Overcoming Construction Challenges:

The Dixboro Road Bridge Project

• “Old” bridges originally constructed 1921; widened 1969.

• Road Commission received notification from the MDOT of the Critical Bridge award in 1992.

• Preliminary corridor study initiated 1995; Environmental Assessment initiated 1997, completed 1999.

• Final design commenced 2000.

• Project bid January 2004. Low bid $9.6M, 2.2% over Engineers Estimate.

April 1947

December 1956

2

3

4

5

6

7

8

9

10

Dixboro Road over Huron River: Pier 2Jet Grout Soil-Cement Testing Summary

0

200

400

600

800

1000

1200

1400

1600

1800

2000

0 7 14 21 28 35Sample Age, days

Unc

onfin

ed C

ompr

essi

ve S

tren

gth,

ps

i

ws-Col.3-5.5'ws-Col.3-0.5'ws-Col.2-0.5'ws-Col.2-5.5'ws-Col.2-0.5'C2-1-aC2-1-bws-Col.1-spoilsws-Col.1-spoilsws-Col.18-1.0'ws-Col.10-0.5'ws-Col.10-0.0'ws-Col.23A-0.5'ws-Col.9-spoilsws-Col.23A-0.0'ws-Col.10-0.5'ws-Col.7-2.5ws-Col.7-0.5ws-Col.7-4.5ws-Col.6-2.0ws-Col.19-3.511/19 R2 P411/19 R3 P1ws-Col.3-4.5core-Col.5/10core-Col.5/10core-Col.2/3core-Col.2/3PP46861 updated 12/14/2004

Pier 2 Grout Strengths

0500

100015002000250030003500400045005000

11/05 11/06 11/07 11/08 11/09 11/10 11/11 11/12 11/13 11/14 11/15 11/16

Construction Date

Com

pres

sive

Str

engt

h, p

si

71428

Test Age, days

11

12

13

14

15

16

17

18

19

20

21

22

23

24

top related