park school modernization summer 2012. new paint, new glass, new landscape, new flagpole, and new...

Post on 31-Mar-2015

214 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Park School ModernizationSummer 2012

New paint, new glass, new landscape, new flagpole, and new paving

Before AfterEntry

New retaining wall, fence, and walkway around tree made of pavers

Before AfterSidewalk dead ends into tree

New paint, new asphalt, new lights, new railings, stairs, ramps, seat walls, planters, and planting

Before AfterSouthern entrance into school

New window glazing, water fountain, paint, asphalt, lighting and playground striping

Before AfterBack of school

New addition to building adding 3 restrooms, covert old restroom to storage room, new planter with seat walls, plants, and new concrete walkways

Before AfterOld boys restroom

New seat walls, planters, planting, walkways, asphalt, paint, new glazing, and covered walkway

Before AfterPlanter

New ball walls, seat walls, planters, planting, walkways, asphalt, paint, new window glazing, and covered walkway

Before AfterCampus

New seat walls, planters, planting, asphalt, concrete walkways, paint, new window glazing, and covered walkway

Before AfterCampus

New ball walls, seat walls, planters, planting, asphalt, concrete walkways, paint, new window glazing, and covered walkway

Before AfterCampus

New Exit stairs, paint, and playground striping

Before AfterExit stairs

New exit stairs and playground striping

Before AfterExit stairs

New siding on Annex Building

Before AfterOld siding on Annex Building

New ADA compliant ramp and retaining wall

Before AfterRamp

New entry store front, paint and railing

Before AfterEntry

New Paint

Before AfterCeiling at front entry

New casework and paint

Before AfterResource room

New white boards, pin up boards, column cover, carpet, storage closet, ceiling lighting, and heater

Before AfterLower level classroom

New casework, flooring, in-fill walls, sink, lighting, paint and pin-up boards

Before AfterLower level classroom

Flooring, paint, pin-up panels, restroom addition, convert old restroom to storage room, and new fire alarm with sprinkler

Before AfterHallway

Building addition for three restrooms, new water fountain, fire alarm with sprinkler, flooring and paint

Before AfterHallway

New carpet, paint, door, counter, pin-up panels

Before AfterAdministrative offices

New wall creating nurse station, new paint, flooring, doors

Before AfterAdministrative Office

Remove wall, new casework, new sink

Before AfterStaff work room

New window glazing where windows failed

Before AfterTypical Classroom

New projector, screen, speakers, clock, paint, carpet, fire alarm with sprinkler, ceiling fans, and thermostat controls for radiator

Before AfterTypical classroom

New storefront exit system, larger landing with abrasive action carpet new railing

Before AfterExit stairs

All new fixtures and finishes

Before AfterTypical upper restroom

top related