Optimizing Resources For Improved Performance

CIPEC Energy Summit 2018

GAY LEA FOODS CO-OPERATIVE LTDMAY 30, 2018

ZBIGNIEW EWERTOWSKI, P.ENG.DIRECTOR, OPERATIONS TECHNOLOGY

GAY LEA FOODS CO-OPERATIVE LTD.5200 Orbitor Drive

Mississauga, Ontario

2

GAY LEA FOODS briefly:

• 11 manufacturing facilities: 9 in Ontario, 1 in Manitoba, 1 in Alberta

• 662,000,000 litres of milk processed in F2017 (bovine and goat combined)

• Employees: 1,012• Sales in F2017: 788 M

3

Gay Lea range of products:

4

Fluid milk, Cream, Whipped Cream, Various Cheeses, Cottage Cheese, Sour Cream, Butter, Milk Powder, Yoghurt

SPECIFIC NATURE OF DAIRY INDUSTRY

1. Biologically active substrates – dynamic in nature2. Perishable foods3. Shear sensitive4. Heat treatment to destroy pathogenic microorganisms

and extend shelf life:- Pasteurization and sterilization- Refrigeration and freezing- Concentration and Drying

5. Sanitary aspects6. CFIA compliance

5

SAVING ENERGY AND WATER

SAVING ENERGY AND WATER MAKES SENSE FROM ABUSINESS & ENVIRONMENTAL PERSPECTIVE

6

ENVIRONMENT

Environmental issues specifically associated with dairyprocessing facilities include the following:• Wastewater• Solid waste• Emissions to air• Energy consumption

7

BENCHMARKING PROCESS

• By benchmarking energy and water intensity against a known

reference dairy process we can evaluate the energy and water

efficiency of our processes

• The reference dairy process is based on existing and proven

practices and technologies identified from available sources.

• Benchmarking can be used as an energy management strategy

8

BENCHMARKING cont’d

• The benchmark score values can be used to indicate relative performance of our dairy process compared to the most efficient process identified e.g. European BAT (Best Available Technology).

• The outcomes from comparisons may become a basis to evaluate potential for savings and to consider future improvements

9

KPI

We develop KPIs for what we can control at the plant operations

level. Key metrics include reducing kWh of electricity, m³ of

natural gas and water, and kg of BOD concentrations

10

EXAMPLES FROM THE BENCHMARKING PROCESS

11

PLANT "A" Electricity Usage (2016)

12

0.138 0.1370.150

0.136

0.161 0.1670.180

0.163 0.168 0.171

0.148

0.222

0.000

0.050

0.100

0.150

0.200

0.250

kWh

adj./

Litr

e M

ilk

Month

Electricity (kWh adj./L) Average

Plant "A" Natural Gas Usage (2016)

13

0.022

0.0250.023

0.0210.021

0.018

0.0150.017

0.018

0.020 0.021

0.027

0.000

0.005

0.010

0.015

0.020

0.025

0.030

Cub

ic M

eter

/Litr

e M

ilk

Month

Gas (m3/L) Average

Plant "A" Water In Usage (2016)

14

3.3883.696

4.026

3.502

3.9953.732 3.694

3.3103.650

3.899

3.422

5.187

0.000

1.000

2.000

3.000

4.000

5.000

6.000

Litr

e W

ater

/Litr

e M

ilk

Month

Water In (L/L) Average

Plant "A" Wastewater Generation (2016)

15

3.0822.750 2.877

2.520

2.890 2.804 2.8232.555

2.785

3.1622.810

4.827

0.000

1.000

2.000

3.000

4.000

5.000

6.000

Litr

e W

ater

/Litr

e M

ilk

Month

Water Out (L/L) Average

GAY LEA FOODS’ RESOURCES SAVING INITIATIVES

16

WATER

• Reduction of demand for water in processing

• Reduction of demand for water in cleaning

• Reduction of demand for water in utilities

• Water recycling and reuse

• Wastewater treatment processes

17

ENERGY: ELECTRICITY AND HEAT

• Conducted Audits to identify opportunities • Implementation of the findings in the compressed air and

steam• Heat recovery

18

YIELD OPTIMIZATION AND PRODUCT RECOVERY

• Sources of product loss

• The cost of product loss

• Efficient processing and process control

• Minimizing waste

• Maximizing product recovery

19

GOAL

Reduce first, Recover-Reuse last