ogp - shapcc
Post on 02-Jun-2018
238 Views
Preview:
TRANSCRIPT
-
8/10/2019 OGP - SHAPCC
1/42
International Association of Oil and
Gas Producers
Don SmithTechnical Manager
-
8/10/2019 OGP - SHAPCC
2/42
International Association of
Oil & Gas Producers
(OGP)
PROFILE
Formed 1974
Worldwide association of oil and gas producers
Members - private and state oil companies, national associations and
petroleum institutes
Observer status as an NGO with global and regional bodies
Work closely with UN agencies - IMO, UNEP, ILO and the European
Union
Based in London with second office in Brussels
-
8/10/2019 OGP - SHAPCC
3/42
MEMBERSHIP AND OPERATIONS
57 Members:
44 E&P Companies
2 Associate members (Halliburton and Schlumberger)
8 National Associations3 Institutes
Members operating in over 80 countries covering 7 regions (North America,
South America, Europe, Russia & Caspian, Africa, Middle East and Asia &
Australasia)
Average 18 publications per year
-
8/10/2019 OGP - SHAPCC
4/42
-
8/10/2019 OGP - SHAPCC
5/42
ORGANISATIONcontinued
Sub committees
Over 50 with 600 registered participants
SecretariatLondon - 9 staff
Brussels - 5 staff
-
8/10/2019 OGP - SHAPCC
6/42
ORGANISATION
Management Committee
8 elected members + 1 Associate member
Standing Committees
Environmental Quality (EQC)
Safety, Health & Personnel Competence (SHAPCC)
Decommissioning
Offshore Structures
Meteorology & Oceanography (Metocean)
Standards
Legal & Insurance
European Union (EUC)
External Affairs
-
8/10/2019 OGP - SHAPCC
7/42
SHAPCCSafety, Health and Personnel Competency Committee
Chair: Tom Theriot (ExxonMobil)
-
8/10/2019 OGP - SHAPCC
8/42
SHAPCC Sub-committees and Work Groups
Aviation: Des Richards (BHP)
Health: Alex Barbey (Schlumberger)
Security: Nigel Carpenter (BP)
Seismic: Stewart Davidson (Shell)
FPSO Marine Risks Guideline WG: Dick Pomfret
(ExxonMobil)
Human Factors WG: Melissa Roberts (Texaco) Risk Management Work Group
-
8/10/2019 OGP - SHAPCC
9/42
Recent and Future Deliverables
Aviation
Airline Safety MechanismHelicopter Incident Report
Airline Safety Assessment Mechanism LIP (Complete)
Audit Questionnaire and Checklist (Revision)
Refueling Checklist
Helideck Checklist (Revision)
Offshore Diversions (Issued)
1999/2000 Safety Performance of Air Operations
Helideck size
Aircraft Management Guide
Minimum Equipment List
Helicopter Underwater Training
Helicopter Operations Monitoring ProgrammePilot Experience Levels
Flights and Duty Time Limitation
Single v Twins
HealthGuidelines for the control of HIV, Hepatitis
B and C in the Workplace
Managing Health for Field Operations in Oil
and Gas Activities
Health Risk Assessment GuidelineHealth Performance Indicators
Security
Firearms and the Use of Force
Guidelines for expatriates in high risk areas
Strategies for dealing with the illegaldetention of workers at facilities
Piracy Important issue probably adequately
dealt with elsewhere
SeismicHSE Aspects in a Contracting Environment
for Geophysical OperationsProduction of a Seismic Document CD-Rom
Seismic Risk Assessment
Problems obtaining Seismic Accident Data
Seismic Environmental Issues
Pro-active representation of OGP members
Marine Risks
Guideline for Managing Marine RisksAssociated with FPSO OperationsHuman Factors
HF Brochure
HF Website
Number of LWDC by Category
Resp.
