1 Community Board 2 – July 18, 2011
NYU 2031 – Phasing
Update to Community Board #2
July 18, 2011
2 Community Board 2 – July 18, 2011
Existing
Conditions
3 Community Board 2 – July 18, 2011
Proposed
Site Plan
4 Community Board 2 – July 18, 2011
Bird’s Eye View, 2031
5 Community Board 2 – July 18, 2011
NYU Community Goals of the
Planned Development
• Phasing should allow the grocery store to be in continual
operation on site
• WSV garage will always be available for its tenants
• New & temporary open spaces will be created before
existing spaces taken offline
• Provision of space for a new public school to be built and run
by the City
6 Community Board 2 – July 18, 2011
Zipper Mobilization
• Relocate Dog Run to
University Village
• Create new seating area
along Bleecker Street South
• Relocate WSV Playground
WSV
PG WSV
Garden
7 Community Board 2 – July 18, 2011
Zipper Mobilization - Temporary Gym
• New Temporary Gym
constructed on the previous
WSV Playground site. o Gym access will be from Mercer
Street
o 3 basketball courts + lockers
• Modify and update the
open spaces along Mercer
Street, including: o LMNOP Play Area
o New Mercer Plaza
Coles
Gym
Temp
Gym
8 Community Board 2 – July 18, 2011
Massing from Scoping Document
9 Community Board 2 – July 18, 2011
Preliminary Sketch of Temporary Gym
10 Community Board 2 – July 18, 2011
Zipper Building
• Supermarket
• Academic Space
• Greene Street Walk
• Athletic Center
• Dorms
• Hotel and Conf. Center
• New Toddler Playground on
University Village site
• Faculty Housing
Supermarket
Temp
Gym
Zipper
Bldg
11 Community Board 2 – July 18, 2011
Bleecker Street School
• The Public School o Grades Pre k – 8
o 100,000 GSF
o Rooftop play area
• NYU Program o Below-grade academic space
o Dormitory above school
Zipper
Bldg
Bleecker
School
12 Community Board 2 – July 18, 2011
New WSV Parking Garage
• Relocate the required
parking from the existing
garage to the new below-
grade structure o The existing garage will remain in
operation until the new garage is
completed
• Create a temporary
playground along
LaGuardia Place
• Create new seating areas
along West 3rd and
Bleecker Streets
New WSV
Garage
Zipper
Bldg
Bleecker
School
13 Community Board 2 – July 18, 2011
The Mercer Building
• Building Program o Academic offices
o Classrooms
• New Open Spaces o Philosophy Garden
o WSV Playground
o Tricycle Garden
o Public Lawn
o Mercer Entry Plaza
Zipper
Bldg
Bleecker
School
Mercer
Bldg
14 Community Board 2 – July 18, 2011
The LaGuardia Building
• Building Program o Academic offices
o Classrooms
• New Open Spaces o LaGuardia Entry Plaza
o LaGuardia (Adrienne’s)
Playground replacement
Zipper
Bldg
Bleecker
School
Mercer
Bldg LaGuardia
Bldg