that can enter the sanitary sewer system through cracks, holes or damaged joints in pipes and maintenance holes located underground.
• In low lying areas, water accumulates (ponds) on the surface and can enter the sanitary sewer system through manhole covers.
• There are some homes with downspouts and/or foundation drain connections to the sanitary sewer system. These are direct connections and allow stormwater to enter the sanitary sewer system.
• If stormwater enters basements through doors, window wells or reverse slope driveway drains, it often enters the basement floor drain which is connected to the sanitary sewer system.
• Once the sanitary sewer system is surcharged, there is a risk of backup into basements.
6
Causes of Basement Flooding(Separated System)
7
Causes of Basement Flooding
Note: typical connections shown, however private drainage systems can be more complex and each one is unique.
8
Options Considered for Reducing Flooding
Source control measures involve managing stormwater where it originates (roofs, roads, driveways), before it enters the City’s sewer systems.
These measures include:Downspout disconnection
Rain barrels
Catchbasin inlet controls
Surface flow path diversion
Bioretention units
Sanitary sewer rehabilitation
Source Controls Conveyance Controls
These measures include:Alternate road cross-sections (grassed ditches / swales)
Bioretention units and bioswales
Overland flow control
Sewer pipe diversion, replacement or twinning
Sewer separation in combined sewer areas
End-of-Pipe Controls
These measures include:Surface dry ponds
Surface wet ponds
Underground storage tanks or underground storage pipes
Conveyance control measures help to control stormwater as it travels along the drainage system (in pipes or along the road).
End-of-pipe control measures control stormwater and CSOs just before it is discharged to a watercourse (stream, river, or lake).
9
Evaluation of Options
Natural Environment• Potential Impact on Terrestrial Systems (Vegetation, Trees,
Wildlife)• Potential Impact on Aquatic Systems (Aquatic Life and
Vegetation, Surface Water, Groundwater)• Soil and Geology
10
Social Environment
• Effect on Urban Greenspace (Parks, Ravines, Open Spaces)
• Disruption to Existing Community During Construction (Traffic, Noise)
• Disruption to Existing Community Post Construction (Visual Impact, Odour, Safety)
• Archaeology, Heritage Resources and First Nations
Technical Considerations
• Feasibility of Control Measure (Available Space, Accessibility, Constructability)
• Effectiveness in controlling basement and/or surface flooding
• Impact on Upstream and Downstream Infrastructure
• Operations & Maintenance RequirementsCost Considerations
• Capital Costs
• Operating & maintenance costs
Economic
The following criteria were used to evaluate options and identify the recommended solutions:
Recommended Solutions
Install catchbasin inlet control devices at identified locations
Increase the number of catchbasins in low lying areas
Roof leader disconnection to limit stormwater entering the sanitary or
storm sewer system
11
Recommended Solutions
• Replace existing storm and/or sanitary sewers with larger diameter sewers at various locations where required to provide additional conveyance capacity in the sewer system.
What Does it Involve?• Road excavation within the City’s Right-of-Way• Removal of old sewer and structures (manholes & catchbasins)
and disconnection of sewer service line(s)• Placement of new sewer, reconnection of sewer service line(s)• Some tree removals and replacement (after construction is
completed) may be required• Restoration of road upon completion of construction.
Storm and/or Sanitary Sewer Replacement and Upgrades
12
Recommended Solutions
• Construct new storm sewers at various locations to separate combined sewers and provide additional conveyance capacity in the sewer system.
What Does it Involve?• Road excavation within the City’s Right-of-Way• Placement of new storm sewer(s)• Disconnection and reconnection of existing sewer service lines
(if necessary)• Some tree removals and replacement (after construction is
completed) may be required• Restoration of road upon completion of construction.
New Storm Sewers for Sewer Separation
13
Recommended Solutions
• Replace a portion of an existing sewer with a larger ‘superpipe’ to provide temporary storage of wet weather flow. Once sewer capacity is available, the ‘superpipe’ is drained by gravity.
What Does it Involve?• Road excavation within the City’s Right-of-Way• Potential removal of old sewer and structures (manholes &
catchbasins) and disconnection of sewer service line(s)• Placement of new sewer and potential reconnection of sewer
service line(s)• Some tree removals and replacement (after construction is
completed) may be required• Restoration of road upon completion of construction.
Underground In-Line Storage
14
Area 2 – Recommended Infrastructure
15
Area 2 - Summary of Recommended Infrastructure
• Recommended infrastructure needed to provide basement flooding protection includes:
– New storm sewers to complete sewer separation on Craig, Bessborough, Donlea, Rumsey, Hanna, Vanderhoof, Flemming, Cameron, Astor, Sutherland, Markham and Esandar.
– New storm sewers to provide additional capacity on McRae, Burnham, Heath, Bennington Heights, Moorehill, Mallory, Rykert, and Broadway.
– New in-line storage storm sewers to store excess wet weather flow on Southlea, Bessborough, Moore and Pottery.
– Additional catchbasins or catchbasin inlet controls on Millwood, Vanderhoof, Laird, Commercial.
– New in-line storage sanitary sewer on Bennington Heights to store excess wet weather flow.
– New sanitary sewers to provide additional capacity on Burnham, Lumley and Heath.
– Inflow/ infiltration investigation for Copeland Area to identify sources of infiltration and inflow into the sanitary sewer system.
16
Next StepsAnticipated
TimelineWhat Will Happen?
After Tonight’s Meeting
After tonight’s meeting, the Study Team will review and consider your comments to finalize the preferred solution for Area 2.
Late 2014A Notice of Study Completion will be issued and a Project File Report will be placed in local libraries for a 30 day public review period.
After Completion of the Environmental Assessment Process
Implementation of the Recommended Projects – inclusion of the recommended projects in the City’s 5 Year Basement Flooding Protection Project List. Implementation timing will depend on:
• Sequencing of projects from completed basement flooding EA studies, as per City Council approved criteria.
• Coordination with other planned infrastructure projects (e.g. Transportation and utilities projects) in the area as per the City’s Multi-Year Capital Coordination Plan.
17
Thank You for Attending
We welcome your feedback. Please fill out the comment sheet provided.Following this PIC, the study team will review and consider your comments in
the final selection of the preferred alternatives.
Contact InformationFor more information on this study, or to provide your comments or be placed on the
project mailing list, please contact:
Josie Franch, Public Consultation Unit55 John Street, Metro Hall, 19th Floor, Toronto, ON M5V 3C6
Phone: 416-338-2859, E-mail : jfranch@toronto.ca
Fax: 416-392-2974, TTY: 416-338-0889
Website: http://www.toronto.ca/involved/projects/basement_flooding/sa_2.htm
18
top related