2%
Back and
low er limb
34%
Other27%
Upper Limb
and neck
19% Skin
4%
Infections
12%Mental
3%
-
8/10/2019 OGP - SHAPCC
10/42
SHAPCC Activities
Year 2000 Safety Report
Further analysis of 15 years of safety data
Sharing company safety experiences
Risk Management Guideline
Collecting and disseminating safety information
Improving the process for dealing with EU H&S Issues
- Exposure to Asbestos - Noise
- Working at height - Explosive Atmospheres
- Vibration - Pressure Equipment Directive
- General EU Health and Safety (occupational health) initiatives
- Sevaso Directive - EU Competency Issues
-
8/10/2019 OGP - SHAPCC
11/42
Safety Performance of the Global E&P
Industry - 2000
39 Organisations submitted 1.6 Billion manhours of
data
Around half the worlds oil production represented
All data supplied to common format and definitions
-
8/10/2019 OGP - SHAPCC
12/42
Fatal Accident Rate
0
2
4
6
8
10
12
14
16
18
1990 1992 1994 1996 1998 2000 2002
YEAR
FA
R
OVERALL
COMPANYCONTRACTOR
FAR = No. of Fatalities per 100 million workhours
-
8/10/2019 OGP - SHAPCC
13/42
-
8/10/2019 OGP - SHAPCC
14/42
Fatality Causes
Struck by21%
Falls
8%
Explosions
/Burns
8%
Electrocution
5%
Drowning
7%
Other
3%
Vehicle
Incidents
30%
Unknown
9%
Air Transport
1%
CaughtBetween
8%
-
8/10/2019 OGP - SHAPCC
15/42
Lost Time Injury Frequency
0
1
2
3
4
5
6
7
1990 1992 1994 1996 1998 2000 2002
YEAR
LTIF OVERALL
COMPANY
CONTRACTOR
LTIF = (Fatalities + Lost Work Day Cases) per million workhours
-
8/10/2019 OGP - SHAPCC
16/42
Lost Time Injury Frequency
Comparison with other Statistics
0
1
2
3
4
5
6
7
8
9
1990 1992 1994 1996 1998 2000 2002
YEAR
LTIF
OVERALL
COMPANY
CONTRACTOR
IADC
CIA (Emp)
CIA (Cont)
LTIF = (Fatalities + Lost Work Day Cases) per million workhours
-
8/10/2019 OGP - SHAPCC
17/42
LTIF Comparison of Companies
0
2
4
6
8
10
12
14
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA BB CC DD EE FF GG HH II JJ
Company Code
LTIF
Max 33.3
-
8/10/2019 OGP - SHAPCC
18/42
Total Recordable Incident Rates
5-Year Average
0
1
2
3
4
5
6
7
8
9
1996 1997 1998 1999 2000
Year
TR
IROverall
Company
Contractor
TRIR = (Fatalities + Lost Work Day Cases + Restricted Workday
Cases + Medical Treatment Cases) per million workhours
-
8/10/2019 OGP - SHAPCC
19/42
Safety Information
Collection and Dissimination
Challenge:
To ensure that safety related information(alerts, incidents, high consequence near miss
data) is readily available to the individuals who
need it.
-
8/10/2019 OGP - SHAPCC
20/42
Information Flow
OGP website:Database and Links
Safety Alerts
Near miss information
Incidents
Other Safety Databases
HSE Managers
Key Individuals
Other Mechanisms?
Phase 1 Phase 2
-
8/10/2019 OGP - SHAPCC
21/42
Technology and OperationsCoordinating Committee
(TOCC)
Structures
Metocean
Standards
Decommissioning
-
8/10/2019 OGP - SHAPCC
22/42
TOCC
Propose that we re think role of TOCC and
Structures Committee.
TOCC has limited value.
Structures Committee has many Industry competitors
(unlike Metocean, Standards & Decommissioning) and
attendance has declined.
Need for means of addressing broader Engineering
and Operational issues.
-
8/10/2019 OGP - SHAPCC
23/42
Process for gaining member input to defining
any new organisation
Workshop 2002 Houston or London
Objectives
- Identify engineering & operations issues that OGP might
address & type of activity.
- How best to progress these issues.
- Overall committee structure in eng/ops area.
- Obtain commitment to participate.
-
8/10/2019 OGP - SHAPCC
24/42
Workshop Invitees
Existing TOCC Committee Chairmen
Structures Committee Members
Senior Eng & Ops staff in member companies
OGP Management Committee
-
8/10/2019 OGP - SHAPCC
25/42
Possible Eng & Ops Issues
Integration & Interface
Execution & Operation risks
Reliability based maintenance & manning
Human/systems interface International training & competence
Resources
International Regulatory Issues
Eng solutions to environmental issues Structural issues as existing committee
-
8/10/2019 OGP - SHAPCC
26/42
Structures Committee
Chair: Richard Snell (BP)
-
8/10/2019 OGP - SHAPCC
27/42
Structures
2001 Activity: Floating Systems Workshop
(with Metocean) Identified need for new design practice.
Interaction with Jack-Up Community Became the focus of Operator input to SNAME
and IADC jack-up assessment practices.
