objective 2015

Post on 23-Feb-2018

215 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

  • 7/24/2019 Objective 2015

    1/3

    Support the proposal department in preparing the technical proposals for upcoming projects

    including construction schedule, method statements, water handling schemes, camp

    facilities, mobilization schedule, RFQ's and design brief of various projects such as Koto H,

    Karora H, !abori H, "asu H, #rimmu $arrage,anjnad $arrage, %awi H, &aitltan,

    aulong "am, Kurram #angi "am and !aggran (( H etc)

    Support the (nfrastructure $usiness *rea in meeting technical re+uirements such as

    hdraulic, structural, architectural, electrical and mechanical design for various running

    projects such as Khan-i $arrage rojet, !innah $arrage roject, Ranolia H, Rasul H and

    Satpara "am)

    Support the "escon campus committee in preparing proposals for the improvement of

    "escon Head Quarters)

  • 7/24/2019 Objective 2015

    2/3

    ".%/*K/"01S 2(3

    45 65/!un/78

    85 65/!un/78

    10

    ".%/*K/

    "01S 2(3

  • 7/24/2019 Objective 2015

    3/3

top related