páginas de curriculum inglés-17

Post on 29-Mar-2016

225 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

DESCRIPTION

Actur North Health Center. Saragossa CONAVINSA San Pedro Hospital (Logroño) UTE NECSO - ACS - MABESA Castejón Surgery (Navarre) EXCAVACIONES Y OBRAS PÉREZ DEL RÍO Actur West Health Center. Saragossa (Aragón) ESTRUCTURAS ARAGÓN Extension of the Pamplona University Hospital CONSTRUCCIONES FLORES Senior People Attention Center. Pamplona UTE MASTIL MARCO - HUMICLIMA Extension and improvement of the Barbastro Hospital (Huesca) ESTRUCTURAS ARAGÓN 175

TRANSCRIPT

16. HOSPITALS AND MEDICAL CENTRES

San Pedro Hospital (Logroño) UTE NECSO - ACS - MABESA

Calahorra Regional Hospital ACS

Extension of the Pamplona University Hospital CONSTRUCCIONES FLORES

Logroño Alzheimer centre UTE DRAGADOS-IZA

Castejón Surgery (Navarre) EXCAVACIONES Y OBRAS PÉREZ DEL RÍO

Extension and improvement of the Barbastro Hospital (Huesca) ESTRUCTURAS ARAGÓN

Actur West Health Center. Saragossa (Aragón) ESTRUCTURAS ARAGÓN

IASS Picarral day centre SACYR

Actur North Health Center. Saragossa CONAVINSA

Senior People Attention Center. Pamplona UTE MASTIL MARCO - HUMICLIMA

175

SAN PEDRO HOSPITAL IN LOGROÑO-2008

HOSPITALS AND MEDICAL CENTRES

Hospitals and Medical Centres

176

top related