- Arctic Structures Standard Background technical appreciation leading
to ISO NWI.
- Geohazards Earlier work has initiated R&D. Position paper
under preparation.
- Structures Standard Editing LIP
-
8/10/2019 OGP - SHAPCC
28/42
-
8/10/2019 OGP - SHAPCC
29/42
-
8/10/2019 OGP - SHAPCC
30/42
Standards Committee Activities - 1
Standards Session held at OTC 2001 Organised by the committee to raise the profile of the TC67
activities throughout the industry
OGP Standards Position Paper Updated
Revised paper available on website Worldwide Distribution
To promote use of International
Standards throughout the oil industry
2ndInternational Standards Bulletin Issued
-
8/10/2019 OGP - SHAPCC
31/42
Standards Committee Activities 2
2ndPhase of Technical Editing LIP Initiated 10 organisations have agreed to contribute:
API, BP, DONG, Enterprise, IP, MMS, Norsk Hydro,Petrobras, Repsol, Shell
ADDITIONAL SUPPORT REQUIRED!!!
Around 16 ISO Standards to be issued this year (target 22) Delays at ISO CS
OGP talking to ISO to resolve issue
Problems in preparing standards
Organisations/individuals not being able to dedicate sufficient timeto ISO effort
Publication Target for 2002: 22 STANDARDS
-
8/10/2019 OGP - SHAPCC
32/42
Technology and OperationsCoordinating Committee
(TOCC)
Structures
Metocean
Standards
Decommissioning
-
8/10/2019 OGP - SHAPCC
33/42
TOCC
Propose that we re think role of TOCC andStructures Committee.
TOCC has limited value.
Structures Committee has many Industry competitors
(unlike Metocean, Standards & Decommissioning) and
attendance has declined.
Need for means of addressing broader Engineering
and Operational issues.
-
8/10/2019 OGP - SHAPCC
34/42
Process for gaining member input to defining
any new organisation
Workshop 2002 Houston or London
Objectives
- Identify engineering & operations issues that OGP might
address & type of activity.
- How best to progress these issues.
- Overall committee structure in eng/ops area.
- Obtain commitment to participate.
-
8/10/2019 OGP - SHAPCC
35/42
Workshop Invitees
Existing TOCC Committee Chairmen
Structures Committee Members
Senior Eng & Ops staff in member companies
OGP Management Committee
-
8/10/2019 OGP - SHAPCC
36/42
Possible Eng & Ops Issues
Integration & Interface
Execution & Operation risks
Reliability based maintenance & manning
Human/systems interface International training & competence
Resources
International Regulatory Issues
Eng solutions to environmental issues Structural issues as existing committee
-
8/10/2019 OGP - SHAPCC
37/42
Structures Committee
Chair: Richard Snell (BP)
-
8/10/2019 OGP - SHAPCC
38/42
Structures
2001 Activity: Floating Systems Workshop
(with Metocean) Identified need for new design practice.
Interaction with Jack-Up Community Became the focus of Operator input to SNAME
and IADC jack-up assessment practices.
- Arctic Structures Standard Background technical appreciation leading
to ISO NWI.
- Geohazards Earlier work has initiated R&D. Position paper
under preparation.
- Structures Standard Editing LIP
-
8/10/2019 OGP - SHAPCC
39/42
-
8/10/2019 OGP - SHAPCC
40/42
Standards Committee
Chair: Alf Reidar Johansen (Norsk Hydro)
-
8/10/2019 OGP - SHAPCC
41/42
Standards Committee Activities - 1
Standards Session held at OTC 2001 Organised by the committee to raise the profile of the TC67activities throughout the industry
OGP Standards Position Paper Updated
Revised paper available on website Worldwide Distribution
To promote use of International
Standards throughout the oil industry
2ndInternational Standards Bulletin Issued
-
8/10/2019 OGP - SHAPCC
42/42
Standards Committee Activities 2
2nd
Phase of Technical Editing LIP Initiated 10 organisations have agreed to contribute:
API, BP, DONG, Enterprise, IP, MMS, Norsk Hydro,Petrobras, Repsol, Shell
ADDITIONAL SUPPORT REQUIRED!!!
Around 16 ISO Standards to be issued this year (target 22) Delays at ISO CS
OGP talking to ISO to resolve issue
Problems in preparing standards
Organisations/individuals not being able to dedicate sufficient timeto ISO effort
Publication Target for 2002: 22 STANDARDS